This document provides material specifications and general notes for plumbing works. It specifies that all plumbing work must comply with Philippine plumbing codes and regulations. PPR pipes are to be used for cold and hot water lines, PVC pipes for drainage and vent/sewer lines. Slope requirements and pipe sizes are noted. The contractor must verify existing utilities and coordinate sewer line connections.
This document provides material specifications and general notes for plumbing works. It specifies that all plumbing work must comply with Philippine plumbing codes and regulations. PPR pipes are to be used for cold and hot water lines, PVC pipes for drainage and vent/sewer lines. Slope requirements and pipe sizes are noted. The contractor must verify existing utilities and coordinate sewer line connections.
This document provides material specifications and general notes for plumbing works. It specifies that all plumbing work must comply with Philippine plumbing codes and regulations. PPR pipes are to be used for cold and hot water lines, PVC pipes for drainage and vent/sewer lines. Slope requirements and pipe sizes are noted. The contractor must verify existing utilities and coordinate sewer line connections.
1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE EXECUTED OR APPROVED EQUAL. ACCORDING TO THE PROVISIONS OF THE PHILIPPINE PLUMBING DRAINAGE LINES 50Ø TO 100 Ø PVC PIPE CODE, THE NATIONAL BUILDING CODE, AND THE RULES AND SERIES 1000,150 Ø & ABOVE REGULATIONS OF THE CITY. NELTEX PVC PIPE CLASS 34 OR APPROVED EQUAL. VENT / SEWER LINES 50Ø TO 100 Ø NELTEX PVC 2. COORDINATE THE DRAWINGS WITH OTHER RELATED DRAWINGS PIPE SERIES 1000 OR EQUAL AND SPECIFICATIONS THE ENGINEER SHALL BE NOTIFIED DOWNSPOUT 50 Ø TO 100 Ø NELTEX PIPE IMMEDIATELY OF ANY DISCREPANCY FOUND THEREIN. SERIES 1000 OR APPROVED EQUAL. 3. ALL PIPES SHALL BE INSTALLED AS INDICATED, ANY RELOCATION WATER METER TOYO OR ASAHI MODEL OR REQUIRED FOR PROPER EXECUTION OF OTHER TRADE SHALL BE MWSS APPROVED GATE VALVES KITZ, CRANE , PPR GV OR APPROVED EQUAL. WITH PRIOR APPROVAL OF THE ARCHITECT OR ENGINEER. 4 DETAIL OF AIR CHAMBER 4. PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL P 1 Scale NTS LOCATION, DEPTH AND INVERT ELEVATIONS OF EXISTING PIPES AND STRUCTURES AS VERIFIED BY THE CONTRACTOR. 5. ALL SEWER LINES SHALL BE PVC PIPES. 6. ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL MAINTAIN 1% MINIMUM UNLESS OTHERWISE SPECIFIED. 7. SIZE OF WATER SUPPLY PIPES TO FIXTURES SHALL BE IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS. DETAIL OF FLOOR DRAIN 2 DETAIL OF GUTTER DRAIN/ (BASKET STRAINER) P 1 Scale NTS 8. ALL WATER LINES SHALL BE pprc PIPE. 3 P 1 Scale NTS 9. ALL DOWNSPOUT SHALL BE PVC PIPES. 10. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT SITE AND COORDINATE THE WORKS WITH THE SEWER LINES EFFLUENT DISPOSAL AND WATERLINE SERVICES CONNECTION POINT. LEGEND SP SOIL PIPE DP DRAINAGE PIPE FCO FLOOR CLEAN OUT CO CLEAN OUT DS DOWNSPOUT VSTR VENT STACK THRU ROOF 1 DETAIL OF SEPTIC TANK SS SOIL STACK P 1 Scale NTS VS VENT STACK VP VENT PIPE 8 DETAIL OF HOSE BIBB CWL COLD WATER LINE P 1 Scale NTS CWR COLD WATER RISER GV GATE VALVE CV CHECK VALVE HB HOSE BIBB WM WATER METER FD FLOOR DRAIN CB CATCH BASIN WC WATER CLOSET KS KITCHEN SINK LAV LAVATORY F FAUCET FB FOOT BATH GCO GROUND CLEAN OUT WS WASTE STACK SHO SHOWER AD AREA DRAIN 6 DETAIL OF CLEAN-OUT 7 DETAIL OF CATCH BASIN 9 DETAIL OF FCU DRAIN 1 P 1 Scale NTS P 1 Scale NTS P Scale NTS DETAIL OF TRENCHING, 5 BEDDING & BACKFILLING P 1 Scale NTS Drawings and Specifications duly signed, stamped or sealed, as instruments of service are the intellectual properties and documents of the PLUMBING GENERAL NOTES ENGINEER / ARCHITECT , whether DETAIL OF SEPTIC TANK P-1 the object for which they are made is executed or PROPOSED SINGLE STOREY RESIDENTIAL BLDG DETAIL OF FLOOR DRAIN MRS. ALICE EBAL not. It shall be unlawful for any person, without the SANITARY ENGINEER consent of the ENGINEER / ARCHITECT DETAIL OF GUTTER DRAIN or author of said documents, to duplicate or to make copies of said documents for use in the DETAIL OF TRENCHING, BEDDING AND BACKFILLING repetition of and for other projects or buildings, DETAIL OF CLEAN-OUT 12 / 14 whether executed partly or in whole. BRGY. MALABON, CANDELARIA, ZAMBALES DETAIL OF CATCH BASIN DETAIL OF FCU DRAIN