Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

ANNEX 5 Planning Worksheet

SCHOOL IMPROVEMENT PLANNING


PLANNING WORKSHEET

TIME FRAME
PRIORITY
IMPROVEMEN GENERAL OBJECTIVE/S ROOT CAUSE/S SY SY SY
T AREAS 2016- 2017- 2018-
2017 2018 2019
To increase the number of Increase of 15 15
10%
classrooms enrollment % %
The standard
classroom is □ □ □
60% which is
lower than □ □ □
100%.
□ □ □

□ □ □
To reduce the percentage of 10 10
Family Problem 9%
dropout % %
The dropout Lack of interest □ □ □
rate of grade 7-
10 is 29% Child Labor □ □ □
which is higher
than 0%
□ □ □

□ □ □
To increase the NAT performance to Distraction of modern
8% 8% 9%
75% technology
The teacher uses
NAT teaching materials not
Performance of □ □ □
in the performance
the school in 5 standard
learning areas
is 50.14 lower □ □ □
than 75%
□ □ □

□ □ □
To reduce the percentage of Distance of school
□ □ □
absences to 0% from home
The Percentage Child Labor □ □ □
of absences is
19.24% which Health and
□ □ □
is higher than Nutrition
0% Financial Matters □ □ □

□ □ □

Instruction: For each priority improvement area, write the general objectives and root causes using the root cause
diagram as reference. Afterwards, identify the year when the root cause will be addressed.
ANNEX 5 Planning Worksheet

PRIORITY TIME FRAME


IMPROVEME GENERAL OBJECTIVE/S ROOT CAUSE/S SY SY SY
NT AREAS 2016- 2017- 2018-
2017 2018 2019
To reduce the percentage of The parents have 1 .71
1%
The malnourish to 0% no stable income % %
percentage
□ □ □
of
malnourish
□ □ □
is 2.71
which is
□ □ □
higher than
0%
□ □ □
To increase the number of Increase of 10 9.11
The 8% % %
armchairs to 100% enrollment
percentage
of armchairs □ □
is 72.89%
which is □ □ □
insufficient
to the total □ □ □
number of
students □ □ □

SCHOOL IMPROVEMENT PLANNING


PLANNING WORKSHEET

Instruction: For each priority improvement area, write the general objectives and root causes using the root cause
diagram as reference. Afterwards, identify the year when the root cause will be addressed.

TIME FRAME
PRIORITY
MPROVEMEN GENERAL OBJECTIVE/S ROOT CAUSE/S SY SY SY
T AREAS 2016- 2017- 2018-
2017 2018 2019
To acquire equipment for ABM, GAS,
50 25
Hairdressing and Horticulture to the New opening of SHS 25% %
No available %
division office
equipment
intended for □ □ □
ABM, GAS,
Hairdressing □ □ □
and □ □ □
Horticulture
□ □ □

No available 100
To acquire armchairs for the 6CL New opening of SHS □ □
armchairs for %
the 6CL □ □ □
ANNEX 5 Planning Worksheet

TIME FRAME
PRIORITY
MPROVEMEN GENERAL OBJECTIVE/S ROOT CAUSE/S SY SY SY
T AREAS 2016- 2017- 2018-
2017 2018 2019
□ □ □

□ □ □

□ □ □

□ □ □

□ □ □

□ □ □

□ □ □

□ □ □

You might also like