Construction Civil Works Productivity Rates
Construction Civil Works Productivity Rates
Construction Civil Works Productivity Rates
Construction Productivity Rates are very important to both Site Engineers and Planning
Engineers.
It could be used to monitor labor performance or to
estimate the manpower required for a project for
planning and monitoring purposes or cost estimations.
In this article, I will share with you a civil works
production rates Excel sheet where you can find all the
civil works-related items along with the average
productivity per profession.
Civil works are one of the important trades in any
project. The attached file includes the civil works productivity rates for the following items:
• Formworks
• Block works
• Plaster works
• Tiles work
• Concrete works
• Reinforcement works.
It will give you the standard productivity rates for all of the construction activities with a
high level of detail about every activity.
It also breaks down every activity and its sequence with the standard productivity rate, ex:
Concrete work productivity is starting with formwork, then steel fixing, pouring concrete,
and finally de-shuttering.
These are the productivity rates for all types of Formwork.
Moreover, these are the productivity rates for the Concrete Work.
Furthermore, the productivity rates below are for the Reinforcement and Excavation.
Additionally, these are for the Masonry Work and Plaster Work productivity rates.
Finally, these productivity rates are for Tilling where we mention every detail related to the tilling.
---------------
Useful links:
---------------
Keep in Touch:
WhatsApp: +201277767728
Email: Info@PlanningEngineer.Net
Twitter: https://twitter.com/PlanningEEst
Instagram: https://www.instagram.com/planningengineerest/
TikTok: https://www.tiktok.com/@planningengineerest