Manufacturing
details C Shift
Date Time 11:15 11:30 11:45 12:00 12:15 12:30 12:45 1:00 1:15 1:30 1:45 2:00 2:15 2:30
1 16th June 12:39 AM
2 29th May 5:04 AM
3 5th June 3:04 AM
4 17th June 5:19 AM

Pallet movement stuck due to cylinder movement issue while going up, at Station A
Problem happened intermittently (3 times) between this duration.( 5th June - 3 times & 17th
Each time it was fixed by maintainance person.
C Shift
2:45 3:00 3:15 3:30 3:45 4:00 4:15 4:30 4:45 5:00 5:15 5:30 5:45 6:00 6:15

Break Time

up, at Station A
5th June - 3 times & 17th Jun - 1 time)
Manufacturing details Shift A Shift B
Produced 556 510
29th May Reject 0 3
Insulation damage -1 (Stn D2)
Defect - Retainer come out -2 (Stn F1)
Produced 510 511
5th June Reject 1 1
Defect Wire insulation damage -1 (E-1) Thermistor sctatch - 1 (Stn E-2)
Produced 260 592
16th June Reject 1 2
Connector damage -1 (Stn F-1)
Defect Wire insulation damage -1 (E-1) Molding on collar -1 (Stn D-2)
Produced 590 592
Reject 2 0
17th June
Silver on Case -1 (Stn D1)
Defect --
Sebmerge Ter bend -1 (Stn F-1)
Total produce 1916 2205
Rej Qty 4 6
Rej % 0.21 0.27
Shift C
450
1
Case damage -1 (Stn F)

455
0
--
480
0
--

464
0

--

1849
1
0.05
Manufacturing details Shift A Shift B
Produced 556 510
1st June Reject 0 3
Insulation damage -1 (Stn D2)
Defect - Retainer come out -2 (Stn F1)
Produced
2nd June Reject
Defect
Produced
16th June Reject
Defect
Produced
17th June Reject
Defect
Produced
18th June Reject
Defect
Produced
19th June Reject
Defect
Produced
20th June Reject
Defect
Produced
21st June Reject
Defect
Produced
22nd June Reject
Defect
Produced
23rd June Reject
Defect
Produced
24th June Reject
Defect
Produced
25th June Reject
Defect
Produced
26th June Reject
Defect
Produced
27th June Reject
Defect
Produced
28th June Reject
28th June
Defect
Produced
29th June Reject
Defect
Produced
30th June Reject
Defect
Produced
31st June Reject
Defect
Produced
32nd June Reject
Defect
Produced
33rd June Reject
Defect
Produced
34th June Reject
Defect
Produced
35th June Reject
Defect
Produced
36th June Reject
Defect
Produced
37th June Reject
Defect
Produced
38th June Reject
Defect
Produced
39th June Reject
Defect
Shift C
450
1
Case damage -1 (Stn F)