TABLE OF CONTENTS OFFICE OF THE BUILDING OFFICIAL

LAND USE & ZONING

LINE AND GRADE

ARCHITECTURAL

CIVIL/STRUCTURAL

ELECTRICAL

1 PERSPECTIVE
A1
MECHANICAL

SANITARY

PLUMBING

ELECTRONICS

GEODETIC ENGINEER

2 SITE DEVELOPMENT PLAN 3 VICINITY MAP


A1 A1
DWG NO.

A
1
1.86 5.17 5.00 4.00 5.00 5.00 1.96

3.71
HALLWAY

EXISTING EXISTING
BUILDING BUILDING

5.00
ROOM AREA ROOM AREA ROOM AREA ROOM AREA
HALLWAY
(23 SQ.M.) (23 SQ.M.) (23 SQ.M.) (23 SQ.M.)

1.30
HALLWAY HALLWAY

GREEN SPACE

1.30
GREEN SPACE

GREEN SPACE
GREEN SPACE GREEN SPACE

1 FLOOR PLAN
A2

DECORATIVE STEEL FRAMED STRUCTURE

6mm THK. GLASS WALL ON ALUMUNIM FRAME


0.50

TOP OF ROOF BEAM


2.50

TOP OF ROOF BEAM


3.00

TOP OF DECORATIVE STEEL


FRAMED STRUCTURE
FINISH FLOOR LINE

2.50
GLASS WALL ON ALUMUNIM FRAME
2 FRONT ELEVATION
A2
TOP OF ROOF BEAM

DECORATIVE STEEL FRAMED STRUCTURE

3.00
GLASS WALL ON ALUMUNIM FRAME
TOP OF DECORATIVE STEEL FRAMED STRUCTURE PRE-PAINTED METAL ROOFING
0.50

FINISH FLOOR LINE


2.50

TOP OF ROOF BEAM

4 TYPICAL SIDE ELEVATION


A2
3.00

FINISH FLOOR LINE

3 REAR ELEVATION
A2

DWG NO.

A
2
GENERAL NOTES & SPECIFICATION
GENERAL CONSTRUCTION

1. IN THE INTERPRETATION OF THESE DRAWINGS INDICATED DIMENSIONS SHALL GOVERN ALL DIMENSIONS, CONSTRUCTION SPECIFICATION:2013 DPWH STANDARD SPECIFICATIONS FOR PUBLIC WORKS 3. STRUCTURAL STEEL
DISTANCES AND SIZES SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES. STRUCTURES (VOL. II AND VOL. III)
a. IN ACTUAL FABRICATION OF STEEL TRUSSES, MEMBERS MEETING AT A POINT
2. UNLESS OTHERWISE SPECIFIED ON PLANS, ALL DIMENSIONS ARE IN METERS. 1. SETTING OUT SHALL HAVE THEIR GRAVITY AXIS INTERSECT AS NEARLY AS PRACTICABLE AT A
COMMON POINT.
DESIGN CRITERIA THE SETTING OUT AND THE ELEVATIONS OF THE DIFFERENT COMPONENTS OF THE STRUCTURE
SHALL BE APPROVED BY THE ENGINEER PRIOR TO THE START OF ANY CONSTRUCTION WORK. b. THE CONTRACTOR SHALL PROVIDE TEMPORARY ERECTION BRACINGS AND
1. DESIGN SPECIFICATION
SHORING, AND MAKE ACTUAL MEASUREMENTS IN THE FIELD PRIOR TO
ALL DESIGN SHALL CONFORM TO NATIONAL STRUCTURAL CODE OF THE PHILIPPINES (NSCP) FOR
FABRICATION / INSTALLATION OF ALL TRUSSES.
BUILDINGS, TOWERS & OTHER VERTICAL STRUCTURES, 2015, WHICH INCLUDES SEISMIC DESIGN.
2. REINFORCED CONCRETE c. THE CONTRACTOR SHALL PREPARE AND SUBMIT SHOP DRAWINGS FOR ALL
2. LOADINGS
STRUCTURAL STEEL WORKS. THESE SHOP DRAWINGS SHALL BE APPROVED BY
a. CONCRETE MIX AND PLACING
a. LIVE LOAD b. DEAD LOAD c. WIND LOAD THE REGIONAL DIRECTOR, DPWH R.O. XI, BEFORE ANY FABRICATION COMMENCES.
(1) FLOOR = 1.90 kPa (1) DESIGN OF CONCRETE MIX SHALL MEET THE DESIGN CONCRETE STRENGTH GIVEN
(1) CONCRETE = 24.0 kN/m^3 P = Ce Cq Qs I 4. COLUMNS, BEAMS & SLAB
(1) STAIRS = 4.80 kPa UNDER ITEM 1 OF MATERIALS.
(2) STEEL = 76.93 kN/m^3 where:
(1) CORRIDORS = 4.80 kPa a. THE CONTRACTOR SHALL SUBMIT DESIGN COMPUTATIONS AND SHOP DRAWINGS
(3) CHB = 2.73 kPa P = ACTUAL WIND PRESSURE (2) CONCRETE SHALL BE DEPOSITED, VIBRATED AND CURED IN ACCORDANCE WITH
FOR ALL COLUMNS, BEAMS & SLABS, DULY SIGNED AND SEALED BY A
(4) STEEL DECK = 0.08 kPa Ce = GUST FACTOR COEFF. = 0.67 THE SPECIFICATIONS
STRUCTURAL ENGINEER BEFORE ANY FABRICATION, ERECTION AND INSTALLATION
(5) CEILING = 0.38 kPa Cq = PRESSURE COEFF. = 0.30 INWARD
(6) TILES = 0.96 kPa (3) THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL PLACING COMMENCES. THESE SHOP DRAWINGS SHALL BE APPROVED BY THE AUTHORIZED
= 0.70 OUTWARD
SEQUENCES FOR ALL CONCRETING WORK. APPROVING AUTHORITY
Qs = 1.0 kPa
d. SEISMIC LOAD
I = OCCUPANCY FACTOR = 1.5 b. BAR BENDING, SPLICING AND PLACING
ZIC(W)
V=
Rw (1) THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL OF SHOP DRAWINGS INDICATING THE
5. BUILDING FOUNDATION
where: BENDING, CUTTING, SPLICING AND INSTALLATION OF ALL REINFORCING BARS.
V = TOTAL BASE SHEAR C = NUMERICAL COEFF. DETERMINATION a. FOUNDATION IS AN ISOLATED FOOTING WITH STIFF TIE BEAM AND DEPTH OF
(2) BARS SHALL BE BENT COLD, BARS PARTIALLY EMBEDDED IN CONCRETE SHALL NOT BE FIELD BENT UNLESS
Z = SEISMIC ZONE FACTOR = 0.40 1.25 S EMBEDMENT IS @ 1.50M. FROM NATURAL GROUND LEVEL.
C= < 2.75 PERMITTED BY THE ENGINEER. b. ALLOWABLE SOIL BEARING CAPACITY ASSUMED FOR DESIGN OF FOOTING IS 100 kPa
I = IMPORTANCE FACTOR = 1.50 T^ 2/3
c. CONTRACTOR SHALL CONDUCT SOIL INVESTIGATION AT SITE AND CHANGE
Rw = NUMERICAL COEFF. = 8.5 S = SITE COEFF. = 1.0 (3) BAR SPLICING NOT INDICATED ON DRAWINGS SHALL BE SUBJECT TO THE APPROVAL OF THE ENGINEER. FOUNDATION DESIGN.
W = TOTAL DEAD WEIGHT OF BLDG. T = FUNDAMENTAL PERIOD OF VIBRATION d. INCASE THE ACTUAL SOIL BEARING PRESSURE IS FOUND LESS THAN
(4) WELDED SPLICES, IF APPROVED BY THE ENGINEER, SHALL DEVELOP IN TENSION AT LEAST 125% OF THE
THE ALLOWABLE VALUE OF 100 KPa, NOTIFY THE IMPLEMENTING AGENCY FOR
SPECIFIED YIELD STRENGTH OF BARS. PROPER REDESIGN OF FOOTING BEFORE THE START OF THE PROJECT
MATERIALS
e. NO FOOTING SHALL REST ON FILL
(5) NOT MORE THAN 50% OF THE BARS AT ANY ONE SECTION SHALL BE SPLICED.
1. CONCRETE
(6) UNLESS OTHERWISE SHOWN ON DRAWINGS, THE CLEAR DISTANCE BETWEEN PARALLEL BARS IN A LAYER
UNLESS INDICATED OTHERWISE ON PLANS, THE CONCRETE CLASS AND STRENGTH SHALL BE AS FOLLOWS:
SHALL NOT BE LESS THAN 1.5 TIMES THE NOMINAL DIAMETER OF THE BAR NOR LESS THAN 1.5 TIMES
THE MAXIMUM SIZE OF COARSE AGGREGATE, THE CLEAR DISTANCE BETWEEN LAYERS SHALL NOT BE LESS
28-DAY CYLINDER
THAN 25mm NOR ONE BAR DIAMETER. THE BARS IN THE UPPER LAYER SHALL BE PLACED DIRECTLY
STRUCTURAL MEMBER CLASS STRENGTH
ABOVE THOSE IN THE BOTTOM LAYER.
MPa PSI

FOOTINGS AND TIED BEAMS A 20.70 3000


c. CONCRETE COVER TO REINFORCEMENT
SLABS ON FILL AND PARTITIONS A 20.70 3000 MINIMUM CONCRETE COVER TO REINFORCEMENT SHALL BE 75mm UNLESS SHOWN OTHERWISE ON DRAWINGS.

d. CONSTRUCTION JOINT

2. REINFORCING STEEL (1) THE POSITION AND FORM OF ANY CONSTRUCTION JOINTS SHALL BE AS SHOWN ON DRAWINGS OR AS AGREED
WITH THE ENGINEER.
(a) REINFORCING STEEL SHALL CONFORM TO AASHTO M31 (ASTM A615), GRADE 40, DEFORMED WITH
MINIMUM YIELD STRENGTH, fy=276 MPa (40,000 PSI) FOR BARS 16mm Ø OR SMALLER AND GRADE 60 (2) THE INTERFACE BETWEEN THE FIRST AND SECOND POUR OF CONCRETE SHALL BE ROUGHED WITH AN AMPLITUDE
WITH MINIMUM YIELD STRENGTH, fy=414MPa (60,000 PSI) FOR LARGER THAN 16mm Ø. OF 6mm MINIMUM.

(b) REINFORCING STEEL SHALL BE FREE OF MILL SCALES,OIL OR ANY SUBSTANCES WHICH WILL WEAKEN
e. FALSEWORK
THE BOND WITH CONCRETE.
ALL FALSEWORK SHALL BE DESIGNED BY THE CONTRACTOR SUBJECT TO
3. STRUCTURAL STEEL, BOLTS AND WELDS THE APPROVAL BY THE ENGINEER. THE FALSEWORK SHALL BE REMOVED
ONLY AS DIRECTED BY THE ENGINEER.

f. FORMWORK
MATERIAL SPECIFICATION
FORMWORKS SHALL BE CONSTRUCTED SUCH THAT IT WILL NOT YIELD
TRUSSES, PURLINS, PLATES, ASTM A-36 UNDER THE LOAD AND SHALL BE AS TO AVOID THE FORMATION OF FINE.
BRACINGS, ETC. fy = 248 MPa

BOLTS ASTM A-307


fv = 69 MPa; fst = 96.60 MPa

WELDS E = 60xx ELECTRODES


fv = 94 MPa

DWG NO.

S
1
NOTES:
I N D E X
bar Ld (mm) DESIG- 101.6 152.4
diameter NATION mm mm
(mm)
chb chb
TOP BARS OTHERS

DIMENSIONS OF RC
10 STIFFENER COLUMN

1 CLASS "B" SPLICE LENGHTS


AT INTERSECTION
AT CORNER NOTE :
1. EXTEND LINTEL BEAM
AND BOND BEAM AT
1 1 LEAST 0.60 MTR. ON
EACH SIDE OF THE
4 WALL OPENING.
ext. see

S-1
4
90 DEGREE HOOK
ext. see

S-1
180 DEGREE HOOK

TYPICAL DETAIL AT
BAR SIZE
(mm)
Ldh
(mm)
9 WALL OPENING

AT END/JAMB INTERSECTING R.C. COL. OR WALL


MINIMUM HOOKED BARS AT BEAM
2 DEVELOPMENT LENGTH 5 TYP. CHB CONNECTION DETAILS 7 TYP. CONSTRUCTION JOINT DETAIL

1
S-1
3

1
S-1 INTERIOR PARTITION INSIDE DIMENSIONS OF MEASURING
90 HOOK 180 HOOK BOX FOR CONCRETE PROPORTIONING

TYPICAL INTERIOR CHB


bar Ldh (mm) bar D 180 HOOK 90 HOOK
2 8 WALL SECTION DETAIL
diameter SIZE (mm)
(mm) L(mm) L(mm)
(mm) TOP BARS OTHERS

0.25
1
S-1

DEVELOPMENT LENGTH 6 STANDARD BEAM-COLUMN DETAIL


3 OF STRAIGHT BARS 4 STANDARD HOOK DIMENSIONS 0.3
0 0.3
0

NOTE : FOR 40KG. CEMENT

DETAIL OF
11 MEASURING BOX
NOT TO SCALE

DWG NO.

S
2
33.25
SCHEDULE OF FOOTING
4.08 5.28 5.13 4.30 5.13 5.28 4.08
DIMENSION DEPTH
(meters) REINFORCEMENT BELOW
FOOTING NATURAL
MARK L S GROUND LINE
WF3 WF3
L S t
2.00

2.00
100mm THK. CONCRETE Bar Ø Spacing Bar Ø Spacing
SLAB ON FILL WITH
(mm) (mm) (mm) (mm) (D)
WF3 10mm Ø DRB SPACED: WF3
600mm O.C. BOTH
DIRECTION F1 1.50 1.50 0.25 16 200 16 200 1.20
1.71

1.71
F2 2.40 1.50 0.25 16 200 16 200 1.20
C2 C2

F1/C1 WF2 WF2 WF2 WF2 F1/C1


F3 0.80 0.80 0.20 12 200 12 200 1.00
F1/C1 F1/C1 F1/C1 F1/C1
WF3

WF3
100mm THK. CONCRETE 100mm THK. CONCRETE 100mm THK. CONCRETE 100mm THK. CONCRETE 100mm THK. CONCRETE
SLAB ON FILL WITH SLAB ON FILL WITH SLAB ON FILL WITH SLAB ON FILL WITH SLAB ON FILL WITH
WF1

WF1

WF1

WF1

WF1

WF1
5.10

5.10
10mm Ø DRB SPACED : 10mm Ø DRB SPACED : 10mm Ø DRB SPACED: 10mm Ø DRB SPACED: 10mm Ø DRB SPACED:
600mm O.C. BOTH 600mm O.C. BOTH 600mm O.C. BOTH 600mm O.C. BOTH 600mm O.C. BOTH
DIRECTION DIRECTION DIRECTION DIRECTION DIRECTION

C2
WF3 C2 WF3
WF2 WF2 WF2 WF2
SCHEDULE OF WALL FOOTING
1.35

1.35
F2/C2 F2/C2 F2/C2 F2/C2 F2/C2 F2/C2
DIMENSION DEPTH
WF3
WF3 (meters) REINFORCEMENT BELOW
1.00

1.00
WF3 WF3 WF3 WF3
WF1

WF1
F3/C3 F3/C3
F3/C3 F3/C3 NATURAL
0.32

0.32
C3 C3 WALL
C3 C3 WF3 C3 WF3 C3 C3
FOOTING L S GROUND LINE
WF1

WF1
1.42

1.42
0.60 WF1 0.60
C3 WF1 C3 L W t
1.49 1.49
WF MARK Bar Ø Spacing Bar Ø Spacing
F1 1.50 0.66 0.66 1.50 1 (D)
C3
W
C3 (mm) (mm) (mm) (mm)
2.13 2.10 2.56 2.57 2.56 2.56 2.15 2.15 2.56 2.57 2.56 2.10 2.13 WF1 0.40 0.20 12 100 10 300 0.60
WF2 0.40 0.20 12 100 10 300 -

1 FOUNDATION PLAN WF3 0.20 0.10 10 100 10 300 0.20


S3

SCHEDULE OF COLUMNS
50mm X 150mm RECTANGULAR STEEL
TUBE MAIN FRAME 4.30
COLUMN DIMENSION
MARK (mm) SECTION LATERAL TIES
2.15 5.12 5.13 2.15 2.15 5.13 5.12 2.15

RB1 RB1 RB1 RB1

RB1 10 MM Ø LATERAL TIES


SPACED:
1.89

1.89
C1 250 x 250 mm 8-12mm Ø 6 - 50 MM, 3 - 75 MM, 3 - 100
MM, REST @ 150 MM O.C.
SYMMETRICAL UP TO CL.
5.15

5.15
1.89

1.89
RB2

RB2

RB2

RB2

RB2

RB2
10 MM Ø LATERAL TIES
1.36

1.36
RB1 RB1 RB1 RB1 RB1 SPACED:

50mm X 100 C2 300 x 300 mm 8-16mm Ø 6 - 50 MM, 3 - 75 MM, 3 - 100


MM, REST @ 150 MM O.C.
1.67

1.67
RB3

RB3

RB3

RB3

RB3

RB3
RECTANGULAR
RB4 RB4 RB4 RB4
SYMMETRICAL UP TO CL.
STEEL TUBE
1.40

1.40
10 MM Ø LATERAL TIES
SPACED:
0.68
1.41 0.90 1.19 2.56 2.57 2.56 2.56 2.15 2.15 2.56 2.56 2.57 2.56 1.19 0.90
0.68
1.41
C3 200 x 200 mm 4-12mm Ø 6 - 50 MM, 3 - 75 MM, 3 - 100
MM, REST @ 150 MM O.C.
SYMMETRICAL UP TO CL.

2 ROOF BEAM/CANOPY FRAMING PLAN


S3

DWG NO.

S
3
B
0.80 5.27 5.18 4.25 5.13 13.70 5.27
B

8.24
A

0.76
0.80

0.15
ST-1A ST-1A ST-1B ST-1B ST-1B ST-1B ST-1A ST-1A A
A A
A
0.40 0.40 0.60 0.60 0.35 0.35 0.51 0.50 1.00 1.00 1.00 0.70 0.80

2.00 5.40
T-1

T-1

T-1

T-1

T-1

T-1
T-2

T-2

T-2

T-2
5.40

T1
ST-2A ST-2A ST-2B ST-2B ST-2B ST-2B ST-2A ST-2A

ST-3A ST-3A ST-3B ST-4B ST-3B ST-3B ST-3A ST-3A

D
0.80
D

0.60 8.24
C

0.76

0.77
STEEL FRAMED DECORATIVE PANELS (SEE DETAIL)
C

0.15
C
C C
C
0.40 0.40 0.60 0.60 0.35 0.35 0.51 0.50 1.00 1.00 1.00 0.70 0.80

1 ROOF FRAMING PLAN 2.00 5.40

S 4
T2

4.30 4.30
0.54 0.54
0.54 0.54

50mm X 150mm RECTANGULAR STEEL

0.45
TUBE MAIN FRAME 4.30 0.20

2.15 5.12 5.13 2.15 2.15 5.13 5.12 2.15


ST-1
RB1 RB1 RB1 RB1 ST-2
RB1
1.89

1.89
2.56
0.64 0.64
2.60
0.65
5.15

5.15
0.20
1.89

1.89
RB2

RB2

RB2

RB2

RB2

RB2
ST-1A 0.20

ST-1B
1.36

1.36
RB1 RB1 RB1 RB1 RB1
2.56
0.64 0.64
50mm X 100
1.67

1.67
RB3

RB3

RB3

RB3

RB3

RB3
RECTANGULAR 2.60

0.35
STEEL TUBE RB4 RB4 RB4 RB4 0.65
1.40

1.40

0.35
ST-2A

ST-2B
0.68 0.68
1.41 0.90 1.19 2.56 2.57 2.56 2.56 2.15 2.15 2.56 2.56 2.57 2.56 1.19 0.90 1.41 2.56
0.64 0.64 2.60
0.65

0.70
ROOF PLAN

0.70
2
S 4
ST-3A
ST-3B
DWG NO.

S
3
50MM x 100MM x 1.5MM thk.
RECTANGULAR STEEL TUBE FRAME
0.80mm THK. PRE-PAINTED METAL SHEET
2-50mm X 100mm X 1.5mm THK. RECTANGULAR
STEEL TUBE PERIMETER FRAME
12.20
0.80 10.60 0.80

0.87
2.50
0.86
0.77
2-50mm X 100mm X 1.5mm THK. RECTANGULAR
STEEL TUBE FRAME

50MM x 100MM x 1.5MM thk.


RECTANGULAR STEEL TUBE FRAME

0.70
DECORATIVE STEEL FRAME
0.76 1.29 1.28 1.40 1.28 1.30 1.40 1.30 1.34 0.85
1 STRUCTURE DETAIL
S5
0.60

0.60
2-50mm X 100mm X 1.5mm 50mm X 100mm X 1.5mm
2.40

2.40
THK. RECTANGULAR STEEL THK. RECTANGULAR
TUBE FRAME STEEL TUBE FRAME
6.00

6.00
50mm X 50mm 50mm X 50mm
SQUARE STEEL SQUARE STEEL
TUBE TUBE
2.40

2.40
TYPICAL SIDE DECORATIVE
STEEL FRAMED PANEL CENTER DECORATIVE STEEL
0.60

0.60
2 DETAIL 3 FRAMED PANEL DETAIL
S5 S5

DWG NO.

S
5
EXISTING EXISTING
BUILDING BUILDING

1 1
PB-102 PB-103

PB 101

PB 102

PB 103

PB 104
1 1
PB-101 PB-104

1 LIGHTING LAYOUT PLAN


E1

3 3 3 3
PB-101 PB-102 PB-103 PB-104

ACU ACU ACU ACU

ACU ACU

EXISTING EXISTING
BUILDING BUILDING
PB 101

PB 102

PB 103

PB 104
2 2 2 2
PB-101 PB-102 PB-103 PB-104

GREEN SPACE GREEN SPACE

GREEN SPACE
GREEN SPACE GREEN SPACE

1 POWER LAYOUT PLAN


E1

DWG NO.

E
1
M M M M

1 RISER DIAGRAM
E 2

DWG NO.

E
2