This document contains a breakdown of labor costs for various construction divisions for a building project. It lists 14 construction divisions including site works, masonry works, metal works, roofing, cabinets and closets, finishing works, and electrical works. The finishing works division alone contains over 30 line items. The total labor cost for the entire project according to the breakdown is 404,400.00 Philippine Pesos.
This document contains a breakdown of labor costs for various construction divisions for a building project. It lists 14 construction divisions including site works, masonry works, metal works, roofing, cabinets and closets, finishing works, and electrical works. The finishing works division alone contains over 30 line items. The total labor cost for the entire project according to the breakdown is 404,400.00 Philippine Pesos.
This document contains a breakdown of labor costs for various construction divisions for a building project. It lists 14 construction divisions including site works, masonry works, metal works, roofing, cabinets and closets, finishing works, and electrical works. The finishing works division alone contains over 30 line items. The total labor cost for the entire project according to the breakdown is 404,400.00 Philippine Pesos.
This document contains a breakdown of labor costs for various construction divisions for a building project. It lists 14 construction divisions including site works, masonry works, metal works, roofing, cabinets and closets, finishing works, and electrical works. The finishing works division alone contains over 30 line items. The total labor cost for the entire project according to the breakdown is 404,400.00 Philippine Pesos.
EXCAVATION 2,026.00 EMBANKMENT / BACKFILLING / COMPACTION 3,795.00 INSTALLATION OF SOIL TREATMENT 5,000.00 SITE CLEARING 5,000.00 DIV.2 MASONRY WORKS INSTALLATION OF DOUBLE-SIDED PARTITION WALL ON METAL STUDS- 4.5 MM THK HARDIFLEX BOARD 11,019.00 DIV.3 METAL WORKS/FASCIA BOARD INSTALLATION OF STEEL ROOF FRAMING COMPLETE WITH ACCESORIES 25,162.00 INSTALLATION OF FASCIA BOARD WITH FRAME 5,129.00 INSTALLATION OF STEEL STAIR RAILING 10,412.00 INSTALLATION OF BALCONY RAILING 13,890.00 INSTALLATION OF PARKING AREA TOP RAILING 10,822.00 INSTALLATION OF PERIMETER FENCING 19,227.00 DIV.4 ROOFING INSTALLATION OF LONG SPAN RIB-TYPE STEEL ROOFING COMPLETE WITH BENDED ACCESSORIES 20,227.00 DIV.5 CABINETS AND CLOSETS INSTALLATION OF KITCHEN COUNTER CABINET 3,132.00 INSTALLATION OF OVERHEAD KITCHEN CABINET 5,898.00 INSTALLATION OF BEDROOM CLOSET/S 5,850.00 DIV.6 FINISHING W ALL FINISHES RE-TOUCH PLASTERING OF EXTERIOR WALL 14,162.00 RE-TOUCH PLASTERING OF INTERIOR WALL 15,550.00 INSTALLATION OF TOILET WALL 300mm X 300mm GLAZED TILES 6,878.00 INSTALLATION OF WINDOW CANOPY 2,423.00 INSTALLATION OF MOULDING CEMENT 2,125.00 INSTALLATION OF SOUND PROOFING MATERIALS 8,876.00 INSTALLATION OF WALL CLADDING AND ACCENT WALLS 6,252.00 FLOOR FINISHES INSTALLATION OF 600mm X 600mm HOMOGENOUS FLOOR TILES 9,036.00 INSTALLATION OF 300mm X 300mm VITRIFIED FLOOR TILES 7,048.00 INSTALLATION OF 3mm VINYL WOOD PLANKS W/ BASEBOARD 9,494.00 INSTALLATION OF 3mm STAIR VINYL WOOD PLANKS W/ BASEBOARD 7,048.00 K ITCHEN AND GRANITE SLAB COUNTER TOP INSTALLATION OF GRANITE SLAB COUNTER TOP 5,469.00 INSTALLATION OF GLAZED WALL TILES 3,256.00 CEILING FINISHES INSTALLATION OF EXTERIOR CEILING ON METAL FURRING-3.5mm THK HARDIFLEX BOARD WITH AIRVENTS 8,573.00 INSTALLATION OF INTERIOR CEILING ON METAL FURRING -3.5MM THK HARDIFLEX BOARD 23,379.00 INSTALLATION OF 10 mm THK DOUBLE BUBBLE INSULATION 9,676.00 PAINTING W ORK S APPLYING OF SKIMCOAT FOR INTERIOR WALLS 4,620.00 APPLYING OF SKIMCOAT FOR EXTERIOR WALLS 3,600.00 APPLYING OF LATEX PAINT ON EXTERIOR MASONRY WALLS 11,528.00 APPLYING OF LATEX PAINT ON INTERIOR MASONRY WALLS/FICEM WALL 39,431.00 APPLYING OF LATEX PAINT ON EXTERIOR CEILING 2,902.00 APPLYING OF LATEX PAINT ON INTERIOR CEILING 8,110.00 APPLYING OF ENAMEL PAINT OF CABINETS / CLOSETS APPLYING OF ENAMEL PAINT ON RAILINGS AND GATE FENCE 16,825.00 APPLYING PAINT/VARNISH/PU ON STAIRS 6,567.00 DIV. 7 ELECTRICAL WORKS SUPPLY AND INSTALLATION OF COMPLETE SERVICE ENTRANCE WITH PEDESTAL POST INCLUDING ACSRY. 4,510.00 INSTALLATION OF COMPLETE PANEL BOARD AND INDIVIDUAL CIRCUIT BREAKER 3,424.00 INSTALLATION OF COMPLETE ELECTRICCAL LINE CONDUITS 6,077.00 INSTALLATION OF ELECTRICAL FIXTURE AND DEVICES 10,972.00 TOTAL LABOR COST: 404,400.00