Balochistan Composite Shedule of Rates Chapter -3, (Earth Work)

Vol - 1, 2023

Government of Balochistan
Volume-1
Composite Schedule of Rates

SECTION - 3
EARTH WORK

Earth Work (P/1) 1 - 13


Balochistan Composite Shedule of Rates Chapter -3, (Earth Work)
Vol - 1, 2023

SI Rate (Rs.)
Description Units
Labour Composite
3-1 Earth work excavation undressed, lead upto a single throw of kassi, phaorah,
shovel.
A) Manual (Maximium Area 250 Sft)
i) In ashes, sand, soft soil or silt clearance. Cu.m 142.80 142.80
Cu.ft 4.04 4.04
ii) In ordinary soil Cu.m 171.36 171.36
Cu.ft 4.85 4.85
iii) In hard soil Cu.m 294.00 294.00
Cu.ft 8.33 8.33
iv) In shingle or gravel Cu.m 588.00 588.00
Cu.ft 16.65 16.65
B) Equiptment
i) In ashes, sand, soft soil or silt clearance. Cu.m 130.83 130.83
Cu.ft 3.70 3.70
ii) In ordinary soil Cu.m 172.70 172.70
Cu.ft 4.89 4.89
iii) In hard soil Cu.m 209.33 209.33
Cu.ft 5.93 5.93
iv) In shingle or gravel Cu.m 261.66 261.66
Cu.ft 7.41 7.41
3-2 Earth work excavation undressed, lead upto 50 ft. (15m.)
A) Manual (Maximium Area 250 Sft)
i) In ashes, sand, soft soil or silt clearance. Cu.m 208.32 208.32
Cu.ft 5.90 5.90
ii) In ordinary soil Cu.m 252.00 252.00
Cu.ft 7.14 7.14
iii) In hard soil Cu.m 352.80 352.80
Cu.ft 9.99 9.99
iv) In shingle or gravel Cu.m 714.00 714.00
Cu.ft 20.22 20.22
B) Mechnical
i) In ashes, sand, soft soil or silt clearance. Cu.m 270.91 270.91
Cu.ft 7.67 7.67
ii) Ordinary soil Cu.m 359.46 359.46
Cu.ft 10.18 10.18
iii) Hard soil Cu.m 442.79 442.79
Cu.ft 12.54 12.54
iv) Shingle or gravel Cu.m 594.14 594.14
Cu.ft 16.82 16.82
3-3 Bed clearance in ordinary soil and dressing slopes of drains to required section
including removal of weeds, roots etc. and disposal of excavated material within 50
ft. (15m) lead.
A) Excavated material undressed Cu.m 265.44 265.44
Cu.ft 7.52 7.52
B) Excavated material dressed in specified manner. Cu.m 285.60 285.60
Cu.ft 8.09 8.09
3-4
Borrow pit excavation depth upto 10 ft. (3 m) undressed lead upto 100 ft. (30m)
A) In ashes, sand, soft soil or silt clearance. Cu.m 317.60 317.60
Cu.ft 8.99 8.99
B) Ordinary soil Cu.m 406.16 406.16
Cu.ft 11.50 11.50
C) Hard soil Cu.m 489.48 489.48
Cu.ft 13.86 13.86
D) Shingle or gravel Cu.m 687.53 687.53
Cu.ft 19.47 19.47
3-5 Earthwork for embankment lead upto 1000 M and compaction by mechanical
means at optimum moisture content, dressing to designed section including laying,
leveling and watering.
A- Sand
i) 95% maximum modified AASHTO dry density Cu.m 8.40 259.03
Cu.ft 0.24 7.33
ii) 90% maximum modified AASHTO dry density Cu.m 8.40 248.80
Cu.ft 0.24 7.05

Earth Work (P/2) 2 - 13


Balochistan Composite Shedule of Rates Chapter -3, (Earth Work)
Vol - 1, 2023
SI
Description Units
Labour Composite
iii) 85% maximum modified AASHTO dry density Cu.m 8.40 214.21
Cu.ft 0.24 6.07
B- Ordinary soil
i) 95% maximum modified AASHTO dry density Cu.m 11.76 383.44
Cu.ft 0.33 10.86
ii) 90% maximum modified AASHTO dry density Cu.m 11.76 354.94
Cu.ft 0.33 10.05
iii) 85% maximum modified AASHTO dry density Cu.m 11.76 344.71
C- Hard soil Cu.ft 0.33 9.76
i) 95% maximum modified AASHTO dry density Cu.m 15.12 559.01
Cu.ft 0.43 15.83
ii) 90% maximum modified AASHTO dry density Cu.m 15.12 466.44
Cu.ft 0.43 13.21
iii) 85% maximum modified AASHTO dry density Cu.m 15.12 416.50
Cu.ft 0.43 11.79
D- Shingle or gravel
i) 95% maximum modified AASHTO dry density Cu.m 15.12 732.90
Cu.ft 0.43 20.75
ii) 90% maximum modified AASHTO dry density Cu.m 15.12 681.74
Cu.ft 0.43 19.30
iii) 85% maximum modified AASHTO dry density Cu.m 15.12 630.59
Cu.ft 0.43 17.86
3-6 Earthwork for embankment lead upto 100 ft. (30m) and compaction by Manual
(Maximium Area 250 Sft) labour at optimum moisture content, dressing to
designed section, laying, leveling and watering.
A- Sand Cu.m 455.70 455.70
Cu.ft 12.90 12.90
B- Ordinary soil Cu.m 531.30 531.30
Cu.ft 15.04 15.04
C- Hard soil Cu.m 808.50 808.50
Cu.ft 22.89 22.89
D- Shingle or gravel Cu.m 1,102.50 1,102.50
Cu.ft 31.22 31.22
3-7 Earthwork excavation in open cutting upto 5ft. (1.5m) depth for storm water
channels, drains in open area, roads, streets lanes and shoring to protect existing
works, shuttering and timbering the trenches dressed to designed level and
dimension, trimming from trenches, backfilling and disposal of surplus excavated
material upto 50ft (15m) including dressing, excluding removal of surface water
from drains.
A- In ashes, sand, soft soil or silt clearance. Cu.m 38.22 272.80
Cu.ft 1.08 7.72
B- Ordinary soil Cu.m 39.90 350.59
Cu.ft 1.13 9.93
C- Hard soil Cu.m 41.58 423.16
Cu.ft 1.18 11.98
D- Shingle or gravel Cu.m 43.26 534.22
3-8 Earthwork excavation in open cutting from 5ft. to 10 ft (1.5m to 3 m) depth for
storm water channels, drains in open area, roads, streets lanes and shoring to
protect existing works, shuttering and timbering the trenches dressed to designed
level and dimension, trimming from trenches, backfilling and disposal of surplus
excavated material upto 100 ft (30 m) including dressing, excluding removal of
surface water from drains.
A- In ashes, sand, soft soil or silt clearance. Cu.m 102.18 338.68
Cu.ft 2.89 9.59
B- Ordinary soil Cu.m 112.26 425.12
Cu.ft 3.18 12.04
C- Hard soil Cu.m 131.10 515.36
Cu.ft 3.71 14.59
D- Shingle or gravel Cu.m 156.60 628.16
Cu.ft 4.43 17.79
3-9 Excavation in shingle or gravel formation, undressed lead upto 100 ft. (30m)
A- Manual (Maximium Area 250 Sft)
i) Dry Cu.m 530.88 530.88
Cu.ft 15.03 15.03
ii) Wet Cu.m 834.96 834.96
Cu.ft 23.64 23.64

Earth Work (P/3) 3 - 13


Balochistan Composite Shedule of Rates Chapter -3, (Earth Work)
Vol - 1, 2023
SI
Description Units
Labour Composite
iii) In flowing water Cu.m 1,063.44 1,063.44
Cu.ft 30.11 30.11
iv) Under water including dewatering Cu.m 1,050.00 1,455.00
Cu.ft 29.73 41.20
B- Machinery
i) Dry Cu.m 313.99 313.99
Cu.ft 8.89 8.89
ii) Wet Cu.m 418.66 418.66
Cu.ft 11.86 11.86
iii) In flowing water Cu.m 523.32 523.32
Cu.ft 14.82 14.82
iv) Under water including dewatering Cu.m 252.00 1,194.98
Cu.ft 7.14 33.84
3-10
Earthwork excavation in irrigation channels drains etc. to designed section, grades
and profiles excavated material disposed off and dressed within 50 ft (15m) lead.
A- Manual (Maximium Area 250 Sft)
i) In ashes, sand, soft soil or silt clearance. Cu.m 266.52 266.52
Cu.ft 7.55 7.55
ii) Ordinary soil Cu.m 337.50 337.50
Cu.ft 9.56 9.56
iii) Hard soil Cu.m 435.42 435.42
Cu.ft 12.33 12.33
iv) Shingle or gravel formation Cu.m 701.10 701.10
Cu.ft 19.85 19.85
B- Machinery
i) In ashes, sand, soft soil or silt clearance. Cu.m 16.38 227.01
Cu.ft 0.46 6.43
ii) Ordinary soil Cu.m 21.20 296.50
Cu.ft 0.60 8.40
iii) Hard soil Cu.m 27.60 373.73
Cu.ft 0.78 10.58
iv) Shingle or gravel formation Cu.m 36.18 521.17
Cu.ft 1.02 14.76
3-11 Excavation in rock dressed to designed section, grades and profiles, excavated
material disposed of within 100 ft.(30 m) & lift upto 6.5 ft. (2m.)
A) Soft rock, slate, shale, work, with pick and crow bar. Cu.m 130.50 660.00
Cu.ft 3.70 18.69
B) Medium hard rock schist or laterite requiring occasional blasting Cu.m 1,187.70 1,306.47
Cu.ft 33.63 37.00
3-12 Excavation in hard rock requiring blasting and disposal of excavated material
(blasted material) upto 50 ft. (15m) lead, (including dressing and levelling to
designated section).
A) Grade I Cu.m 726.42 908.03
Cu.ft 20.57 25.71
B) Grade II Cu.m 835.38 1,053.31
Cu.ft 23.66 29.83
C) Grade III Cu.m 960.69 1,222.20
Cu.ft 27.20 34.61
D) Grade IV Cu.m 1,032.06 1,444.88
Cu.ft 29.22 40.91
E) Grade V Cu.m 1,135.27 1,589.37
Cu.ft 32.15 45.01
F) Grade VI Cu.m 1,214.73 1,700.63
Cu.ft 34.40 48.16
3-13 Excavation in hard rock requiring blasting but blasting prohibited and disposal of
excavated material within 50 ft. (15m) lead, (including dressing and levelling to
designed section etc.).
A) Grade I Cu.m 954.00 1,192.50
Cu.ft 27.01 33.77
B) Grade II Cu.m 1,097.10 1,395.23
Cu.ft 31.07 39.51
C) Grade III Cu.m 1,261.67 1,634.32
Cu.ft 35.73 46.28
D) Grade IV Cu.m 1,358.40 1,630.08

Earth Work (P/4) 4 - 13


Balochistan Composite Shedule of Rates Chapter -3, (Earth Work)
Vol - 1, 2023
SI
Description Units
Labour Composite
Cu.ft 38.47 46.16
E) Grade V Cu.m 1,494.24 1,793.09
Cu.ft 42.31 50.77
F) Grade VI Cu.m 1,643.66 1,972.40
3-14 Rehandling of earthwork Cu.ft 46.54 55.85
A) Lead upto a single throw of Kassi, phaorah or shovel Cu.m 117.60 117.60
Cu.ft 3.33 3.33
B) Upto a lead of 50 ft. (15 m.) Cu.m 168.00 168.00
Cu.ft 4.76 4.76
C) Upto a lead of 100 ft. (30 m.) Cu.m 218.40 218.40
Cu.ft 6.18 6.18
3-15 Rehandling of gravel work or excavated rock, lead upto 50 ft. (15m.) Cu.m 379.68 379.68
Cu.ft 10.75 10.75
3-16 Filling, watering and compacting earth under floors in layers not exceeding 8 inchs
in thickness.

A) With surplus earth from foundation etc. Cu.m 113.64 217.01


Cu.ft 3.22 6.15
B) With new earth excavated from outside, lead upto 100 ft. (30m) and lift upto 5 ft.
Cu.m 113.64 367.46
(1.5m) including royality of Clay
Cu.ft 3.22 10.41
C)
With sand excavated from outside, lead upto 25 km including royality of sand, no
Cu.m 19.14 1,966.67
additional lead shall be paid without prior approval of Engineer incharge.
Cu.ft 0.54 55.69
3-17 Filling, watering and ramming earth under floors for every 50 ft. (15m) additional
lead or part thereof (Maximum upto 1000 ft.) (300 m)
A) For earthwork soft, ordinary, hard and very hard Cu.m 4.03 4.03
Cu.ft 0.11 0.11
B) For gravel, shingle or rock Cu.m 5.21 5.21
3-18 Dressing and levelling of earthwork to designed section. Cu.ft 0.15 0.15
A) Ashes, sand, silt or soft soil Cu.m 13.74 13.74
Cu.ft 0.39 0.39
B) Ordinary or hard soil Cu.m 24.18 24.18
Cu.ft 0.68 0.68
C) Gravel work or soft rock not requiring blasting Cu.m 58.50 58.50
Cu.ft 1.66 1.66
3-19 Dressing dowels of canal banks, marginal bunds and flood protection bunds. R.M 10.32 10.32
R.ft 3.15 3.15
A) Dressing slopes of banks or ground surface Sqm 15.12 15.12
Sq.ft 1.40 1.40
B) Dressing of earthwork by machinery or otherwise and left undressed Sqm 26.88 26.88
Sq.ft 2.50 2.50
3-21 Excavation in foundation of buildings and bridges including layout, dressing, refilling
around structures with excavated earth, watering & ramming lead upto 100 ft.
(30m) & lift upto 5 ft. (1.5m)
A- Manual (Maximium Area 250 Sft)
i) Sand, ashes or loose soil Cu.m 344.10 344.10
Cu.ft 9.74 9.74
ii) Ordinary soil Cu.m 400.20 400.20
Cu.ft 11.33 11.33
iii) Hard soil or soft murum Cu.m 449.28 449.28
Cu.ft 12.72 12.72
iv) Shingle or gravel Cu.m 523.80 523.80
Cu.ft 14.83 14.83
B- Mechnical

i) Sand Cu.m 81.72 299.42


Cu.ft 2.31 8.48
ii) Ordinary soil Cu.m 108.96 415.62
Cu.ft 3.09 11.77
iii) Hard soil Cu.m 141.42 518.41
Cu.ft 4.00 14.68
iv) Shingle or gravel formation Cu.m 170.40 625.89
Cu.ft 4.83 17.72

Earth Work (P/5) 5 - 13


Balochistan Composite Shedule of Rates Chapter -3, (Earth Work)
Vol - 1, 2023
SI
Description Units
Labour Composite
3-22 Cutting hard rock such as granite, ballast, hard lime stone or sand stone etc. with
Cu.m 2,828.64 3,862.72
chisels and hammers for small foundation.
Cu.ft 80.10 109.38
3-23 Extra for excavation requiring shoring. Cu.m 56.64 58.34
Cu.ft 1.60 1.65
3-24 Manual (Maximium Area 250 Sft) Compaction of earthwork (soft, ordinary, or hard
soil)
A)
Mixing, moisturing earth to optimum moisture content in layers for compaction. Cu.m 46.80 46.80
Cu.ft 1.33 1.33
B) Compaction by rolling with animal driven roller/hand rammed.
i) Soft and sandy soil Cu.m 133.86 133.86
Cu.ft 3.79 3.79
ii) Ordinary soil Cu.m 142.99 142.99
Cu.ft 4.05 4.05
iii) Hard soil Cu.m 153.22 153.22
Cu.ft 4.34 4.34
iv) Shingle or gravel Cu.m 164.19 164.19
Cu.ft 4.65 4.65
C) Ramming earth work (all type of soil) Cu.m 57.98 57.98
Cu.ft 1.64 1.64
D) Ramming earth work behind retaining wall Cu.m 76.73 76.73
Cu.ft 2.17 2.17
3-25 Compaction of earthwork in embankment to full depth and width by approved
mechanical means in layer not exceeding 10 inches (230mm) in depth at optimum
moisture content including watering by mechanical means.
A) 95% maximum modified AASHTO dry density. Cu.m 51.13 607.14
Cu.ft 1.45 17.19
B) 90% maximum modified AASHTO dry density. Cu.m 51.13 498.08
Cu.ft 1.45 14.10
C) 85% maximum modified AASHTO dry density. Cu.m 51.13 443.55
Cu.ft 1.45 12.56
3-26 Extra for wet earthwork (Supporting man's weight) Cu.m 114.24 114.24
Cu.ft 3.23 3.23
3-27 Extra for slush or daldal including dewatering (Not supporting man's weight) Cu.m 304.08 304.08
Cu.ft 8.61 8.61
3-28 Extra for pudding Cu.m 238.92 238.92
Cu.ft 6.77 6.77
3-29 Earthwork on small rain water drains, along canal banks, roads and plantation
R.M. 35.28 35.28
drains dressed.
R.ft 10.76 10.76
3-30 Filling and compacting soil, earth and boulders behind retaining walls (including
Cu.m 341.04 341.04
excavation of soil and lead upto 50 ft. (15m)
Cu.ft 9.66 9.66
3-31 Survey
A) Dag belling 3" (75 mm.) deep Km. 2,469.60 2,469.60
B)
Cross Sectional Survey for roads using Total Station or Differential GPS (GNSS) Km. 36,000.00 36,000.00
3-32 Turfing slopes of banks or lawns with grass sods including ploughing, laying, setting
and watering (Truf obtained from within a distance of 8km (5 miles) and Sqm 193.20 193.20
maintained for 15 days).
Sq.ft 17.95 17.95
3-33 Berm Cutting.
A) Lead upto a single throw of kassi, phaorah or shovel (without dressing) Cu.m 171.36 171.36
Cu.ft 4.85 4.85
B) Lead upto 50 ft. (15 m.), including dressing Cu.m 341.04 341.04
Cu.ft 9.66 9.66
3-34 Berm trimming both sides of channels.
A) Upto 3 ft. (1.0 m) Channel depth Cu.m 8,339.40 8,339.40
Cu.ft 236.15 236.15
B) Exceeding 3 ft. to 5 ft. (1.0 m to 1.5 m) Channel depth Cu.m 8,124.00 8,124.00
Cu.ft 230.05 230.05
C) Exceeding 5 ft. to 8 ft. (1.5m to 2.5m) Channel depth Cu.m 11,166.00 11,166.00
Cu.ft 316.19 316.19
3-35 Ploughing and levelling borrow pits.
A) Upto 3 ft. (1 m) depth Hectare 24,885.00 24,885.00

Earth Work (P/6) 6 - 13


Balochistan Composite Shedule of Rates Chapter -3, (Earth Work)
Vol - 1, 2023
SI
Description Units
Labour Composite
B) Above 3 ft. (1 m) depth Hectare 49,770.00 49,770.00
3-36
Making boundary or service roads including dagbelling, levelling and dressing.
A) Unploughed land
i) From 10 ft. to 20 ft. (3 m. to 6 m.) wide R.M. 67.98 67.98
R.ft 20.73 20.73
ii) From 20 ft. to 40 ft. (6 m. to 12 m.) wide R.M. 92.34 92.34
R.ft 28.15 28.15
B) Ploughed Land
i) From 10 ft. to 20 ft. (3 m to 6 m) wide R.M. 47.59 47.59
R.ft 14.51 14.51
ii) From 20 ft. to 40 ft. (6 m. to 12 m.) wide R.M. 64.64 64.64
R.ft 19.71 19.71
3-37 Earthwork by boats, including hire charges of boats.
A) Digging and loading into boats upto 50 ft. (15 m) lead Cu.m 285.60 285.60
Cu.ft 8.09 8.09
B) Carriage by boats upto 1000 ft. (300 m) Cu.m 224.40 224.40
Cu.ft 6.35 6.35
C)
Extra for every additional 100 ft. (30m) or part thereof beyond 1000 ft. (300m) Cu.m 13.20 13.20
Cu.ft 0.37 0.37
D) Un-loading Carriage by boats upto 1000 ft. (300 m) Cu.m 132.72 132.72
Cu.ft 3.76 3.76
3-38 Unloading earth from B.G. trucks and clearing 5 ft. (1.5 m) from rail Cu.m 114.24 114.24
Cu.ft 3.23 3.23
3-39
Earthwork by tramway, digging and loading into trucks, upto 50 ft. (15m) lead Cu.m 265.44 265.44
Cu.ft 7.52 7.52
3-40 Unloading earth from B.G. trucks and spreading upto 50 ft. (15m) from rail Cu.m 171.36 171.36
Cu.ft 4.85 4.85
3-41 Supplying clean and screened river or pit sand within 500 ft. (150m) Cu.m 1,008.00 1,008.00
Cu.ft 28.54 28.54
3-42 Excavation in open cutting for sewers and manholes as shown in drawings, dressing
to correct sections and dimensions according to templates and levels and removing
surface water in all types of soil except rock
(i) The rate includes back filling after laying of sewer, which is payable separately.
(ii) The rate for close/open shuttering & timbering will be as per item No. 3-43 & 3-
44 where actually used at site.
A) Upto 5 ft. (1.5 m) depth
i) In ashes, sand, soft soil or silt clearance. Cu.m 4.20 135.03
Cu.ft 0.12 3.82
ii) Ordinary soil Cu.m 5.54 178.24
Cu.ft 0.16 5.05
iii) Hard soil Cu.m 8.40 270.06
Cu.ft 0.24 7.65
iv) Shingle or gravel Cu.m 12.60 405.09
Cu.ft 0.36 11.47
B) Below 5 ft. to 10 ft. (1.5 m to 3.0 m) depth
i) In ashes, sand, soft soil or silt clearance. Cu.m 5.54 178.24
Cu.ft 0.16 5.05
ii) Ordinary soil Cu.m 8.40 270.06
Cu.ft 0.24 7.65
iii) Hard soil Cu.m 12.60 405.09
Cu.ft 0.36 11.47
iv) Shingle or gravel Cu.m 16.80 540.12
Cu.ft 0.48 15.29
C) Below 10 ft. to 15 ft. (3.0 m to 4.5 m) depth
i) In ashes, sand, soft soil or silt clearance. Cu.m 6.72 216.05
Cu.ft 0.19 6.12
ii) Ordinary soil Cu.m 10.08 324.07
Cu.ft 0.29 9.18
iii) Hard soil Cu.m 15.12 486.11
Cu.ft 0.43 13.77
iv) Shingle or gravel Cu.m 20.16 648.14

Earth Work (P/7) 7 - 13


Balochistan Composite Shedule of Rates Chapter -3, (Earth Work)
Vol - 1, 2023
SI
Description Units
Labour Composite
Cu.ft 0.57 18.35
D) Below 15 ft. to 20 ft. (4.5 m to 6.0 m) depth
i) In ashes, sand, soft soil or silt clearance. Cu.m 8.40 270.06
Cu.ft 0.24 7.65
ii) Ordinary soil Cu.m 12.60 405.09
Cu.ft 0.36 11.47
iii) Hard soil Cu.m 16.80 540.12
Cu.ft 0.48 15.29
iv) Shingle or gravel Cu.m 20.16 648.14
Cu.ft 0.57 18.35
3-43 Providing and fixing close shuttering and timbering for excavation in open cutting
for sewers and manholes as shown in drawings and removing of timbering after
completion of job.
A) For depth upto 5 ft. (1.5 m.). Sqm 95.81 600.33
Sq.ft 8.90 55.77
B) For depth below 5 ft. to 10 ft. (1.5 m to 3.0 m.) Sqm 109.49 657.90
Sq.ft 10.17 61.12
C) For depth below 10 ft. to 15 ft. (3.0 m to 4.5 m.) Sqm 123.18 938.94
Sq.ft 11.44 87.23
D) For depth below 15 ft. to 20 ft. (4.5 m to 6 m.) Sqm 136.87 1,059.55
Sq.ft 12.72 98.44
3-44 Providing and fixing open shuttering and timbering for excavation in open cutting
for sewers and manholes as shown in drawings and removing of timbering after
completion of job.
A) For depth upto 5 ft. (1.5 m.). Sqm 95.81 423.72
Sq.ft 8.90 39.37
B) For depth below 5 ft. to 10 ft. (1.5 m to 3.0 m.) Sqm 109.49 481.30
Sq.ft 10.17 44.71
C) For depth below 10 ft. to 15 ft. (3.0 m to 4.5 m.) Sqm 123.18 688.75
Sq.ft 11.44 63.99
D) For depth below 15 ft. to 20 ft. (4.5 m to 6 m.) Sqm 136.87 809.36
Sq.ft 12.72 75.19
3-45 Excavation in open cutting for sewer and manholes as shown in drawings below
sub-soil water level to correct section and dimension according to templates and
levels including shoring, timbering and shuttering of M.S. sheets on both sides of
the trenches.
A) Upto 4 ft. (1.25 m) depth below S.S.W.L. Cu.m 554.40 1,202.81
Cu.ft 15.70 34.06
B) Below 4 ft. to 8 ft. ( 1.25 m to 2.50 m ) depth below S.S.W.L. Cu.m 831.60 1,480.01
Cu.ft 23.55 41.91
C) Exceeding below 8 ft. ( 2.5 m.) depth below S.S.W.L. Cu.m 1,108.80 1,757.21
Cu.ft 31.40 49.76
3-46 Levelling and dressing the ground by cutting and filling of earth in depth upto 6
inches including consolidating.
A) Rough Levelling in Ordinary Soil
i) Plain Area Sqm 0.50 19.80
Sq.ft 0.05 1.84
ii) Sloppy Area Sqm 1.01 39.60
Sq.ft 0.09 3.68
B) Rough Levelling Hard Soil
i) Plain Area Sqm 0.84 29.70
Sq.ft 0.08 2.76
ii) Sloppy Area Sqm 1.68 66.00
Sq.ft 0.16 6.13
C) Rough Levelling Sandy Soil
i) Plain Area Sqm 0.34 13.20
Sq.ft 0.03 1.23
ii) Sloppy Area Sqm 0.67 26.40
Sq.ft 0.06 2.45
D) Extra for Lazer Levelling
i) Normal Soil Sqm 0.85 15.84
Sq.ft 0.08 1.47
ii) Hard Soil Sqm 0.54 21.12
Sq.ft 0.05 1.96
iii) Sandy Soil Sqm 0.34 13.20

Earth Work (P/8) 8 - 13


Balochistan Composite Shedule of Rates Chapter -3, (Earth Work)
Vol - 1, 2023
SI
Description Units
Labour Composite
Sq.ft 0.03 1.23
3-47 Cutting and removing trees within a distance of 100 ft. (30m)
A) Upto 2.5 ft. ( 0.75 m.) girth Each 1,545.60 1,545.60
B) Above 2.5 ft. to 6 ft. ( 0.75 m to 1.8 m.) girth Each 3,024.00 3,024.00
3-48 Up-rooting & removing stumps upto 100 ft.(30m) from 1.5 ft. to 6 ft. (0.50m to
Each 2,016.00 2,016.00
1.75m) girth.
3-49 Jungle clearance and removing upto 100 ft. ( 30m.)
A) Light Sqm 288.96 288.96
Sq.ft 26.85 26.85
B) Thick Sqm 577.92 577.92
Sq.ft 53.69 53.69
3-50 Uprooting sarkanda growth & disposal upto 100 ft. ( 30 m.) Sqm 13.44 13.44
Sq.ft 1.25 1.25
3-51 Ploughing three ( 3 ) times. Hectare 23,652.72 23,652.72
3-52 Levelling, dressing & making lawns. Sqm 57.12 57.12
Sq.ft 5.31 5.31
3-53 Clearing jungle by cutting, removing all shrubs, trees and taking out entire roots
and filling the hollows with earth, dressing, consolidating and watering the filling
Sqm 48.72 48.72
including stacking the serviceable material and disposal of unserviceable material
lead upto 1000 ft. (300 m.)
Sq.ft 4.53 4.53
3-54 Clearing jungle by cutting, removing all shrubs, trees and taking out entire roots
and filling the hollows with earth, dressing, consolidating and watering the filling
Sqm 69.00 69.00
including stacking the serviceable material and disposal of unserviceable material
lead upto 1000 ft. (300 m.)
Sq.ft 6.41 6.41
3-55
Manual Levelling and dressing the ground by cutting and filling earth upto 6
inches (150mm) in depth including consolidating and watering. To be used for area Sqm 25.50 25.50
less than 100 sq.m, for areas more than 100 sq.m item No. 3-46 to be utilized.
Sq.ft 2.37 2.37
3-56
Excavation of shaft of Karez of internal size of 1m x 1.75m in including loading and
disposal of excavated material within 30m (100 Ft) lead in ordinary soil/sand.
A) Up to 6m (20Ft) below ground level in dry condition Cu.m 4,080.30 4,080.30
Cu.ft 115.54 115.54
B) 6m to 12m below ground level in dry condition Cu.m 5,541.90 5,541.90
Cu.ft 156.93 156.93
C) 12m to 50m below ground level in dry condition Cu.m 6,650.28 6,650.28
Cu.ft 188.31 188.31
D) 50m to 75m below ground level in dry condition Cu.m 7,647.82 7,647.82
Cu.ft 216.56 216.56
E) 75m to 100m below ground level in dry condition Cu.m 8,412.60 8,412.60
Cu.ft 238.22 238.22
F) Above 100m below ground level to any depth in dry condition Cu.m 8,833.23 8,833.23
Cu.ft 250.13 250.13
G) Additional for wet conditions for items 3-56(A-F) Cu.m 15%
H) Additional for below spring level/in flowing conditions for items 3-56(A-F) Cu.m 25%
3-57 Excavation of tunnel of Karez of internal size 1m x 1.75m including loading and
disposal of excavated material within 30m in ordinary soil/sand
A) Up to 6m (20Ft) below ground level in any length and in dry condition Cu.m 5,968.20 5,968.20
Cu.ft 169.00 169.00
B) 6m to 12m below ground level in any length and in dry condition Cu.m 8,526.00 8,526.00
Cu.ft 241.43 241.43
C) 12m to 50m below ground level in any length and in dry condition Cu.m 10,231.20 10,231.20
Cu.ft 289.72 289.72
D) 50m to 75m below ground level in any length and in dry condition Cu.m 11,765.88 11,765.88
Cu.ft 333.17 333.17
E) 75m to 100m below ground level in any length and in dry condition Cu.m 12,942.47 12,942.47
Cu.ft 366.49 366.49
F)
Above 100m below ground level in any length and to any depth in dry condition Cu.m 13,589.59 13,589.59
Cu.ft 384.81 384.81
G) Additional for wet conditions for items 3-57(A-F) Cu.m 15%
H) Additional for below spring level/in flowing conditions for items 3-57(A-F) Cu.m 25%
I) Cleaning of Karez silt/debris of any length in the range of depths as mentioned in
Cu.m 20%
items 3-57(A-F)

Earth Work (P/9) 9 - 13


Balochistan Composite Shedule of Rates Chapter -3, (Earth Work)
Vol - 1, 2023
SI
Description Units
Labour Composite
3-58
Excavation of shaft of Karez of internal size of 1m x 1.75m in including loading and
disposal of excavated material within 30m (100 Ft) lead in hard soil
A) Up to 6m (20Ft) below ground level in dry condition Cu.m 5,115.60 5,115.60
Cu.ft 144.86 144.86
B) 6m to 12m below ground level in dry condition Cu.m 7,673.40 7,673.40
Cu.ft 217.29 217.29
C) 12m to 50m below ground level in dry condition Cu.m 9,208.08 9,208.08
Cu.ft 260.74 260.74
D) 50m to 75m below ground level in dry condition Cu.m 10,589.29 10,589.29
Cu.ft 299.86 299.86
E) 75m to 100m below ground level in dry condition Cu.m 11,648.22 11,648.22
Cu.ft 329.84 329.84
F) Above 100m below ground level to any depth in dry condition Cu.m 12,230.63 12,230.63
Cu.ft 346.33 346.33
G) Additional for wet conditions for items 3-58(A-F) Cu.m 15%
H) Additional for below spring level/in flowing conditions for items 3-58(A-F) Cu.m 25%
3-59 Excavationof tunnel of Karez of internal size 1m x 1.75m including loading and
disposal of excavated material within 30m in hard soil
A) Up to 6m (20Ft) below ground level in any length and in dry condition Cu.m 7,673.40 7,673.40
Cu.ft 217.29 217.29
B) 6m to 12m below ground level in any length and in dry condition Cu.m 6,333.60 6,333.60
Cu.ft 179.35 179.35
C) 12m to 50m below ground level in any length and in dry condition Cu.m 7,600.32 7,600.32
Cu.ft 215.22 215.22
D) 50m to 75m below ground level in any length and in dry condition Cu.m 8,740.37 8,740.37
Cu.ft 247.50 247.50
E) 75m to 100m below ground level in any length and in dry condition Cu.m 9,614.40 9,614.40
Cu.ft 272.25 272.25
F)
Above 100m below ground level in any length and to any depth in dry condition Cu.m 10,095.13 10,095.13
Cu.ft 285.86 285.86
G) Additional for wet conditions for items 3-59(A-F) Cu.m 15%
H) Additional for below spring level/in flowing conditions for items 3-59A-F Cu.m 25%
I) Additional for Cleaning of Karez silt/debris of any length in the range of depths as
Cu.m 20%
mentioned in items 3-59A-F
3-60 Excavation of shaft of Karez of internal size of 1m x 1.75 m in including loading and
disposal of excavated material within 30m (100 Ft) lead in in hard strata including
shingle, gravel or equivalent.
A) Up to 6m (20Ft) below ground level in dry condition Cu.m 7,886.55 7,886.55
Cu.ft 223.32 223.32
B) 6m to 12m below ground level in dry condition Cu.m 13,428.45 13,428.45
Cu.ft 380.25 380.25
C) 12m to 50m below ground level in dry condition Cu.m 16,114.14 16,114.14
Cu.ft 456.30 456.30
D) 50m to 75m below ground level in dry condition Cu.m 18,531.26 18,531.26
Cu.ft 524.75 524.75
E) 75m to 100m below ground level in dry condition Cu.m 20,384.39 20,384.39
Cu.ft 577.22 577.22
F) Above 100m below ground level to any depth in dry condition Cu.m 21,403.61 21,403.61
Cu.ft 606.08 606.08
G) Additional for wet conditions for items 3-60 from (A-F) Cu.m 0.18 15%
H)
Additional for below spring level/in flowing conditions for items 3-60 from (A-F) Cu.m 0.24 20%
3-61 Excavation of tunnel of Karez of internal size 1m x 1.75m including loading and
disposal of excavated material within 30m in hard strata i/c shingle, gravel or
equivalent
A) Up to 6m (20Ft) below ground level in any length and in dry condition Cu.m 10,018.05 10,018.05
Cu.ft 283.68 283.68
B) 6m to 12m below ground level in any length and in dry condition Cu.m 14,281.05 14,281.05
Cu.ft 404.39 404.39
C) 12m to 50m below ground level in any length and in dry condition Cu.m 17,137.26 17,137.26
Cu.ft 485.27 485.27
D) 50m to 75m below ground level in any length and in dry condition Cu.m 19,707.85 19,707.85
Cu.ft 558.06 558.06
E) 75m to 100m below ground level in any length and in dry condition Cu.m 21,678.63 21,678.63

Earth Work (P/10) 10 - 13


Balochistan Composite Shedule of Rates Chapter -3, (Earth Work)
Vol - 1, 2023
SI
Description Units
Labour Composite
Cu.ft 613.87 613.87
F)
Above 100m below ground level in any length and to any depth in dry condition Cu.m 22,762.57 22,762.57
Cu.ft 644.56 644.56
G) Additional for wet conditions for items 3-61(A-F) Cu.m 15%
Cu.ft - 0.00
H) Additional for below spring level/in flowing conditions for items 3-61(A-F) Cu.m 25%
I) Additional for Cleaning of Karez silt/debris of any length in the range of depths as
Cu.m 20%
mentioned in items 3-61 from (A-F)
3-62 Excavation of shaft of Karez of internal size of 1m x 1.75m in including loading and
disposal of excavated material within 30m (100 Ft) lead in soft to medium rock or
shale/lime stone
A) Up to 6m (20Ft) below ground level in dry condition Cu.m 17,478.30 17,478.30
Cu.ft 494.93 494.93
B) 6m to 12m below ground level in dry condition Cu.m 22,380.75 22,380.75
Cu.ft 633.75 633.75
C) 12m to 50m below ground level in dry condition Cu.m 26,856.90 26,856.90
Cu.ft 760.50 760.50
D) 50m to 75m below ground level in dry condition Cu.m 30,885.44 30,885.44
Cu.ft 874.58 874.58
E) 75m to 100m below ground level in dry condition Cu.m 33,973.98 33,973.98
Cu.ft 962.04 962.04
F) Above 100m below ground level to any depth in dry condition Cu.m 35,672.68 35,672.68
Cu.ft 1,010.14 1,010.14
G) Additional for wet conditions for items 3-62(A-F) Cu.m 15%
H) Additional for below spring level/in flowing conditions for items 3-62(A-F) Cu.m 20%
3-63 Excavationof tunnel of Karez of internal size 1m x 1.75 m including loading and
disposal of excavated material within 30m in in soft to medium rock or shale/lime
stone
A) Up to 6m (20Ft) below ground level in any length and in dry condition Cu.m 17,904.60 17,904.60
Cu.ft 507.00 507.00
B) 6m to 12m below ground level in any length and in dry condition Cu.m 19,366.20 19,366.20
Cu.ft 548.39 548.39
C) 12m to 50m below ground level in any length and in dry condition Cu.m 23,239.44 23,239.44
Cu.ft 658.07 658.07
D) 50m to 75m below ground level in any length and in dry condition Cu.m 26,725.36 26,725.36
Cu.ft 756.78 756.78
E) 75m to 100m below ground level in any length and in dry condition Cu.m 29,397.89 29,397.89
Cu.ft 832.45 832.45
F)
Above 100m below ground level in any length and to any depth in dry condition Cu.m 30,867.79 30,867.79
Cu.ft 874.08 874.08
G) Additional for wet conditions for items 3-63(A-F) Cu.m 15%
H) Additional for below spring level/in flowing conditions for items 3-63(A-F) Cu.m 25%
I) Additional for Cleaning of Karez silt/debris of any length in the range of depths as
Cu.m 20%
mentioned in items 3-63 from (A-F)
3-64
Excavation of shaft of Karez of internal size of 1m x 1.75m in including loading and
disposal of excavated material within 30m (100 Ft) lead in hard rock
A) Up to 6m (20Ft) below ground level in dry condition Cu.m 38,367.00 38,367.00
Cu.ft 1,086.43 1,086.43
B) 6m to 12m below ground level in dry condition Cu.m 46,253.55 46,253.55
Cu.ft 1,309.75 1,309.75
C) 12m to 50m below ground level in dry condition Cu.m 55,504.26 55,504.26
Cu.ft 1,571.70 1,571.70
D) 50m to 75m below ground level in dry condition Cu.m 63,829.90 63,829.90
Cu.ft 1,807.46 1,807.46
E) 75m to 100m below ground level in dry condition Cu.m 70,212.89 70,212.89
Cu.ft 1,988.21 1,988.21
F) Above 100m below ground level to any depth in dry condition Cu.m 73,723.53 73,723.53
Cu.ft 2,087.62 2,087.62
G) Additional for wet conditions for items 3-64(A-F) Cu.m 15%
H)
Additional for below spring level/in flowing conditions for items 3-64 from (A-F) Cu.m 20%
3-65 Excavation of tunnel of Karez of internal size 1m x 1.75m including loading and
disposal of excavated material within 30m in hard rock.
A) Up to 6m (20Ft) below ground level in any length and in dry condition Cu.m 26,856.90 26,856.90

Earth Work (P/11) 11 - 13


Balochistan Composite Shedule of Rates Chapter -3, (Earth Work)
Vol - 1, 2023
SI
Description Units
Labour Composite
Cu.ft 760.50 760.50
B) 6m to 12m below ground level in any length and in dry condition Cu.m 60,108.30 60,108.30
Cu.ft 1,702.08 1,702.08
C) 12m to 50m below ground level in any length and in dry condition Cu.m 72,129.96 72,129.96
Cu.ft 2,042.49 2,042.49
D) 50m to 75m below ground level in any length and in dry condition Cu.m 82,949.45 82,949.45
Cu.ft 2,348.86 2,348.86
E) 75m to 100m below ground level in any length and in dry condition Cu.m 91,244.40 91,244.40
Cu.ft 2,583.75 2,583.75
F)
Above 100m below ground level in any length and to any depth in dry condition Cu.m 95,806.62 95,806.62
Cu.ft 2,712.94 2,712.94
G) Additional for wet conditions for items 3-65 from (A-F) Cu.m 15%
H) Additional for below spring level/in flowing conditions for items 3-65(A-F) Cu.m 25%
I) Additional for Cleaning of Karez silt/debris of any length in the range of depths as
Cu.m 20%
mentioned in items 3-65 from (A-F)
3-66 Cutting to a required gradient in all kinds of soil and disposing the same, levelling,
Cu.m 596.70 596.70
dressing, watering and consolidation lead upto 100ft. (30m).
Cu.ft 16.90 16.90
3-67
Cutting to a required gradient in all kinds of soil and disposing the same, levelling,
Cu.m 538.72 538.72
dressing but without watering and consolidation lead upto 100 ft. (30m)
Cu.ft 15.25 15.25
3-68 Providing turf only Sqm 288.00
Sq.ft - 26.76
3-69
Spraying approved anti-termite chemical mixed with water in the ratio of 1:40 Sqm 14.20 162.69
Sq.ft 1.32 15.11
3-70 (A) Excavation of trenches for water supply pipe lines upto 5 ft. (1.5m) depth from
ground level, including trimming, dressing sides, levelling the beds of trenches to
correct grade and cutting pits for joints, etc. complete in all respects including cost
of back filling.
i) Ordinary soil Cu.m 346.89 346.89
Cu.ft 9.82 9.82
ii) Hard Soil Cu.m 507.00 507.00
Cu.ft 14.36 14.36
iii) Shingle and Gravel Cu.m 643.68 643.68
Cu.ft 18.23 18.23
3-70 (B) Two coats of hot bitumen soaked with hessian cloth, 1.25kg of bitumen per square
Cu.m 290.40 574.50
meter for water supply pipe.
Cu.ft 8.22 16.27
3-71(A) Cutting rock for water supply pipe lines in trenches upto 5 ft. (1.5m) depth from
ground level, including trimming, dressing sides, levelling the beds of trenches to
Cu.m 1,205.52 1,205.52
correct grade and cutting pits for joints, etc. complete in all respects including cost
of back filling. Laying of pipes 1 inch to 12 inch of any kind
Cu.ft 34.14 34.14
3-71(B) Two coats of hot bitumen soaked with hessian cloth, 1.25kg of bitumen per square
Cu.m 290.40 639.00
meter.
Cu.ft 8.22 18.09
3-72 Transportation of earth all types when the total distance including the lead covered (See
Cu.m
in the item of work is more than 250 metres except item No. 3-16(c ) Section-1
3-73 Earthwork excavation in open cutting from 10ft. to 15 ft (3 m to 4.5 m) depth for
storm water channels, drains, sullage drains in open area, roads, streets lanes and
shoring to protect existing works, shuttering and timbering the trenches dressed to
designed level and dimension, trimming from trenches, backfilling and disposal of
surplus excavated material upto 100 ft (30 m) including dressing, excluding removal
of surface water from drains.
A) In ashes, sand, soft soil or silt clearance. Cu.m 123.18 390.17
Cu.ft 3.49 11.05
B) Ordinary soil Cu.m 133.26 483.39
Cu.ft 3.77 13.69
C) Hard soil Cu.m 152.10 589.32
Cu.ft 4.31 16.69
D) Shingle or gravel Cu.m 177.60 702.12
Cu.ft 5.03 19.88

Earth Work (P/12) 12 - 13


Balochistan Composite Shedule of Rates Chapter -3, (Earth Work)
Vol - 1, 2023
SI
Description Units
Labour Composite
3-74 Earthwork excavation in open cutting from 15ft. to 20 ft (4.5 m to 6 m) depth for
storm water channels, drains, sullage drains in open area, roads, streets lanes and
shoring to protect existing works, shuttering and timbering the trenches dressed to
designed level and dimension, trimming from trenches, backfilling and disposal of
surplus excavated material upto 100 ft (30 m) including dressing, excluding removal
of surface water from drains.
A) In ashes, sand, soft soil or silt clearance. Cu.m 156.18 503.64
Cu.ft 4.42 14.26
B) Ordinary soil Cu.m 166.26 569.71
Cu.ft 4.71 16.13
C) Hard soil Cu.m 185.10 701.81
Cu.ft 5.24 19.87
D) Shingle or gravel Cu.m 210.60 814.61
Cu.ft 5.96 23.07
3-75 Sludge removal in drains and disposal with 1 Km Cu.m 70.20 414.53
Cu.ft 1.99 11.74

Earth Work (P/13) 13 - 13