M/s SRK Construction & Projects Pvt. Ltd.

,
Upgradation of Umred-Bhisi-Chimur-Warora, NH-353E, Package-II Chimur to Warora From Km. 47+700 TO 98+350 Km.
(Design Chainage) Excluding 7.90 Km. Length from Km. 52+700 to 60+600 Km. two lane with paved shoulder
configuration in the state of Maharastra on EPC mode

Summary of High Embankment Length for Metal Beam Cross Barrier BHS
Left Hand Side Right Hand Side
Sl Chainage Length Sl Chainage Length
No From To No From To
1 47860 47970 e 110 1 47850 47990 e 140
2 48080 48190 e 110 2 48050 48200 e 150
3 48020 48110 e 90 3 48000 48130 e 130
4 52000 52150 e 150 4 52010 52140 e 130
5 62050 62180 e 130 5 62030 62190 e 160
72300 72470 e 170 72300 72470 e 170
73080 73310 e 230 73080 73310 e 230
6 73590 73700 e 110 6 73600 73680 e 80
7 73780 73910 e 130 7 73760 73900 e 140
8 74700 74820 e 120 8 74690 74840 e 150
9 74880 75000 e 120 9 74900 75000 e 100
10 88550 88690 e 140 10 88530 88650 e 120
11 88780 88950 e 170 11 88790 88930 e 140
12 75060 75112 High Emb. 52 12 75060 75112 High Emb. 52
13 75182 75221.6 High Emb. 40 13 75182 75221.6 40
14 75254 75360 High Emb. 106 14 75254 75360 106
15 76858 76940 High Emb. 82 15 76858 76940 82
16 78360 78450 High Emb. 90 16 78360 78450 90
17 86420 86620 High Emb. 200 17 86480 86620 140
18 86630 86660 High Emb. 30 18 86630 86660 30
19 87540 87620 High Emb. 80 19 87540 87620 80
20 87630 87770 High Emb. 140 20 87630 87770 140
21 48943.626 49045 Forest 101.374 21 48943.626 49045 Forest 101.374
22 49811.05 49963.661 Forest 152.611 22 49811.05 49963.661 Forest 152.611
Total Length 2854 Total Length 2600
>>> >>>
Total 5453