M/S. Hassan & Brothers

Bill of Quantities

Bill of Quantities

Unit
Unit Price Total Price Total Price
Item Price
Item Measurement
Group Code (if Description of Item Quantity
no. Unit In Words In Figures In Words
any) In figures
(BDT) (BDT) (BDT)
(BDT)

"Site preparation by
manually removing all
miscellaneous objectional
materials from entire site Nine Lakh
and removing soil up to 15 Eighty-One
Thirty point
cm depth including Thousand
1 04-180 04-180 Sqm 32700.000 30.001 Zero Zero 981032.700
uprooting stumps, jungle AND
One
clearing, leveling dressing Thirty-Two
etc. complete as per point Seven
direction of Engineer in
charge.
"

Earth work in excavation of


Fifty-Five
foundation trenches in all
Lakh
kindsofsoils including One
Twenty-Five
leveling, dressing, placing, Hundred and
Thousand Six
2 16-150 16-150 removal of spoils to a safe Cum 31575.000 175.001 Seventy-Five 5525656.575
Hundred and
distance with initial lead of point Zero
Fifty-Six point
30 m and lift of 1.5 m as per Zero One
Five Seven
direction of Engineer in
Five
charge.

Three Lakh
Extra rate for every Seventy-Eight
additional lift of 1.00m or Thousand
Twelve point
part thereof beyond the Nine Hundred
3 16-200 16-200 Plt Cum 31575.000 12.001 Zero Zero 378931.575
initial lift of 1.50m (30 cm and
One
neglected) for all kinds of Thirty-One
earthwork. point Five
Seven Five

Supplying and laying sand


as filter layers as per
specific size ranges and
One Four Lakh
gradation including
Thousand Fifty-Eight
preparation of surface,
Three Thousand
compacting in layer etc.
4 40-650 40-650-30 Cum 336.810 1360.001 Hundred and 458061.937 AND
complete with supply of all
Sixty point Sixty-One
materials and as per
Zero Zero point Nine
direction of Engineer in
One Three Seven
charge.

FM : 1.00 to 1.50

Supplying and placing


non-woven needle punched
type geo-textile fabrics as
filter materials of elongation
at maximum force machine
direction (MD) >=60% and
<= 100%, elongation at
maximum force (CMD) =>
40% and <= 100%, Eight Lakh
horizontal and vertical Eighty-Two
permeability (under 2kn/ m2 Two
Thousand
Hundred
5 40-600 40-600-40 pressure) => 2 × 10E-3 Sqm 4414.500 200.001 882904.415 Nine Hundred
m/Sec. for effective erosion point Zero
and Four
protection in hydraulic Zero One
point Four
structure/river training One Five
works including local
handling, placing in
position, providing machine
seamed joints (with 100%
polypropylene or nylon
thread) or 35 cm. lap in dry
condition or minimum 100
cm. lap under water

1 of 5 26-09-2017 11:52 AM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?...

including protecting the


geo-textile material from UV
ray and from any other
damages including supply
of all materials, labours,
equipments etc. complete
as per direction of Engineer
in charge.

(Geo-textile delivered at
site should be certified by
ISO and clearly labeled with
brand name and grade
printed at regular intervals
across the body of the
fabric).
Mass = > 400 gm/m2,
thickness (Under 2 kpa
pressure) = > 3.00 mm.
EoS<= 0.08 mm, strip
tensile strength =>23 kn/m,
grab strength = >1500N.
CBR puncture resistance=>
3800N.

Supplying and laying dry


1st class or pick jhama
chips as filter in two layers
(top and bottom) as per
specific size, range and Six Lakh
gradation, including Three Nineteen
breaking chips grading Thousand Thousand
preparation of surface, Six Hundred Seven
6 (a) 40-610 40-610-20 Cum 168.410 3680.001 619748.968
compacting each layer etc. and Eighty Hundred and
complete with supply of all point Zero Forty-Eight
materials and as per Zero One point Nine Six
direction of Engineer in Eight
charge.

Well graded between 40


mm to 20mm Size.

Supplying and laying dry


1st class or pick jhama
chips as filter in two layers
(top and bottom) as per
specific size, range and Six Lakh
gradation, including Four Seventy-Eight
breaking chips grading Thousand Thousand Six
6 (b) 40-610 40-610-30 preparation of surface, Cum 168.410 4030.001 AND Thirty 678692.468 Hundred and
compacting each layer etc. point Zero Ninety-Two
complete with supply of all Zero One point Four Six
materials and as per Eight
direction of Engineer in
charge.
Well graded between 20
mm to 5mm Size.

Manufacturing and
supplying C. C. blocks in
leanest mix. 1 : 3 : 6, with
cement, sand (FM>=1.5)
and Stone chips (40 mm
down graded), to attain a
minimum 28 days cylinder
Fourteen
strength of 9.0 N/mn2
Crore
including grading, washing One
Forty-Three
Stone chips, mixing, laying Thousand
Lakh
in forms, consolidation, Two
Eighty-Three
7 (a) 40-140 40-140-25 curing for at least 21 days, Each 116626.000 1238.001 Hundred and 144383104.626
Thousand
including preparation of Thirty-Eight
One Hundred
platform, shuttering and point Zero
and Four
stacking in measurable Zero One
point Six Two
stacks etc. complete
Six
including supply of all
materials (steel shutter to
be used) as per direction of
Engineer in charge.

Block size: 45cm × 45cm ×


45cm.

2 of 5 26-09-2017 11:52 AM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?...

Manufacturing and
supplying C. C. blocks in
leanest mix. 1 : 3 : 6, with
cement, sand (FM>=1.5)
and Stone chips (40 mm
down graded), to attain a
minimum 28 days cylinder
strength of 9.0 N/mn2 Seven Crore
including grading, washing Fifty-Four
Five
Stone chips, mixing, laying Lakh Ten
Hundred and
in forms, consolidation, Thousand
7 (b) 40-140 40-140-45 Each 133469.000 565.001 Sixty-Five 75410118.469
curing for at least 21 days, One Hundred
point Zero
including preparation of and Eighteen
Zero One
platform, shuttering and point Four Six
stacking in measurable Nine
stacks etc. complete
including supply of all
materials (steel shutter to
be used) as per direction of
Engineer in charge.
Block size: 35cm × 35cm ×
35cm.

Manufacturing and
supplying C. C. blocks in
leanest mix. 1 : 3 : 6, with
cement, sand (FM>=1.5)
and Stone chips (40 mm
down graded), to attain a
minimum 28 days cylinder
strength of 9.0 N/mn2
One Crore
including grading, washing
Seven Sixty Lakh
Stone chips, mixing, laying
Hundred and Twenty-Eight
in forms, consolidation,
7 (c) 40-140 40-140-30 Each 20161.000 795.001 Ninety-Five 16028015.161 Thousand
curing for at least 21 days,
point Zero AND Fifteen
including preparation of
Zero One point One Six
platform, shuttering and
One
stacking in measurable
stacks etc. complete
including supply of all
materials (steel shutter to
be used) as per direction of
Engineer in charge.
Block size: 45cm × 45cm ×
30cm.

Labour charge for One Crore


protective works in laying Twenty-One
One
C.C. blocks of different Lakh
Thousand
sizes including preparation Forty-Seven
One
of base, watering and Thousand
8 (a) 40-220 40-220-10 Cum 10544.890 1152.001 Hundred and 12147723.825
ramming or base etc. Seven
Fifty-Two
complete as per direction of Hundred and
point Zero
Engineer in charge. Twenty-Three
Zero One
point Eight
Within 200 m. Two Five

Labour charge for One Crore


protective works in laying Forty-Three
C.C. blocks of different Two Lakh
sizes including preparation Thousand Forty-One
8 (b) 40-220 40-220-20 of base, watering and Cum 7029.920 2040.001 AND Forty 14341043.830 Thousand
ramming or base etc. point Zero AND
complete as per direction of Zero One Forty-Three
Engineer in charge. point Eight
Beyond 200 m. Three

Cement concrete work in


leanest mix. 1:3:6 with sand
of FM>=1.5, in foundation
or floor including breaking,
screening, grading and One Lakh
Eleven
washing aggregates with Sixty-Six
Thousand
clear water, mixing, laying Thousand
Three
Five Hundred
9 28-120 28-120-20 in position, consolidation to Cum 14.710 11320.001 Hundred and 166517.215
levels, curing, including and
Twenty point
supply of all materials, Seventeen
Zero Zero
excluding the cost of point Two
One
formworks etc. as per One Five
direction of the Engineer in
charge.

3 of 5 26-09-2017 11:52 AM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?...

With 25 mm down graded


stone chips.

Back filling of hydraulic


structure including all
leeads and lifts with
Eighty-Seven
selected local soil in layer One
Thousand
of 150 mm including Hundred and
Five Hundred
10 16-530 16-530 watering ramming etc Cum 543.600 161.001 Sixty-One 87520.144
and Twenty
complete (compeact to 50% point Zero
point One
relative density by manual Zero One
Four Four
labour using mallet/ vibro
compactor) as per direction
of engineer in charge.

"Supplying filling and


placing of geo-textile bag of
different size and capacity
(fill Volume and weight
ehen filled with dry sand) at
project/work site including
fabrication and supply of
geo-textile fabric(Mass = >
400 gm/m2) and sewing in
accordance with the
detailed drawing and
technical specification
included the tender
document and schedule of
rates of BWDB, Filling
geo-textile bags of s with
sand (dry) of FM>=0.90
and minimum 90% sand
must be retained on saive Five Crore
no. 100, sewing along one Twenty-One
transverse (Top) side after Lakh
Five
filling sand, stacking in Seventy-Four
Hundred and
measurable/ countable Thousand
11 40-494 40-494-10 Each 98257.000 531.001 Thirty-One 52174565.257
stacks,marking by synthetic Five Hundred
point Zero
enamel paint during and
Zero One
counting and placing of Sixty-Five
geo-bag of different size point Two
including preparation of Five Seven
base and levelling dressing
etc.complete including
higher charge and
mobilization of all
equipment material labour
taxes and mobilization of all
equipment,materials,labour
taxes incidental charge as
per technical
specification,approved
design an direction of
Engineer incharge.
Geo bag ;inner
size;1200mm x 950mm,
outer size;1250mm x
1000mm geo fabric
th=3.00mm,Fil Vol;0.1664
wt;250 kg"

"Earth work by manual


labour with clayey soil
(Minimum 30% clay,0-40%
silt and 0-30% sand) in
construction of cross
bundth/ring bundth as per
design and specification Three Lakh
One
with all lead and lift Thirteen
Hundred and
throwing the earth in layer Thousand
12 16-220 16-220 Cum 2160.000 145.001 Forty-Five 313202.160
not exceding 150 mm in Two Hundred
point Zero
thickness including and Two
Zero One
breaking clods,rough point One Six
drsssing,clearing the jungle
removing stumps dug
bailing and 75 mm
camberingect.complete fas
direction of Engineer
incharge."

4 of 5 26-09-2017 11:52 AM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?...

Earth work by manual


labour in filling
pond/compound etc. with
clayey soil (minimum 30%
clay, 0-40% silt and 0-30%
sand) within the initial lead Five Lakh
of 30m and all lifts including Fifty-Five Ninety-Four
Analyzed Analyzed
13 throwing the spoils to Cum 10800.000 55.001 point Zero 594010.800 Thousand
rate rate
profile in layers not Zero One AND Ten
exceeding 150 mm in point Eight
thickness, clod breaking up
to a maximum size of 100
mm etc. complete as per
direction of Engineer in
charge.

Thirty-Two
Crore
Fifty-One
Lakh Seventy
Grand
325170850.125 Thousand
Total:
Eight
Hundred and
Fifty point
One Two Five

This Bill of Quantities is Electronically Signed by Mr. Sonjoy Saha on behalf of M/S. Hassan & Brothers