MAHARASHTRA METRO RAIL CORPORATION LIMITED 9 ie
fice of cit Project Manager ~ Reach 3
He. 52/4, Pet as, Gawande ayer, Sreh Nagar, iahgccpnrtancc@graiicon
smarenwrrng— Nogour~ 44015, Moharastr, En usoieounzrssccaa0s4
‘Maha-Metro/CPM-R1 /Superstructure/NCC/Proposals/107 {4-¢. Date: - 07/07/2017
‘oie Nate
‘Subject: “Design and Construction of Elevated part/Superstructre of 4 lane National Highway
Bridge on Constructed Metro Rail Integrated Per in Reach-1 between Aji Station and
[Aeport Station from Ch-1025m to 13663m on North-South Coridor of Nagpur Metro
Rall Project - Regarding Approval for revising billing breakup schedule
Ref; - 1) LOA No: NIC-11/2016/LON/145 (Pr), Dated 12/10/2016
1) NMRCL Letter No: NMRCL/CPM-Ri/VIANHAT/NCC/Corres/67/336, Dated 19/10/2016
Ii) NCC Letter No: NCCL/NAGPUR/NHAI/2017-18/44, Dated 03/07/2017
|W) GCs Letter No: RITES-GC/NMRP/NGP-UT/NHAT Flyover/NZCL/Reach
04/07/2017
Dated
1, Contractor NCCL have submited revised biling breakup schedule for subject work vide letter
Under reference (i) to General Consultant.
2. General Consultant have scrutinized the proposal with respect to the arovisions of contract
and recommended the same for approval of competent authorty of Naha-Metro vide Note
under reference ('}.
3. Considering points appended vide Para 4 of GC’ eter under reference Iv), recommendation
done by GC seems to be in order. Relevant documents are placed at CP-1 to CP-79 of this
fle,
4. In view of above, contractor's submission of revised bling breakup schedule placed at CP 74
1076 of this le fs recommended for approval of the competent authori
ut un for perusal and approval ese.
Bodo oreo
(Shashank iat)
assistant Naraer Reach 1
Recowmended f, approval Please
se.Dy. cores \ 508
oiler
Rise bun. uf Advedule aH Phen be el
i “
a. anes
cPmyReact