PROJECT ; Chiller replacement 8000RT FLOOR / SLAB Ground FL SLAB NAME SLAB 250MM THK

CLIENT ; DCAP BUILDING NAMChiller Building ( wEst side )

Slab Thickness (cm) 25.0


Covering of concrete (cm) 4

CONSTANT
fy ksc 4000.00
fc' ksc 280.00
β= ksc 0.85

k = β 6120/(6120 + fy) 0.51


m = fy / 0.85 fc' 16.81
ρ max = 0.75 k / m 0.023 SHORT LONG
ρ = 0.5 ρb 0.015 External(-Mdisc) Middle(+M) Continious(-Mcont)External(-Mdisc) Middle(+M) Continious (-Mcont)
Bending Moment Mu (kg.m/m) -5000.0 10000.0 -5000.0
Effec Deep (actual) (cm) 20.2

Effe Depth of Slab. (Req) (cm) 10.211 14.440 10.211


Check depth of Slab (O.K / No) O.K O.K O.K
Ru = Mu / Φbd² ,b = 1 m, Φ = 0.9 ksc / m 13.615 27.230 13.615
ρ require = (1- √(1-2xRu/ 0.85 fc' ) )/m 1/m 0.004 0.007 0.004

Require As = ρbd cm²/m 7.084 14.643 7.084


Minimum re-Bar (Or Temp re- Bar) As = cm²/m 4.5 4.5
Provide As cm²/m 13.40 26.81 13.40 10.05 10.05 10.05

Provide Dia of Re-Bar ( RB / DB) DB 16 16 16 16 16 16


Spacing Of Re-bar m 0.15 0.075 0.15 0.2 0.2 0.2

Check As and spacing of Re-bar Pass/ No Pass Pass Pass Pass Pass Pass