Mini Project Title
Intervention on public Latrine Facility, Hypertension Screening
campaign, At Jajura Town, Hadiya Zone, Ethiopia, July, 2023
Wcu Graduating Medicine and Health Science Student Jajura TTP
Site
Advisors: Taddese
Lonseko
Markos

July, 2023

Jajura, Ethiopia
Wachemo University
College Of Medicine and Health Sciences
Intervention on Latrine Facility, Hypertension Screening campaign,
At Jajura Town, Hadiya Zone, Ethiopia, July, 2023
Advisors: Taddese (BSc, MSc)
Lonseko (BSc, MPH, PHD candidate)
Markos (BSc, MPH)
Wcu Graduating Medicine and Health Science Student Jajura TTP
Site
PREPARED BY JAJURA TEAM MEMBERS
NO NAME ID. No DEPARTMENT
1 Dr.DESTA ALEMU MEDICINE
2 Dr.DEMIREW DABARO MEDICINE
3 Dr.TESFAHUN BEKELE MEDICINE
4 Dr.TEKALIGN YEHUALAWORK MEDICINE
5 Dr.FIKIREAB TESFAYE MEDICINE
6 ELISABETH SIMION PHO
7 FIRAOL GUDETA PHO
8 ABRAHAM DINSA PHO
9 BETALIHEM NIGUSSIE M/LABORATORY
10 BURUK ANMAW M/LABORATORY
11 ELALEDIN KEDIR M/LABORATORY
12 MINTASINOT THOMAS M/LABORATORY
13 DERARA TAYE S/ NURSING
14 FIROMSA MOSISA S/ NURSING
15 EDEN TIKABO P/NURSING
16 EYERUSALEM GETACHEW P NURSING
17 KASECH TERBINOS ANESTHESIA
18 HENAN ZERIHUN ANESTHESIA
19 ALIFA TAJU MEDIWIFERS
20 HASSEN MOHAMMED C/NURSING
21 MUAZ MOHAMMED C/NURSING
22 OBSA SHAZALI C/NURSING
23 AMANUEL SEWAYEHU C/NURSING
Acknowledgement
We would like to thank Wachemo University College of Medicine and Health
Science for arranging this practical field training program and giving us the
opportunity to go through identification of the actual community problems and
take part in problem solving activities in a concerted way. Our deepest gratitude is
to our advisor Mr.Markos and Mr. Taddese and Mr. Lonseko devoted his time to
guide and help us by giving constructive suggestion and facilitating necessary
materials .Our special thanks also go to the administrative bodies in Jajura town
and Jajura health center for their cooperation and willingness to provide us
valuable information. Most importantly our thanks go to the respondents in the
study area for their voluntary participation in this study.
Contents of project
Acknowledgement.......................................................................................................................................4
Contents of project......................................................................................................................................5
List of Tables and Figures...........................................................................................................................6
Acronym and Abbreviation.........................................................................................................................7
1. SUMARRY.........................................................................................................................................8
2. Rationale of the project........................................................................................................................9
3. Objectives of the project......................................................................................................................9
4. Strategies of the project.......................................................................................................................9
5. Beneficiaries........................................................................................................................................9
6. Stakeholder analysis and Engagement.................................................................................................9
7. Budget summery................................................................................................................................11
8. Project timeline..................................................................................................................................11
9. Mini project action plan.....................................................................................................................13
10. RESULT..............................................................................................................................................14
10.1 Public Latrine................................................................................................................................14
10.2. Hypertension Screening Result.....................................................................................................16
References.................................................................................................................................................17
List of Tables and Figures
Table 1: Stakeholder analysis and engagement on Jajura team mini project Jajura, Hadiya, SNNPR,
Ethiopia, July 2023....................................................................................................................................10
Table 2: Budget plan of Jajura team mini project Jajura, Hadiya, SNNPR, Ethiopia, July 2023...............11
Table 3: Project timeline of Jajura team mini project Jajura, Hadiya, SNNPR, Ethiopia, July 2023.........11
Table 4: Action plan of Jajura team mini project Jajura, Hadiya, SNNPR, Ethiopia, July 2023................13
Figure 1: Jajura community public latrine before preparing Jajura town, Hadiya, SNNPR, Ethiopia,
August, 2023.............................................................................................................................................14
Figure 2: Jajura community public latrine during preparation by WCU TTP team Jajura town, Hadiya,
SNNPR, Ethiopia, August, 2023...............................................................................................................15
Figure 3: Jajura community public latrine after preparation by WCU TTP team Jajura town, Hadiya,
SNNPR, Ethiopia, August, 2023...............................................................................................................16
Figure 4: Hypertension screening on Jajura persons by WCU TTP team Jajura town, Hadiya, SNNPR,
Ethiopia, August, 2023..............................................................................................................................16
Table 5: Hypertension screening result of 205 persons by WCU TTP team Jajura town, Hadiya, SNNPR,
Ethiopia, August, 2023..............................................................................................................................17
Acronym and Abbreviation
ANC –Antenatal care

EPHI - Ethiopian Public Health Institute

ETB-Ethiopian birr

FP-Family planning

HC-Health center

HH-Households

HTN-Hypertension

SNNPR-Southern nation nationalities and peoples representative

WCU-Wachemo University

TTP-team training program


1. SUMARRY
• Project Title:
Preparing community latrine facility
Hypertension screening campaign
Project Area: At Jajura town
Project Duration: July 20- august 08, 2023
Project implementing body: WCU, Graduating Medicine and Health Science students in
collaboration jajura town health administrative office.
Project Budget: 25,020ETB Source Group members, Health admin office, community and
JajuraTown municipality office
Introduction
Background
In Ethiopia, non-communicable diseases such as hypertension and diabetes mellitus have begun
to emerge as the leading causes of hospital admissions, morbidity, and mortality in Health
facilities located around the nation. A 2016 report by the Ethiopian Public Health Institute
(EPHI) found that 95% of Ethiopian adult populations have 1 to 2 risk factors for Non-
communicable diseases. But there was little information on the extent and risk factors for
hypertension at the community level in Ethiopia, including the Addis Ababa [1]. Also as we
were seen there is a gap in jajura town on screening hypertensive patients. Thus, this study aimed
to identify the prevalence of hypertension among adults in jajura town.
About 39% of the world population does not have access to improved sanitation and open
defecation is largely a rural phenomenon, most widely practiced in Southern Asian and Sub-
Saharan Africa. Sub-Saharan countries, including Ethiopia are considered to be the home 81% of
open defecation. Even though Ethiopia has achieved greater progress in reduction of open
defecation from 93 to 45% at national level and from 100 to 53% in rural areas, there is poor
latrine utilization among individual and families in some communities and 38.1 million people
still practice open defecation [3]
According to our means we were planned to construct 1 public latrine and achieved 2 public
latrines to decrease open defecation in communities.
2. Rationale of the project
Creating awareness on: -
Public latrine facility
HTN screening
3. Objectives of the project
General objectives
Intervention on public Latrine Facility, Hypertension Screening, Jajura Town, Hadiya
Zone, Ethiopia, July, 2023
Specific objectives
To prepare public latrine
To screen hypertension
4. Strategies of the project
By cooperative and collaborative team member participation
By initiating the community about the issues
By discussing with all concerned bodies like HC leader, Jajura town health admin office and
Jajura town municipality admin office
5. Beneficiaries
 Direct: This project benefits all members of Jajura HC community catchment areas.
 Indirect: All peoples that were live in Jajura town and surrounds
6. Stakeholders analysis and Engagement
Wcu Graduating Medicine and Health Science Student Jajura TTP Site
HC workers
Jajura town health admin office
Jajura town community
Jajura town municipality administrative office
Our supervisor

Table 1: Stakeholder analysis and engagement on Jajura team mini project Jajura, Hadiya,
SNNPR, Ethiopia, July 2023
Stakeholders Role in project Interest in the project Means of Level of
communication importance
Jajura health Facilitation of proper utilization of Direct communication Very high
center and project and community latrine facility, and permission from
health admin technical support make the people to develop HC,health admin
good attitude for HTN
office by their office leader and Jajura
screening
permission. town municipality
admin office

Jajura town Facilitation of To see the well prepared Face to face discussion Very high
community project, capacity latrine and to get advice with individual
building material about HTN community of Jajura
and technical town community and
support by their by announcing about
active the programmed work.
participation and
sharing ideas
Our team Active To create better attitude Through face to face Very high
members participation in and awareness in Jajura discussion
preparing public town community about
latrine, HTN proper latrine usage, HTN
screening screening
Motivating other
members of the
community.

7. Budget summery
Table 2: Budget plan of Jajura team mini project Jajura, Hadiya, SNNPR, Ethiopia, July 2023
Number Items Amount 1piece Total cost(ETB)
1 Metal sheets 20 piece 800 16,000
2 Nails 2 kg 220 440
3 Woods - - 2000
4 Axes 2 piece 120 240
5 Labor force 3person(2days) 150 900
6 Poster 2 400 800
7 Paints 2 100 200
5 BP cuff 2 2000 4000
6 Mask 1pack 80 80
7 Stethoscope - - -
8 Paper 20pieces 3 60 birr
9 Pen 12 pieces 25 300
Total - - 25,020 Birr
8. Project timeline
Table 3: Project timeline of Jajura team mini project Jajura, Hadiya, SNNPR, Ethiopia, July 2023
s.no Year 2023
Responsibl Support July July July/
Activity e body august
20- 22- 26/7-
22/2023 25/202 08/08
3 /2023
I Preparation
Proposal development Group Instructo
members r
Fund raising Group -
Creating awareness members
Material collection Health -
admin
office and
Jajura town
municipalit
y admin
office
II Implementation
Hypertension screening Team Eshaday
members private
clinic
and HC

Site selection for Team Health


community latrine members , admin
Health office
admin
office
Digging and preparing Team Jajura
community latrine members town
and Jajura health
town health admin
admin office ,
office

III Monitoring and


evaluation
Monitoring activities Group
members
and health
center
community
Evaluating the process Health
center
directors
and health
admin
office

9. Mini project action plan


Table 4: Action plan of Jajura team mini project Jajura, Hadiya, SNNPR, Ethiopia, July 2023
S. no Activity Baseline Last 2 week total
Plan Achv,t % Achv,t %
1 Hypertension Screening 150 205 136. 205
screening peoples for 7
Digging hypertensio
n
2 Preparing Adding 1 1 2 100
public latrine public
facility latrine to
before built
latrine

10. RESULT
10.1 Public Latrine
Before preparing latrine

A B

Figure 1: Jajura community public latrine before preparing Jajura town, Hadiya, SNNPR,
Ethiopia, August, 2023
During preparing latrine

A B C
D E F

Figure 2: Jajura community public latrine during preparation by WCU TTP team Jajura town,
Hadiya, SNNPR, Ethiopia, August, 2
023
After preparing latrine

A B C

Figure 3: Jajura community public latrine after preparation by WCU TTP team Jajura town,
Hadiya, SNNPR, Ethiopia, August, 2023

10.2. Hypertension Screening Result


On our hypertension screening campaign we were planned to screen 150 persons for
hypertension but we were screened more than 200 persons from those we were screened for
HTN more than half of them were free from hypertension generally we were educated more 200
peoples about hypertension and how they prevent themselves from hypertension in addition to
this specifically advice had been given for 28 elevated BP peoples, we were advised 7 persons to
visit HC. Also we advised the 2nd stage known hypertensive persons to start medication.
Generally we got the following findings from the campaigns.

Some photos during screening


Figure 4: Hypertension screening on Jajura persons by WCU TTP team Jajura town, Hadiya,
SNNPR, Ethiopia, August, 2023

Table 5: Hypertension screening result of 205 persons by WCU TTP team Jajura town, Hadiya,
SNNPR, Ethiopia, August, 2023
No Plan(persons) Achievement Normal Elevated 1st stage 2nd stage
No %
1 150 205 100 170 28 6 1

References
1. Asemu MM, Yalew AW, Kabeta ND, Mekonnen D (2021) Prevalence and risk factors of
hypertension among adults: A community based study in Addis Ababa, Ethiopia.
2. Assessment, Prioritization And Intervention Of Health And Health Related Problems In
Jajura Health Center Catchment Area, Hadiya, SNNPR, Ethiopia, 2023
3. Gebremedhin et al. BMC Res Notes (2018) 11:586https://doi.org/10.1186/s13104-018-
3683-0

You might also like