Composite Schedule of Rates
SECTION - 3
EARTH WORK
SI Rate (Rs.)
Description Units
Labour Composite
3-1 Earth work excavation undressed, lead upto a single throw of kassi, phaorah,
shovel.
A) Manual (Maximium Area 250 Sft)
i) In ashes, sand, soft soil or silt clearance. Cu.m 142.80 142.80
Cu.ft 4.04 4.04
ii) In ordinary soil Cu.m 171.36 171.36
Cu.ft 4.85 4.85
iii) In hard soil Cu.m 294.00 294.00
Cu.ft 8.33 8.33
iv) In shingle or gravel Cu.m 588.00 588.00
Cu.ft 16.65 16.65
B) Equiptment
i) In ashes, sand, soft soil or silt clearance. Cu.m 130.83 130.83
Cu.ft 3.70 3.70
ii) In ordinary soil Cu.m 172.70 172.70
Cu.ft 4.89 4.89
iii) In hard soil Cu.m 209.33 209.33
Cu.ft 5.93 5.93
iv) In shingle or gravel Cu.m 261.66 261.66
Cu.ft 7.41 7.41
3-2 Earth work excavation undressed, lead upto 50 ft. (15m.)
A) Manual (Maximium Area 250 Sft)
i) In ashes, sand, soft soil or silt clearance. Cu.m 208.32 208.32
Cu.ft 5.90 5.90
ii) In ordinary soil Cu.m 252.00 252.00
Cu.ft 7.14 7.14
iii) In hard soil Cu.m 352.80 352.80
Cu.ft 9.99 9.99
iv) In shingle or gravel Cu.m 714.00 714.00
Cu.ft 20.22 20.22
B) Mechnical
i) In ashes, sand, soft soil or silt clearance. Cu.m 270.91 270.91
Cu.ft 7.67 7.67
ii) Ordinary soil Cu.m 359.46 359.46
Cu.ft 10.18 10.18
iii) Hard soil Cu.m 442.79 442.79
Cu.ft 12.54 12.54
iv) Shingle or gravel Cu.m 594.14 594.14
Cu.ft 16.82 16.82
3-3 Bed clearance in ordinary soil and dressing slopes of drains to required section
including removal of weeds, roots etc. and disposal of excavated material within 50
ft. (15m) lead.
A) Excavated material undressed Cu.m 265.44 265.44
Cu.ft 7.52 7.52
B) Excavated material dressed in specified manner. Cu.m 285.60 285.60
Cu.ft 8.09 8.09
3-4
Borrow pit excavation depth upto 10 ft. (3 m) undressed lead upto 100 ft. (30m)
A) In ashes, sand, soft soil or silt clearance. Cu.m 317.60 317.60
Cu.ft 8.99 8.99
B) Ordinary soil Cu.m 406.16 406.16
Cu.ft 11.50 11.50
C) Hard soil Cu.m 489.48 489.48
Cu.ft 13.86 13.86
D) Shingle or gravel Cu.m 687.53 687.53
Cu.ft 19.47 19.47
3-5 Earthwork for embankment lead upto 1000 M and compaction by mechanical
means at optimum moisture content, dressing to designed section including laying,
leveling and watering.
A- Sand
i) 95% maximum modified AASHTO dry density Cu.m 8.40 259.03
Cu.ft 0.24 7.33
ii) 90% maximum modified AASHTO dry density Cu.m 8.40 248.80
Cu.ft 0.24 7.05