Question 2
Question 3
Question 4
Should work commence without pre application checks taking place and verified?
Answer: No never
Not without client approval
Yes it is acceptable
only if the coatings are old
Question 5
Will the insulation inspector be involved, when required, to inspect the coating application?
https://insulationinspector.com/assess/TII/8.1/ Page 1 of 2
insulationinspector.com : Training for the Coatings and Corrosion Control Industry 26/09/2019, 12)51
Question 6
What document will advise on the level and qualification of the inspector?
Question 7
What should be used to ensure the insulation installation does not commence until all the
Question 8
Should the insulation inspector check the batch numbers of the insulation material?
Question 9
What are both the sealant material and method of sealing critical in preventing?
Question 10
Answer: No never
Yes it is possible (providing it is still usable)
Only on offshore projects