Daily Report Piping Dept. 08-09
Daily Report Piping Dept. 08-09
Daily Report Piping Dept. 08-09
A. RENCANA KERJA
1 Piping Hydroulic System LCE (Linear Cable Engine) 14/08/23 – 10/09/23 Masri
2 Piping Hydroulic System CDE (Cable Drum Engine) 14/08/23 – 10/09/23 Masri
B. PELAKSANAAN
1 Piping Hydroulic System LCE Prepare isi oli line LCE 420
(Linear Cable Engine) bar.
ITEM BELUM START (item belum mulai kerja sesuai Plan Start)
2
PT. Multi Ocean Shipyard
C. INSPECTION
ITEM INSPECTION (item pemeriksaan oleh QC, OS / Class) di tgl daily report di buat
D. Kendala project