ROCK WELL CORPORATION PVT LTD Lahore

DAILY WORK SHEET


Daily work on PNS 28 Aug 2023
th

SR# MACHINE STATUS REMARKS

01 WELDING GENERATOR The generator is on working Sir we have to service the generator which
position
is working in different side
We need engine oil, oil filter, diesel filter
and radiator, the radiator is very weak.
note down
reminder of old work that is pending

02 Tadano Crane Maintenance work in the Sir, this machine needs a lot of
machine ,
machine is not
maintenance, I have given the report to the
working, which I head office
have reported note down
reminder of old work that is pending

03 SANY SR:150 Not, working maintenance required

04 CATERPILLAR CSR TR- this work is pending , this motors


150 power was taken by naveed sahib and
Assalam o Alaikum sir, we have fitted the
by caterpillar C6.4
engine
Farooq sahib after that genuine planetary, sprocket and we have installed
motors is missing
floating seal. We are waiting for Sigma
Naveed Sahib.
What to do with the remaining work of
CSR machine?
05 HITACHI KH:125 the machine is ready to work The report of Hitachi KH-125 has been sent to
the Head Office

06 HITACHI TH:55-1 Machine is not in working position


maintenance report I have
already sent to H.O

07 HITACHI TH:55-2 Machine is not in working position Bilal mechanic was started by the but after starting
maintenance report I have
already sent to H.O
machine it was not working position

08 SWDM:200 Work done machine dispatch on machine load by semi lobed transporter dispatch
Powered by Cummins the DHA Multan
QSB6.7 engine
on 31thmay 2023 from PNS to Multan DHA with
Tahir munir operator and helper hasnin

09 Compressor Machine is not in working


position

10 CNV unit Machine is not in working


position

11 SANY SR-250 the machine is ready to work The machine is ready to work but small works
Are pending, brand new sequence valve, and
sensor required to be on the workshop.

12 Kobelco Crain machine is in working condition it has minor engine work and driver cabin work to be
done
13 Steel bending molding new electric motor installed Electric Motor poly required
machine

14 Steel cutting machine new electric motor installed


machine is ready for work

NOTE:

Asalam o alaikum
Reminder: urgent need 01 workshop mechanic and 02 helpers please provide on Urgent basis
please sir provide bike for PNS

Ikhtiyar ali khan