Monthly HSE Inspection May 2023 Rectification List Date: 18/5/2023

No. Photo Description Location Photo After Rectification Action Taken Date Completed

Tower 2
1 No barricade provided
Roof

Tower 2
2 No barricade provided
L35

Tower 2
3 Improper barricade
L33

Tower 2
4 No barricade provided
L33

No placement box
Tower 2
5 provided for fire
L33 near PH
extinguisher

Tower 2
6 No barricade provided
L5

Access obstructed by Tower 2


7
construction waste L5

No insulator hook Tower 2


8
provided & wire on floor L5

Podium 2
9 No barricade provided
L5

Podium 2
10 No barricade provided
L4
No. Photo Description Location Photo After Rectification Action Taken Date Completed

Podium 2
11 No barricade provided
L3

Podium 2
12 No barricade provided
L3

Podium 2
13 Water ponding
L3

Podium 2
14 Water ponding
L1

Podium 2
15 Improper barricade
L2

Water ponding & poor Tower 2


16
housekeeping LG2 near PH

Tower 2
17 Poor housekeeping
GF

Tower 2
Poor housekeeping at
18 LG1 facing
perimeter platform
RD1

Tower 2
Poor housekeeping at
19 LG1 near str
perimeter platform
10

Water ponding & access


Tower 2
20 obstructed by
LG2 str 10
construction waste
No. Photo Description Location Photo After Rectification Action Taken Date Completed

Tower 2
21 Water ponding LG2 near str
10

Tower 1 near
22 Improper safety netting
PH

Tower 2 near
23 Improper safety netting
PH

Tower 1
24 Water ponding
LG2 near PH

Checked by Main-Contractor (SHO): Verified by Resident Engineer: