Contract No.

RENTAL OF GAS PROCESSING FACILITY 45 MMSCFD


PFE/PGE/2023/019
REV. STATUS
PROCESS REPORT
0 IFI

PROCESS DESIGN BASIS & CRITERIA


DOC NO : CL04-GPNT-PRO-DBD-0001-01
REV :0

PPD-WCP PGE
REV. DATE DESCRIPTION
PREP CHK’D APV’D APV’D APV’D

A 03 Aug 23
© This document is copyright.
No part may be reproduced or used without the written permission of Pema Global Energi
Contract No.
RENTAL OF GAS PROCESSING FACILITY 45 MMSCFD
S143-208-PGE
PROCESS DESIGN BASIS & CRITERIA REV. STATUS
PROCESS
CL04-GPNT-PRO-DBD-0001-01 0 IFI

REVISION HISTORY

Document Control
Rev No. Date Revision Description
Signature

© This document is copyright.


No part may be reproduced or used without the written permission of Pema Global Energi
RENTAL OF GAS PROCESSING FACILITY 45 MMSCFD
PROCESS DESIGN BASIS & CRITERIA

TABLE OF CONTENTS

1 PROJECT DESCRIPTION..............................................................................................3
1.1 Objectives....................................................................................................................3
2 XXXXXXX....................................................................................................................... 3

Document No : CL04-GPNT-PRO-DBD-0001-01 Page 3 of 4


Revision :0
RENTAL OF GAS PROCESSING FACILITY 45 MMSCFD
PROCESS DESIGN BASIS & CRITERIA

1 PROJECT DESCRIPTION

PT. PEMA Global Energi (hereinafter referred to as “COMPANY”) intends to rent Gas
Processing Facility to be installed at Cluster IV and Cluster III area or other area that
determined by COMPANY including its operation and maintenance, in order to substitute
function of treating unit in Point B with regard to maintain the gas production from Arun and
SLS fields, with total of gas capacity of 45 MMSCFD. Rental period for Gas Processing
Facility is for Sixty (60) months of continues operation with requirement equipment’s
availability minimum 95%.

1.1 Objectives

The objectives of this document is to summarize a site visit report conducted on August 3 rd,
2023 between 11.30 am to 13.30 pm at …..

The site visit report in this document summarizes site condition for civil engineering work
purposes for the described project above.

1.2 Referenced Documents

This document refers to:

1. Final Report Soil Investigation (FEED - Doc # AWKB-GENF-CIV-RPT-0001)


First issuance: 27 Nov 2022, Rev 0: 27 Feb 2023
2. Soil Investigation Report (Doc # CL04-GNPT-CIV-RPT-0001-02)
First issuance: 10 Mar 2023, Rev 0: 24 Mar 2023

2 Site Conditions

As per visual observation:

1. Briefly there is a range between low to no concerns of potential technical


complication for civil work executions. This is due to open area nature and sufficient
access and space.

2. Addressing the soil bearing capacity, we refer to documents at 1.2, visual


observations and verbal information from personnel carrying out construction of
foundation of facility nearby the designated location. Up to the survey is conducted,
there are two on-going construction sites of foundation. The two documents above
agree to each other concluding weak soil bearing capacity. Our verbal conversation
with one of the adjacent on-going constructions implies weak soil bearing capacity.

3. Another nearby on-going site is visually observed to have been undergoing a soil
improvement treatment using multiple sub-grade soil material overlays for total
thickness of about 2 meters. The 2m thickness of sub-grade materials is the visible
observation. It is not the true thickness since the overlay process is almost finish.

Document No : CL04-GPNT-PRO-DBD-0001-01 Page 4 of 4


Revision :0
RENTAL OF GAS PROCESSING FACILITY 45 MMSCFD
PROCESS DESIGN BASIS & CRITERIA

Document No : CL04-GPNT-PRO-DBD-0001-01 Page 5 of 4


Revision :0