Framework 3.0 The Ohio State University

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 43

Framework 3.

0
THE OHIO STATE UNIVERSITY

Board of Trustees | August 17, 2023

1
Introduction

2
What a Framework Plan is …
• A vision
• Capacity analysis
• A living document
• Data driven
• A guide

What a Framework Plan is not …

• Prescriptive
• List of projects
• Capital plan
• Set in stone
3• Episodic 3
Parallel Planning

Framework 3.0

4
Planning Drivers for Framework 3.0

Growing Columbus Region Innovation / Partnership Acceleration

North Knot Connection Changing Nature of Work And Learning

Bus Rapid Transit Connector Changing Nature of Discovery

Olentangy River Corridor Planning Resource Stewardship

Higher Education Landscape

5
Framework 3.0
Principles
The physical campus will ACADEMIC &
RESEARCH
enhance Ohio State’s EXCELLENCE

position as a leading
public university.

6
Final Plan

Near-term New Construction


Long-term New Construction
Near-term Renovation
7
Long-term Renovation
3.0 Plan Areas

1 Core North
1
2 River & Midwest
315

3 Carmenton
4 Health Sciences & 4
Wexner Medical Center
5 Core South
5
6 Wayfinding, Edges,
Gateways, & Placemaking
8
Core North

9
Connections

Key Roadway Connection


Key Pedestrian Connection

10
Highlighted Projects

Key Roadway Connection


Key Pedestrian Connection
New Construction
Renovation

11
Evans Lab Replacement

Vision

Residence Hall Renovations

Classroom & Teaching Lab Building


12
Hansford Quad // Before
13
Future Academic
Building
New Classroom and
Teaching Lab Building

Hansford Quad // After


14
River and Midwest

15
OSU Transit Stop

Connections

BRT

BRT

North Knot Realignment

Key Roadway Connection


Key Pedestrian Connection

16
Highlighted P

Projects

Key Roadway Connection


Key Pedestrian Connection
New Construction
Renovation

17
Vision

Improve Woody Hayes Corridor

New Teaching Lab Spaces

18 Activate Riverfront
Woody Hayes
Dedicated Bus Lane

Planted Buffer with Ohio State Branding


Bollards
Looking East

Bus
Shelter

Transit Center

Plantings for Increased


Stormwater Absorption

Utilities

19
CONCEPT
Carmenton

20
Connections

21
Connections

Key Roadway Connection


Key Pedestrian Connection

22
Phase 1 Development

Key Roadway Connection


Key Pedestrian Connection
Carmenton Phase 1

23
Phase 2 Development

Key Roadway Connection


Key Pedestrian Connection
Carmenton Phase 1
Carmenton Phase 2

24
Plaza and EAIC

Vision

Walking North, Greensward to the Plaza

Parkette Adjacent to Main Street

25
Future
Research/Partnership

• Carmenton Rendering here if provided.


Interdisciplinary Future
Research/Partnership
Future
Research/Partnership
Research Facility 2 Pelotonia Research Center

Center for Entrepreneurship and


Commercialization
Future
Research/Partnership
Energy Advancement
and Innovation Canter

Carmenton Phase 1 // After


26
Health Sciences and
Wexner Medical Center

27
Connections

Key Roadway Connection


Key Pedestrian Connection

28
Organizing
Principles

RESEARCH

CLINICAL *
ACADEMIC *

29
Highlighted
Projects

Key Roadway Connection


Key Pedestrian Connection
New Construction
Renovation

30
Vision Interdisciplinary Research

Clinical Facilities

Interprofessional Education,
Active Learning

31
Core South

32
Connections

Key Roadway Connection


Key Pedestrian Connection
Activated Forecourts

33
Highlighted
Projects

Key Roadway Connection


Key Pedestrian Connection
Activated Forecourts
New Construction
Renovation

34
Vision

Reimagine Ohio Union Lawn

Improve Housing Quality

Key Pedestrian Connection


New Construction
Renovation
New Recreation Center

35
Wayfinding, Edges,
Gateways, &
Placemaking

36
Connections

315

37
Vision
Photo Opportunities

Before

315

Signage and Branding

38 Venues for Wellness


Neil Avenue // Before
39
Neil Avenue // After
40
Recommendations

41
Community
• Increase equity of student experience through modernization of instructional space Practice
and on-campus housing.
• Provide updated, flexible spaces that support teaching and research excellence. • Adopt uniform scheduling
• Reflect the diversity of the university's people, places and programs on campus. software to maximize
utilization of classrooms and
Experience workspace.

• Implement/enhance wayfinding from highway to hallway. • Implement a space


• Enhance arrivals by leveraging campus branding opportunities at edges and gateways. governance structure for the
• Explore partnerships to supplement campus amenities for faculty, staff, and the campus university.
community.
• Track research metrics to
Stewardship improve laboratory space
allocation.
• Increase net assignable research space. Decrease net assignable office space.
• Address deferred maintenance and renewal with each project. • Establish and maintain Facility
• Achieve alignment between physical and strategic plans. Master Plans for all colleges
and units.
Connectivity • Formalize funding model for
• Develop activated public spaces that are functional, cohesive and beautiful. projects that enhance shared
• Adopt Complete Street concepts in roadway design. university spaces.
• Engage the river to enhance connectivity and user experience.

42
Thank you

Near-term New Construction


Long-term New Construction
Near-term Renovation
43
Long-term Renovation

You might also like