CADANGAN MENAIKTARAF CELL 2A, 2B Reference No :

& 2C BAGI MEMANJANGKAN JANGKA Memo_04


HAYAT CELL DI TAPAK PELUPUSAN SISA
PEPEJAL DI SUNGAI UDANG, MELAKA.

SITE MEMORANDUM
To : Huls Engineering Sdn Bhd
Tel : 012-227 2855
Attn : Mr. Ramesh
From : C&S Ir Muhamad Abdul Rahman
Date : 6 April 2023

Subject : Existing Underground RC Culvert

A join site inspection on 4th April 2023 is referred.

Following to the discovery of the existing underground RC culvert crossing the proposed cell
extension area, the following action shall be taken :

1. The existing RC culvert shall be remained.


2. The existing sump located in the middle (as shown in Attachment 1) as attached herewith
shall be partially demolish and to be covered with RC slab.
3. The cell base level along the RC culvert section until nearby cell slope shall be with
minimum of 500 mm above the top of the existing culvert.

Your faithfully

……………………………..
(Ir Muhamad Abdul Rahman)

ATTACHMENT : Drawing no. BCE/GSSB/SU/NTC-01 & Photo Dated 4th April 23

Acknowledgement receipt for and on behalf of Huls Engineering Sdn Bhd:

Name : Signature : Date :

CC:

1) Greenviro Solutions Sdn Bhd


ATTACHMENT 1 : EXISTING RC CULVERT

EXISTING SUMP TO BE
PARTIALLY DEMOLISH
AND COVERED WITH RC
SLAB
ATTACHMENT 2 : PHOTO DATED 4th APRIL 23