Mini Project Proposal
Mini Project Proposal
July, 2023
Jajura, Ethiopia
Wachemo University
College Of Medicine and Health Sciences
Intervention on Latrine Facility, Hypertension Screening campaign,
At Jajura Town, Hadiya Zone, Ethiopia, July, 2023
Advisors: Taddese (BSc, MSc)
Lonseko (BSc, MPH, PHD candidate)
Markos (BSc, MPH)
Wcu Graduating Medicine and Health Science Student Jajura TTP
Site
PREPARED BY JAJURA TEAM MEMBERS
NO NAME ID. No DEPARTMENT
1 Dr.DESTA ALEMU MEDICINE
2 Dr.DEMIREW DABARO MEDICINE
3 Dr.TESFAHUN BEKELE MEDICINE
4 Dr.TEKALIGN YEHUALAWORK MEDICINE
5 Dr.FIKIREAB TESFAYE MEDICINE
6 ELISABETH SIMION PHO
7 FIRAOL GUDETA PHO
8 ABRAHAM DINSA PHO
9 BETALIHEM NIGUSSIE M/LABORATORY
10 BURUK ANMAW M/LABORATORY
11 ELALEDIN KEDIR M/LABORATORY
12 MINTASINOT THOMAS M/LABORATORY
13 DERARA TAYE S/ NURSING
14 FIROMSA MOSISA S/ NURSING
15 EDEN TIKABO P/NURSING
16 EYERUSALEM GETACHEW P NURSING
17 KASECH TERBINOS ANESTHESIA
18 HENAN ZERIHUN ANESTHESIA
19 ALIFA TAJU MEDIWIFERS
20 HASSEN MOHAMMED C/NURSING
21 MUAZ MOHAMMED C/NURSING
22 OBSA SHAZALI C/NURSING
23 AMANUEL SEWAYEHU C/NURSING
Acknowledgement
We would like to thank Wachemo University College of Medicine and Health
Science for arranging this practical field training program and giving us the
opportunity to go through identification of the actual community problems and
take part in problem solving activities in a concerted way. Our deepest gratitude is
to our advisor Mr.Markos and Mr. Taddese and Mr. Lonseko devoted his time to
guide and help us by giving constructive suggestion and facilitating necessary
materials .Our special thanks also go to the administrative bodies in Jajura town
and Jajura health center for their cooperation and willingness to provide us
valuable information. Most importantly our thanks go to the respondents in the
study area for their voluntary participation in this study.
Contents of project
Acknowledgement.......................................................................................................................................4
Contents of project......................................................................................................................................5
List of Tables and Figures...........................................................................................................................6
Acronym and Abbreviation.........................................................................................................................7
1. SUMARRY.........................................................................................................................................8
2. Rationale of the project........................................................................................................................9
3. Objectives of the project......................................................................................................................9
4. Strategies of the project.......................................................................................................................9
5. Beneficiaries........................................................................................................................................9
6. Stakeholder analysis and Engagement.................................................................................................9
7. Budget summery................................................................................................................................11
8. Project timeline..................................................................................................................................11
9. Mini project action plan.....................................................................................................................13
10. RESULT..............................................................................................................................................14
10.1 Public Latrine................................................................................................................................14
10.2. Hypertension Screening Result.....................................................................................................16
References.................................................................................................................................................17
List of Tables and Figures
Table 1: Stakeholder analysis and engagement on Jajura team mini project Jajura, Hadiya, SNNPR,
Ethiopia, July 2023....................................................................................................................................10
Table 2: Budget plan of Jajura team mini project Jajura, Hadiya, SNNPR, Ethiopia, July 2023...............11
Table 3: Project timeline of Jajura team mini project Jajura, Hadiya, SNNPR, Ethiopia, July 2023.........11
Table 4: Action plan of Jajura team mini project Jajura, Hadiya, SNNPR, Ethiopia, July 2023................13
Figure 1: Jajura community public latrine before preparing Jajura town, Hadiya, SNNPR, Ethiopia,
August, 2023.............................................................................................................................................14
Figure 2: Jajura community public latrine during preparation by WCU TTP team Jajura town, Hadiya,
SNNPR, Ethiopia, August, 2023...............................................................................................................15
Figure 3: Jajura community public latrine after preparation by WCU TTP team Jajura town, Hadiya,
SNNPR, Ethiopia, August, 2023...............................................................................................................16
Figure 4: Hypertension screening on Jajura persons by WCU TTP team Jajura town, Hadiya, SNNPR,
Ethiopia, August, 2023..............................................................................................................................16
Table 5: Hypertension screening result of 205 persons by WCU TTP team Jajura town, Hadiya, SNNPR,
Ethiopia, August, 2023..............................................................................................................................17
Acronym and Abbreviation
ANC –Antenatal care
ETB-Ethiopian birr
FP-Family planning
HC-Health center
HH-Households
HTN-Hypertension
WCU-Wachemo University
Table 1: Stakeholder analysis and engagement on Jajura team mini project Jajura, Hadiya,
SNNPR, Ethiopia, July 2023
Stakeholders Role in project Interest in the project Means of Level of
communication importance
Jajura health Facilitation of proper utilization of Direct communication Very high
center and project and community latrine facility, and permission from
health admin technical support make the people to develop HC,health admin
good attitude for HTN
office by their office leader and Jajura
screening
permission. town municipality
admin office
Jajura town Facilitation of To see the well prepared Face to face discussion Very high
community project, capacity latrine and to get advice with individual
building material about HTN community of Jajura
and technical town community and
support by their by announcing about
active the programmed work.
participation and
sharing ideas
Our team Active To create better attitude Through face to face Very high
members participation in and awareness in Jajura discussion
preparing public town community about
latrine, HTN proper latrine usage, HTN
screening screening
Motivating other
members of the
community.
7. Budget summery
Table 2: Budget plan of Jajura team mini project Jajura, Hadiya, SNNPR, Ethiopia, July 2023
Number Items Amount 1piece Total cost(ETB)
1 Metal sheets 20 piece 800 16,000
2 Nails 2 kg 220 440
3 Woods - - 2000
4 Axes 2 piece 120 240
5 Labor force 3person(2days) 150 900
6 Poster 2 400 800
7 Paints 2 100 200
5 BP cuff 2 2000 4000
6 Mask 1pack 80 80
7 Stethoscope - - -
8 Paper 20pieces 3 60 birr
9 Pen 12 pieces 25 300
Total - - 25,020 Birr
8. Project timeline
Table 3: Project timeline of Jajura team mini project Jajura, Hadiya, SNNPR, Ethiopia, July 2023
s.no Year 2023
Responsibl Support July July July/
Activity e body august
20- 22- 26/7-
22/2023 25/202 08/08
3 /2023
I Preparation
Proposal development Group Instructo
members r
Fund raising Group -
Creating awareness members
Material collection Health -
admin
office and
Jajura town
municipalit
y admin
office
II Implementation
Hypertension screening Team Eshaday
members private
clinic
and HC
10. RESULT
10.1 Public Latrine
Before preparing latrine
A B
Figure 1: Jajura community public latrine before preparing Jajura town, Hadiya, SNNPR,
Ethiopia, August, 2023
During preparing latrine
A B C
D E F
Figure 2: Jajura community public latrine during preparation by WCU TTP team Jajura town,
Hadiya, SNNPR, Ethiopia, August, 2
023
After preparing latrine
A B C
Figure 3: Jajura community public latrine after preparation by WCU TTP team Jajura town,
Hadiya, SNNPR, Ethiopia, August, 2023
Table 5: Hypertension screening result of 205 persons by WCU TTP team Jajura town, Hadiya,
SNNPR, Ethiopia, August, 2023
No Plan(persons) Achievement Normal Elevated 1st stage 2nd stage
No %
1 150 205 100 170 28 6 1
References
1. Asemu MM, Yalew AW, Kabeta ND, Mekonnen D (2021) Prevalence and risk factors of
hypertension among adults: A community based study in Addis Ababa, Ethiopia.
2. Assessment, Prioritization And Intervention Of Health And Health Related Problems In
Jajura Health Center Catchment Area, Hadiya, SNNPR, Ethiopia, 2023
3. Gebremedhin et al. BMC Res Notes (2018) 11:586https://doi.org/10.1186/s13104-018-
3683-0