Timing and Data Capture

D01277836 - WPCE (Single Wireline Valve / Shear


Seal) Post Job Maintenance
Release Title C

entryid 31096

workorderid 322913713

Number of Operators 1

Start Time November 8, 2021 at 4:52 AM MST

End Time November 8, 2021 at 5:13 AM MST

Duration 1267

Time Active 1267

Started by Issa Ahmed Reda (#751) @ November 8, 2021 at 4:52 AM MST

Step 1: Select the WPCE Certification for: Shear Seal

Step 1: (M3) Notification: 31454511

Step 1: Equipment #: 12183181

Step 1: Work Order Number: 322913713

Step 1: OEM: 1

Step 1: OEM Equipment # AEFE12H055

Step 1: WP (PSI): 10000

Step 1: Enter the Top Connection: 8 3/8

Step 1: Enter the Bottom Connection: 8 3/8

Time to complete step 1 86

Step 2: Ensure to Review JSA with Supervisor. Pass/Ok

Step 2: 1. Upload the image (If necessary)


Step 2: Prior to commencing any WPCE maintenance Pass/Ok
ensure the equipment is steady and secure.

Step 2: 2. Upload the image (If necessary)

Step 2: Ensure to Clean all exterior components and Pass/Ok


equalizing manifold with a non-abrasive method, e.g.
pressure washer, parts cleaner.

Step 2: 3. Upload the image (If necessary)

Time to complete step 2 15

Step 3: Ensure to Remove button head cap screw. Not Applicable

Step 3: 4. Upload the image (If necessary)

Step 3: Ensure to Remove equalizing valve stem, Not Applicable


inspect elastomers, clean, lubricate. Ensure
elastomers are in good condition and fit for purpose.

Step 3: 5. Upload the image (If necessary)

Step 3: Ensure to Clean and flush the inside of the Not Applicable
valve stem body. Check for damage, flow cutting, or
wear. Replace if necessary.

Step 3: 6. Upload the image (If necessary)

Step 3: Ensure to Clean all surfaces of the valve Not Applicable


stem. Check for damage, flow cutting, or wear.
Replace if necessary.

Step 3: 7. Upload the image (If necessary)

Step 3: Ensure to Apply a light coat of lubricate (as Pass/Ok


per OEM procedures) to the seal surface of the valve
stem; install the O-ring and poly seal.

Step 3: 8. Upload the image (If necessary)

Step 3: Ensure to Apply thread lubricant (as per OEM Pass/Ok


procedures) to the valve stem threads and install.

Step 3: 9. Upload the image (If necessary)

Time to complete step 3 940


Time to complete step 4 3

Step 5: Ensure to Conduct visual inspection, including Pass/Ok


Quick Union, flanged grooves. No rust, pitting,
corrosion or cracks allowed. Repair or replace as
necessary.

Step 5: 10. Upload the image (If necessary)

Step 5: Ensure to Disassemble as per appropriate Pass/Ok


and correct revision of OEM’s Maintenance
procedure.

Step 5: 11. Upload the image (If necessary)

Step 5: Ensure to Clean and flush Wireline Valve Pass/Ok


assembly interior body, Guides and Rams. Check for
burrs, sharp edges, wire marks and wear marking.
Repair as necessary.

Step 5: 12. Upload the image (If necessary)

Step 5: When dis-assembling components, ensure all Pass/Ok


metal components that are removed remain together.

Step 5: 13. Upload the image (If necessary)

Step 5: Ensure to Inspect horse shoe seals and inner Pass/Ok


seals for damage & wear. Perform visual inspection of
all seal areas. Repair if necessary. If wear is
excessive create non job CPI and document findings.

Step 5: 14. Upload the image (If necessary)

Step 5: Ensure to Remove O-Rings, Clean and Pass/Ok


inspect O-ring grooves.

Step 5: 15. Upload the image (If necessary)

Time to complete step 5 83

Step 6: Ensure to Burrs and raised protrusions shall Pass/Ok


be repaired or removed prior to assembly using a
soft, non-metallic buffing wheel or fine emery cloth.

Step 6: 16. Upload the image (If necessary)

Step 6: Ensure to Lubricate and install new O-rings. Pass/Ok


Step 6: 17. Upload the image (If necessary)

Step 6: Ensure any debris is removed from Pass/Ok


components prior to assembly.

Step 6: 18. Upload the image (If necessary)

Step 6: Maintenance Coordinator to physically check Pass/Ok


and verify inner body components are fit for purpose.

Step 6: 19. Upload the image (If necessary)

Step 6: Ensure all redress kits and consumables used Not Applicable
during the Post Job Maintenance procedure are
documented in the '''Appendix attached'''. The part
number, quantity, & batch number of the elastomers
used must be recorded in attached file.

Step 6: 20. Upload the image (If necessary)

Step 6: Ensure to upload the document "Appendix- 0


D01277836" once after recording Appendix 1 and
Appendix 2 in the Step 6.

Step 6: Ensure to Replace components as required. Not Applicable


Record changes in assigned work order.

Step 6: Image Input

Time to complete step 6 42

Step 7: If equipment fails visual inspection or required Pass/Ok


spare parts are not available, mark as Hold on
checklist and red tag tool noting parts required.
Continue with procedure when parts become
available. Create M2 notification and document
maintenance order No

Step 7: 21. Upload the image (If necessary)

Step 7: Ensure to Apply a light coat of lubricant to all Pass/Ok


surfaces.

Step 7: 22. Upload the image (If necessary)

Step 7: Ensure to Reassemble as per appropriate and Pass/Ok


correct revision of OEM’s Maintenance procedure.
Step 7: 23. Upload the image (If necessary)

Step 7: Ensure to Reassemble and Update appendix Pass/Ok


with WLV block diagram.

Step 7: 24. Upload the image (If necessary)

Step 7: Upload the recorded document "Appendix-


D01277836" after recording both Appendix 1 and
Appendix 2.

Step 7: Ensure proper make-up during re-assembly. Pass/Ok

Step 7: 25. Upload the image (If necessary)

Time to complete step 7 37

Step 8: Ensure to perform pressure test after re- 1


assembly.

Step 8: Perform pressure test after re-assembly using Pass/Ok


WM-GL-HAL-WPS-1705a.

Step 8: 26. Upload the image (If necessary)

Time to complete step 8 9

Step 9: Ensure to Make up the wireline valve to a Pass/Ok


certified test stump and connect all manifolds and
hoses.

Step 9: 27. Upload the image (If necessary)

Step 9: Function test the Rams, fully closed/ fully Pass/Ok


open. Document full ram closure time.

Step 9: 28. Upload the image (If necessary)

Step 9: Record full ram closure time:_____ Seconds 28

Time to complete step 9 26

Step 10: Ensure to Paint WPCE as per WM-GL-HAL- 1


WPS-1705.

Step 10: Ensure to Band WPCE as per WM-GL-HAL- 0


WPS-1705.
Step 10: Ensure to green tag the tool and move to 1
appropriate location.

Step 10: Notes & Comments (If any)

Time to complete step 10 22

Step 11: Ensure to Upload attachments if any: 0

Step 11: 1. Upload attachment if any:

Step 11: 2. Upload attachment if any:

Time to complete step 11 4