BILL OF Q

NEW AFR STOR


PT. SOLUSI B

NO DESCRIPTION

I PREPARATION WORKS
1 Survey/ measuring at field
2 Stager & safety tools
3 Mobile crane
4 Tools mobilization
5 Document/ reporting/ As-built drawing (softcopy & hardcopies)
Include:
Supply water & power for project
Demolishing of existing structures if any: concrete floor, concretes & steels, etc

TOTAL

II CIVIL WORKS
A SOIL IMPROVEMENT
1 Soil excavation
Improvement soil (lime stones) and compaction. (Include tes CBR Inplace
2
= min 15%)
3 Back fill Compacted

B FOUNDATION F1

1 Compacted Sand 150 mm (include Plastik Cor or Lean Concrete thk 50mm)

2 Concrete K-250

3 Reinforcing steel D13

4 Reinforcing steel D13

5 Reinforcing steel D13

6 Formwork

C FOUNDATION F2
1 Compacted Sand 150 mm (include Plastik Cor or Lean Concrete thk 50mm)

2 Concrete K-250

3 Reinforcing steel D 13

4 Reinforcing steel D 13

5 Reinforcing steel D 13

6 Formwork

D RETAINING WALL (RW-1)

1 Compacted Sand 150 mm (include Plastik Cor or Lean Concrete thk 50mm)

2 Concrete K-350 Water tight

Water proofing CONPLAST WP421 2L/m3


3 Water stop type C x 250 (ex fosroc)

4 Reinforcing steel D 13

5 Reinforcing steel D 13

6 Reinforcing steel D 13

7 Reinforcing steel D 13

8 Reinfocing steel dia. 10 (stirrup)


9 Reinfocing steel dia. 10 (shear)
10 Formwork

E STIFFENER OF RW

1 Concrete K-350

2 Reinfocing steel dia. 10


3 Reinfocing steel dia. 10
4 Formwork

F PEDESTAL COLUMN CC1


1 Concrete K-250

2 Reinfocing steel D 16
3 Reinfocing steel dia. 10 (stirrup)

4 Reinfocing steel dia. 10 (stirrup)

5 Anchor bolts M 20
6 Grouting 50 thk 400x900
7 Formwork

G PEDESTAL COLUMN CC2


1 Concrete K-250

2 Reinfocing steel D 16

3 Reinfocing steel dia. 10 (stirrup)

4 Anchor bolts M 20
5 Grouting 50 thk 400x400
6 Formwork

H BUILDING FLOOR 180 thk.

1 Compacted sand 150 mm

2 Concrete K-300
3 Reinfocing wire mesh M8-150 layers
4 Formwork
5 Cutting Concrete
6 Construction joint (Dowel)
7 Sealer compound (Expansion Joint)

III STEEL STRUCTURE WORKS


Steel structure type JIS G 3101 (SS400)

Rust Removing
Sand Blasting SA 2.5
Prime Coat (2pack)
Epoxy with Zinc silicate or (equivalent)
75 microns thk
Scond Coat (2pack)
Epoxy paint
125 microns thk
Finish Coat
Pure Recotable polyuretane finish
50 microns thk
A COLUMN CC1
1 Black pipe diameter 4" x 4.5mm
2 Black pipe diameter 3" x 3.2mm
3 Black pipe diameter 3" x 3.2mm
4 Plate and bolt connection

B COLUMN CC2
1 Black pipe diameter 4" x 4.5mm
2 Plate and bolt connection

C RAFTER RF-1
1 Black pipe diameter 4" x 4.5mm
2 Black pipe diameter 4" x 4,5mm
3 Black pipe diameter 3" x 3.2mm
4 Black pipe diameter 3" x 3.2mm
5 Reducer, Plate and bolt connection

D PURLIN
1 Gird C-150x65x20x3,2
2 Sagrod dia.12
3 Plate and bolt connection

E TIE BEAM
1 TB1 Black pipe diameter 4" x 4.5mm
2 TB2 Black pipe diameter 3" x 3.2mm
3 Plate and bolt connection

F BRACING
1 TB1 Black pipe diameter 4" x 3.2mm
2 TB1 Black pipe diameter 4" x 3.2mm
3 BR1 Black pipe diameter 3" x 3.2mm
4 BR1 Black pipe diameter 3" x 3.2mm
5 Plate and bolt connection

G SIDING AND FRAME LINE 1 & 10


1 Gird C 150x65x20x3,2
2 Gird C 150x65x20x3,2
3 Sagrod dia.12
4 Plate and bolt connection

H SIDING AND FRAME LINE A & B


1 Gird C 150x65x20x3,2
2 Sagrod dia.12
3 BR1 Black pipe diameter 3" x 3.2mm
4 Plate and bolt connection

I SIDE BRACING
1 Black pipe diameter 3" x 3.2mm
2 Plate and bolt connection

J ROOF AND SIDING SHEET


1 SIDING LINE 1 & 10
Corugated zincalume 0.45 Thk
G550, 125 g/m2 minimum coating mass
Transparant siding

2 SIDING AND FRAME LINE A & B


Corugated zincalume 0.45 Thk
G550, 125 g/m2 minimum coating mass
Transparant siding

3 ROOF
Corugated zincalume 0.45 Thk
G550, 125 g/m2 minimum coating mass
Transparant siding

4 Corner Flashing zincalume sheet 0.45 Thk

TOTAL STE

IV INFRASTRUCTURE WORKS
A PARKING FLOOR 180 thk.

1 Compacted sand 150 mm

2 Concrete K-300
3 Reinfocing wire mesh M8-150 layers
4 Formwork
Cutting Concrete
Construction joint (Dowel)
Sealer compound (Expansion Joint)

B PARKING FLOOR 180 thk.

1 Compacted sand 150 mm

2 Concrete K-300
3 Reinfocing wire mesh M8-150 layers
4 Formwork
Cutting Concrete
Construction joint (Dowel)
Sealer compound (Expansion Joint)

C ENVIROMENT DRAINAGE (TYPE-1)


1 Soil excavation

2 Compacted sand 100 mm

3 Concrete K-250
4 Reinfocing steel D 13
5 Reinfocing steel D 13
6 Formwork
7 Back fill Compacted
8 Cover Plate 20mm

D ENVIROMENT DRAINAGE (TYPE-2)


1 Soil excavation

2 Compacted sand 100 mm

3 Concrete K-250
4 Reinfocing steel D 13
5 Reinfocing steel D 13
6 Formwork
7 Back fill Compacted

E PIT CONTROL

1 Compacted sand 100 mm

2 Concrete K-250
3 Reinforcing steel dia 10
4 Reinforcing steel dia 10
5 Reinforcing steel dia 10
6 Formwork

TOTAL INFRASTRUCTURE WORKS

V ELECTRICAL WORKS
A MCC
1 Supply and install drawer feeder for lighting panel

B Lighting
1 Supply and install lighting panel (complete with auto/manual control)

2 High bay light Industrial LED lamp, dust proof, IP65 complete with hanger

3 Outdoor LED tube lamp ( IP65 ) include bracket


4 Lightning Protection
5 Streetligthing hexagonal 9 meter (HDG)

C Material Installation
Supply and install ladder type W, Size U200 x H100 x L3000 mm with
1
cover complete w/ accessories
Supply and install hot dip galvanized conduit G22 complete with
2
accessories
Supply and install cable pit access from existing building to new building
3
c/w pipe and box control
4 Digging for cable street lamp

D Pulling Cables
Purchase and pulling cable power N2XY 5Cx16mmsq (MCC to AFR
1
Storage)
2 Purchase and pulling cable power N2XY 3x2.5mmsq
3 Purchase and pulling cable power N2XY 5x4mmsq
4 Purchase and pulling cable BC 90
5 Purchase and pulling cable N2XGByY 5x4mmsq

E Accessories for wiring, name plates/HAC, commisioning

TOT

VI FASILITAS PENUNJANG
1 Papan Nama Storage
2 Tandon air Fiber 750 L
3 Pondasi Tower Air 50x50x50cm
Excavation, reinforcing steel, concrete K-225, formwork
4 Tower Air H = 3 m
Rangka besi siku 50x50
Baseplate 10 mm + Anchor Bolt M12
Pipa PVC AW 1" & 1/2"
5 Pengadaan dan Instalasi Eye Wash

TOTAL E
BILL OF QUANTITY (BOQ)
NEW AFR STORAGE CILACAP PLANT
PT. SOLUSI BANGUN INDONESIA

MATERIAL
EXPLANATION QUANTITY
Rate Amount

1.00 Lot
1.00 Lot
1.00 Lot
1.00 Lot
1.00 Lot

s & steels, etc

TOTAL PREPARATION WORKS

- m3

6 locations for CBR tests - m3

- m3

Mandatory thickness = 150mm should be


compacted, + Plastik Cor /or Lean Concrete thk 72.20 m2 -
50mm
Include concrete compression test 18.00 m3
submit steel mill certificate before material on
526.24 kg -
site. SNI. /Or do the tensile test
submit steel mill certificate before material on
343.20 kg -
site. SNI. /Or do the tensile test
submit steel mill certificate before material on
124.80 kg -
site. SNI. /Or do the tensile test
48.00 m2 -
Mandatory thickness = 150mm should be
compacted, + Plastik Cor /or Lean Concrete thk 10.24 m2 -
50mm
Include concrete compression test 2.30 m3
submit steel mill certificate before material on
74.88 kg -
site. SNI. /Or do the tensile test
submit steel mill certificate before material on
44.93 kg -
site. SNI. /Or do the tensile test
submit steel mill certificate before material on
99.84 kg -
site. SNI. /Or do the tensile test
7.68 m2 -

Mandatory thickness = 150mm should be


compacted, + Plastik Cor /or Lean Concrete thk 256.80 m2 -
50mm

Mandatory one time concrete pouring for 4


meter high wall. Include concrete compression 213.14 m3 -
test

128.40 m1 -
submit steel mill certificate before material on
2,247.00 kg -
site. SNI. /Or do the tensile test
Overlap 40D. Mill certificate. SNI 3,081.60 kg -
submit steel mill certificate before material on
1,527.96 kg -
site. SNI. /Or do the tensile test
submit steel mill certificate before material on
8,988.00 kg -
site. SNI. /Or do the tensile test
SNI 6,933.60 kg -
4x2 @1 meter 359.52 kg -
Should be ready for one time concrete pouring 1,129.92 m2 -

one time concrete pouring 4 meter high or using


Water proofing CONPLAST WP421 2L/m3. 13.04 m3 -
Include concrete compression test
SNI 520.96 kg -
SNI 559.63 kg -
Should be ready for one time concrete pouring 183.15 m2 -

Include concrete compression test 10.80 m3 -


submit steel mill certificate before material on
1,390.40 kg -
site. SNI. /Or do the tensile test
submit steel mill certificate before material on
320.67 kg -
site. SNI. /Or do the tensile test
submit steel mill certificate before material on
296.00 kg -
site. SNI. /Or do the tensile test
160.00 unit -
20.00 Plcs -
78.00 m2 -

Include concrete compression test 0.96 m3 -


submit steel mill certificate before material on
166.85 kg -
site. SNI. /Or do the tensile test
submit steel mill certificate before material on
39.47 kg -
site. SNI. /Or do the tensile test
16.00 unit -
4.00 Plcs -
9.60 m2 -

Mandatory thickness = 150mm should be


compacted, + Plastik Cor /or Lean Concrete thk 1,046.60 m2 -
50mm
Include concrete compression test 188.39 m3 -
2 layers, miil certificate/ SNI. 2,093.20 m2 -
94.68 m2 -
382.00 m1
ф16 170.00 m1 -
Asphalt, sand 382.00 m1 -

TOTAL CIVIL WORKS

Total coating 250 microns thk


3,893.60 kg -
337.55 kg -
1,134.17 kg -
536.53 kg -

1,829.99 kg -
183.00 kg -

2,646.43 kg -
3,011.46 kg -
1,518.98 kg -
476.22 kg -
765.31 kg -

9,147.18 kg -
ф10mm 416.52 kg -
956.37 kg -

1,338.43 kg -
1,856.53 kg -
319.50 kg -

574.31 kg -
335.82 kg -
845.23 kg -
461.77 kg -
221.71 kg -

420.56 kg -
1,486.98 kg -
74.05 kg -
198.16 kg -

4,160.54 kg -
166.61 kg -
1,001.31 kg -
532.85 kg -

688.60 kg -
86.08 kg -

262.00 m2 -
Strippes Design (Closed + Transparent Siding)
regarding the drawing. SPANDEK Ex:LYSAGHT

554.00 m2 -
Strippes Design (Closed + Transparent Siding)
regarding the drawing. SPANDEK Ex:LYSAGHT

1,450.00 m2 -
Strippes Design (Closed + Transparent Siding)
regarding the drawing. SPANDEK Ex:LYSAGHT

20.00 m1 -

TOTAL STEEL STRUCTURE WORKS

Mandatory thickness = 150mm should be


compacted, + Plastik Cor /or Lean Concrete thk 306.50 m2 - -
50mm
Include concrete compression test 55.17 m3 - -
2 layers, miil certificate/ SNI. 613.00 m2 - -
30.86 m2 - -
171.45 m1 - -
ф16 42.28 m1 - -
Asphalt, sand 171.45 m1 - -

Mandatory thickness = 150mm should be


compacted, + Plastik Cor /or Lean Concrete thk 131.00 m2 - -
50mm
Include concrete compression test 23.58 m3 - -
2 layers, miil certificate/ SNI. 262.00 m2 - -
13.19 m2 - -
73.28 m1 - -
ф16 18.07 m1 - -
Asphalt, sand 73.28 m1 - -

21.81 m3
Mandatory thickness = 150mm should be
compacted, + Plastik Cor /or Lean Concrete thk 29.08 m2 - -
50mm
5.82 m3 - -
415.84 kg - -
423.40 kg - -
90.15 m2 - -
8.72 m3
3,424.17 kg - -

93.06 m3 -
Mandatory thickness = 150mm should be
compacted, + Plastik Cor /or Lean Concrete thk 124.08 m2 - -
50mm
24.82 m3 - -
1,774.34 kg - -
1,806.60 kg - -
384.65 m2 - -
37.22 m3 - -

Mandatory thickness = 150mm should be


compacted, + Plastik Cor /or Lean Concrete thk 9.80 m2 - -
50mm
3.80 m3 - -
168.64 kg - -
119.04 kg - -
59.52 kg - -
56.85 m2 - -

TRUCTURE WORKS

1.00 Lot
1.00 Lot

19.00 ea

10.00 ea
1.00 Lot
6.00 ea

50.00 btg

20.00 btg

12.00 m1

200.00 m1

600.00 m1

150.00 m1
100.00 m1
150.00 m1
200.00 m1

1.00 Lot

TOTAL ELECTRICAL WORKS

2.00 unit -
1.00 unit -
1.00 Lot -

1.00 unit -

1.00 unit -

TOTAL EYE WASH & TANDON AIR -