ID : 51Q-BU-0003

KNPC CFP – MAB2 PROJECT


CHECK LIST for DOOR, WINDOWS,
HARDWARE, GLAZING
Tag Description: Tag No:
P.O No: Area(Unit): Turnover System No.:
Subcontractor : Section(Train): Sub–System No.:
Work Package: Report. No : Drawing Ref.:
ITP Ref No / Rev. No RFI No.:

Inspection Result
Item Description of Activities Remarks
Accept Reject N/A

01 Correct materials used for doors, door bucks

02 Correct materials used for window sash and liners

03 Correct materials used for hardware

04 Correct materials used for window glass and putty

05 Correct materials used for electrical components for power operated


doors
06 Correct materials used for guides and panel sections for telescoping
doors
07 Verify the general operation of the doors

08 Frames anchored plumb and level

09 Doors and sashes not inhibited or bound from normal movement

10 Hardware in good mechanical operation

11 Glass well bedded and putty neatly trimmed

12 Operation of overhead or telescoping doors (controls,


smoothness and speed)
13 Telescoping door guides installed, secured and aligned

14 Installation hardware is correct

REMARK

Description Subcontractor Contractor Company

Name

Signature

Date

51Q-BU-0003 Rev. 1
ID : 51Q-BU-0003
KNPC CFP – MAB2 PROJECT
CHECK LIST for DOOR, WINDOWS,
HARDWARE, GLAZING
Tag Description: Tag No:
P.O No: Area(Unit): Turnover System No.:
Subcontractor : Section(Train): Sub–System No.:
Work Package: Report. No : Drawing Ref.:
ITP Ref No / Rev. No RFI No.:

Description Subcontractor Contractor Company

Name

Signature

Date

51Q-BU-0003 Rev. 1