K E M E N T E R I A N P E K E R J A A N U M U M D A N P E R U M A H A N R A KY A T

DIREKTORAT JENDERAL SUMBER DAYA AIR


B A L A I W I L A Y A H S U N G A I S U L A W E S I I I I P A L U
SNVT PELAKSANAAN JARINGAN SUMBER AIR
WS. PALU - LARIANG, WS. PARIGI - POSO, WS. KALUKU - KARAMA PROVINSI SULAWESI TENGAH
Jalan Abdul Rahman Saleh No. 230 Palu Telepon 0451 - 482147 Faksimili 0451 - 482101

RIVER IMPROVEMENT AND SEDIMENT


CONTROL IN NAMO RIVER AND
KULAWI RIVER AREA KAB. SIGI

SHOP DRAWING

NAMO RIVER
DAFTAR GAMBAR PERENCANAAN
River Improvement and Sediment Control in Namo River

No. NAMA GAMBAR NO. GAMBAR NO. LEMBAR


I PETA SITUASI NAMO RIVER
1.1 NAMO RIVER - PETA SITUASI 1A 01/43
1.2 NAMO RIVER - PETA SITUASI REVETMENT WORK 1A 02/43
1.3 NAMO RIVER - PETA SITUASI CONSOLIDATION DAM I 1A 03/43
1.4 NAMO RIVER - PETA SITUASI SABO DAM I 1A 04/43
1.5 NAMO RIVER - PETA SITUASI SABO DAM II 1A 05/43
1.6 NAMO RIVER - PETA SITUASI SABO DAM III 1A 06/43

II LONG SECTION NAMO RIVER


2.1 NAMO RIVER - LONG SECTION 1B 07/43

III CROSS SECTION NAMO RIVER


3.1 NAMO RIVER - WORK EARTH ONLY CROSS SECTION NO.3 & NO.4 1C 08/43
3.2 NAMO RIVER - WORK EARTH ONLY CROSS SECTION NO.5 & NO.6 1C 09/43
3.3 NAMO RIVER - REVETMENT WORK CROSS SECTION NO.7 & NO.8 1C 10/43
3.4 NAMO RIVER - REVETMENT WORK CROSS SECTION NO.9 & NO.10 1C 11/43
3.5 NAMO RIVER - REVETMENT WORK CROSS SECTION NO.11 & NO.12 1C 12/43
3.6 NAMO RIVER - REVETMENT WORK CROSS SECTION NO.13 & NO.14 1C 13/43
3.7 NAMO RIVER - REVETMENT WORK CROSS SECTION NO.15 & NO.16 1C 14/43
3.8 NAMO RIVER - REVETMENT WORK CROSS SECTION NO.17 & NO.18 1C 15/43
3.9 NAMO RIVER - REVETMENT WORK CROSS SECTION NO.19 & NO.20 1C 16/43
3.10 NAMO RIVER - REVETMENT WORK CROSS SECTION NO.21 & NO.22 1C 17/43
3.11 NAMO RIVER - REVETMENT WORK CROSS SECTION NO.23 1C 18/43
DAFTAR GAMBAR PERENCANAAN
River Improvement and Sediment Control in Namo River

No. NAMA GAMBAR NO. GAMBAR NO. LEMBAR


IV CONSOLIDATION DAM I
4.1 NAMO RIVER - CONSOLIDATION DAM I DENAH 1D 19/43
4.2 NAMO RIVER - CONSOLIDATION DAM I POTONGAN A - A (MAIN DAM) 1D 20/43
4.3 NAMO RIVER - CONSOLIDATION DAM I POTONGAN B - B (SUB DAM) 1D 21/43
4.4 NAMO RIVER - CONSOLIDATION DAM I POTONGAN C - C 1D 22/43

V SABO DAM I
5.1 NAMO RIVER - SABO DAM I DENAH 1E 23/43
5.2 NAMO RIVER - SABO DAM I POTONGAN A - A (MAIN DAM) 1E 24/43
5.3 NAMO RIVER - SABO DAM I POTONGAN B - B (SUB DAM) 1E 25/43
5.4 NAMO RIVER - SABO DAM I POTONGAN C - C 1E 26/43

VI SABO DAM II
6.1 NAMO RIVER - SABO DAM II DENAH 1F 27/43
6.2 NAMO RIVER - SABO DAM II POTONGAN A - A (MAIN DAM) 1F 28/43
6.3 NAMO RIVER - SABO DAM II POTONGAN B - B (SUB DAM) 1F 29/43
6.4 NAMO RIVER - SABO DAM II POTONGAN C - C 1F 30/43

VII SABO DAM III


7.1 NAMO RIVER - SABO DAM III DENAH 1G 31/43
7.2 NAMO RIVER - SABO DAM III POTONGAN A - A (MAIN DAM) 1G 32/43
7.3 NAMO RIVER - SABO DAM III POTONGAN B - B (SUB DAM) 1G 33/43
7.4 NAMO RIVER - SABO DAM III POTONGAN C - C 1G 34/43
DAFTAR GAMBAR PERENCANAAN
River Improvement and Sediment Control in Namo River

No. NAMA GAMBAR NO. GAMBAR NO. LEMBAR


VIII DETAIL
8.1 NAMO RIVER - REVETMENT WORK & DETAIL INSPECTION ROAD 1H 35/43
8.2 NAMO RIVER - DETAIL TANGGA & KANSTIN 1H 36/43
8.3 NAMO RIVER - DETAIL PEMBESIAN 1H 37/43
8.4 NAMO RIVER - DETAIL PEMBESIAN 1H 38/43
8.5 NAMO RIVER - DETAIL PEMBESIAN 1H 39/43
8.6 NAMO RIVER - DETAIL PEMBESIAN 1H 40/43
8.7 NAMO RIVER - DETAIL PEMBESIAN 1H 41/43
8.8 NAMO RIVER - DETAIL PEMBESIAN 1H 42/43
8.9 NAMO RIVER - DETAIL PEMBESIAN 1H 43/43