Professional Documents
Culture Documents
Bijnor 75KL, 12M Typical-1
Bijnor 75KL, 12M Typical-1
BIJNOR
DISTRICT
2
Live Load Gallery = 3 kN/m
2
Live Load on Stair Case = 3 kN/m
Component of tank
Calculation Weight
container
Time Period
The time period(T) of tank is calculated as per IS 1893:2014 (Part-2)
When Tank FULL:
Ti=2Ω(mi+ms/Ks)^0.5 = 3.8 sec
When Tank Empty:
Ti=2Ω(ms/Ks)^0.5 = 2.51 sec
Time period of convection mode, T₁ ,in sec, is given by:
for h/D=0.44 Cc = 3.29
Tc=Cc(D/p)^0.5= 2.36 sec
Hydrodynamic Pressure
Impulsive Hydrodynamic Pressure
Maximum pressure will occur atΦ = 0.
At base of wall, y=0; Qiw (y=0)= 0.701
Impulsive Pressure at the base of wall , Piw(y=0 )= 0.802
No. y/h Y Qiw Piw
1 0 0 0.701 0.802
2 0.1 0.389 0.694 0.794
3 0.2 0.777 0.673 0.770
4 0.3 1.166 0.638 0.730
5 0.4 1.555 0.589 0.673
6 0.5 1.944 0.526 0.601
7 0.6 2.332 0.449 0.513
8 0.7 2.721 0.357 0.409
9 0.8 3.110 0.252 0.289
10 0.9 3.498 0.133 0.152
11 1 3.887 0.000 0.000
For stress analysis of tank wall, Impulsive and Convective pressure on wall is converted to equivalent linear distribution.
Base shear due to impulsive liquid mass per unit circumferential length,
qi=(Ah)i mi g/(∏D/2) 2.08 kN/m
2
ai=qi*(4h-6hi)/(hˆ2) 0.81 kN/m
2
bi=qi(6hi-2h)/(hˆ2) 0.263 kN/m
2
ac=(qc/h^2)(4h-6hc) -0.41 kN/m
2
bc=(qc/h^2)(6hc-2h) 1.97 kN/m
Convective hydrodynamic pressure on the bose slab (y = 0)
x - horizontal distance of a point on bose of tank in the
direction of seismic force, from the centre of tank.
x= D/2 = 2.525 m
Qcb (x)= 0.36
Convective pressure on top of bose slab ( y = 0 )
2
pcb = 1.893 kN/m
Base Moment
Total Base moment, M*=V*hcg 216.29 kN-m
Summary
Filled Case Empty Case
Base Shear 37.497 13.368
Base Moment 621.57 216.29
(1.4) WIND LOAD CALCULATION
Total
Vb Vz pz = 0.6 Vz 2
Height S.No. k1 k2 k3 k4
(m/s) (m/s) (kN/m2)
(m)
4.00 Upto Tie Level 01 47.00 1.07 1.05 1.00 1.00 52.80 1.67
8.00 Upto Tie Level 02 47.00 1.07 1.05 1.00 1.00 52.80 1.67
Upto Tank Bottom
12.00 47.00 1.07 1.07 1.00 1.00 53.61 1.72
Lvl
16.27 Tank Bottom Level 47.00 1.07 1.10 1.00 1.00 55.20 1.83
to Tank Wall Top
Check Adopted
pd
S.No. Kd Ka Kc 0.7pz values of pd
(kN/m2)
(kN/m2) (kN/m2)
Upto Tie Level 01 1.00 1.00 1.00 1.67 1.17 1.67
Cfn FOR INFINITE LENGTH MEMBER = 2.00 (AS PER TABLE 29)
Cf = 1.53
Cfn FOR INFINITE LENGTH MEMBER = 2.00 (AS PER TABLE 29)
Cf = 1.24
Cfn FOR INFINITE LENGTH MEMBER = 2.00 (AS PER TABLE 29)
Cf = 1.24
h/b = 0.85
THEREFORE
Cf = 0.50 (REFER TABLE 25)
Ae pd FORCE
LEVELS Cf
(Sqmt) (kN/m2) (kN)
Since the nominal shear stress is more than shear capacity of the concrete.
Stirrups are to be provided
Diameter of stirrups = 10 mm
Nominal spacing of 2-legged 10 mm dia stirrup required
.=(Asv*0.87fy*d)/Vus 260.847 mm
(0.87x fy x Asv)/0.4b= 405.1 mm
0.75xd 421.5 mm
Provide stirrup ot a spacing of = 200 mm
Provide 2- legged 10 mm striupp at 100 mm spacing.
MATERIAL GRADES
2
Grade of concrete 25 N/mm
2
Grade of steel 500 N/mm
Effective span of beam = 3.535 m
Clear Span of beam = 3.085 m
width of beam,b= 300 mm
Depth of beam,D= 450 mm
Maximum -ve Bending moment/ Support Moment ( From Staad ) = 92 kN-m
Maximum +ve Bending moment/ Mid span Moment ( From Staad ) = 46 kN-m
Maximum shear force, v (from staad)= 67 kN
=(Asv*0.87fy*d)/Vus -1376.0 mm
(0.87x fy x Asv)/0.4b= 302.5 mm
0.75xd= 309 mm
Provide stirrup ot a spacing of = 100 mm
Provide 2- legged 10 mm striupp at 100 mm spacing at supports
2
fck =Characteristic comrepressive strength of concrete. 25 N/mm
fy= yield stress of steel 500 N/mm2
Total height of staging above ground level = 12 m
Depth of foundation below NGL= 2 m
Diameter of column, D= 450 mm
Cover to reinforcement= 40 mm
dia of Bars= 16 mm
d' 48 mm
d' / D= 0.1
(Input From STAAD)
Factored Axial force Pu = 928 kN
Factored moment = 34.5 kN-m
Check for member Size
Pu/fck D2 = 0.183308642
Pt Required = 0.425 %
As per clause 8 of IS:13920-2016 Special confining reinforcement shall be provided over a length Io from each joint face towards
midspan,and on either side of any section.
diameter of ties = 8 mm
spacing of ties required= 140 mm
2
Average Pressure at Outer edge 55.5 kN/m
Using Coefficient of bending and torsional moment for circular beams Maximum negative B.M. 0.0342
Co-eff at support section (k1)
Since the nominal shear stress is more than shear capacity of the concrete.
Stirrups are to be provided
Diameter of stirrups = 10 mm
Nominal spacing of 2-legged 10 mm dia stirrup required
.=(Asv*0.87fy*d)/Vus 321.171 mm
(0.87x fy x Asv)/0.4b= 315.1 mm
0.75xd 369 mm
Provide stirrup ot a spacing of = 100 mm
Provide 2- legged 10 mm striupp at 100 mm spacing.
No Stirrups required
BOARD
FREE
OVERFLOW PIPE
(ABOVE FREE 3. GRADE OF MATERIAL -
(ABOVE FREE
BOARD)
BOARD) 3.1 Y DENOTES TMT HIGH YIELD STRENGTH DEFORMED BARS OF GRADE (FE
500) CONFIRMING TO IS 1786: 2008 WITH ELONGATION MORE THAN 14.5%
MANUFACTURER SHALL SUPPLY THIS SAME.
50
CAPACITY OF TANK 75KL 3.2 P.C.C. AS PER NIT OR MINIMUM M-15 AND 150MM THICK WITH MINIMUM
R35
5050 PROTECTION OF 150MM.
4. DESIGN SBC - 80KN/M2 BELOW 2M DEPTH FROM NATURAL GROUND LEVEL.
AS PER FABRICATOR ASSUMED
5. REFERANCE CODE : IS-456:2000, IS-875 (PART-II):1987, IS-875 (PART-III):2015,
TANK DIA Ø 5.05M IS-1893(PART-I):2016, IS-1893(PART-II):2014, IS-3370 (PART-I):2021,
4270
R1500
EXECUTION SHALL COMMERCE ONLY AFTER APPROVAL FROM SOIL
R2 CONSULTANT AND ENGINEER-IN-CHARGE.
OUTLET PIPE
(ABOVE DEAD 7. CARE SHALL BE TAKEN TO AVOID ACCIDENTAL UPLIFT ON STRUCTURE DURING
FLUSH PIPE STORAGE) CONSTRUCTION. IF GROUND WATER IS ENCOUNTERED DURING EXECUTION
(BOTTOM OF TANK) 450 CONTINUOUS DE-WATERING SHALL BE DONE TO FOUNDATION SYSTEM.
3571
800 800
3571
RL.112.00 DEAD STORAGE EXECUTION SHALL COMMERCE ONLY AFTER APPROVAL FROM
ENGINEER-IN-CHARGE AND SOIL CONSULTANT. KEEP FOUNDATION TRENCH IN
DRY CONDITION TILL IT ACHIEVES ITS FULL STRENGTH.
8. STRUCTURAL DESIGNER HAS NO LEGAL LIABILITY.
RAILING
9. DEVELOPMENT LENGTH -
B1
8.1 IN COLUMN, BEAM AND FOUNDATION = 50 DB
8.2 VERTICAL AND OTHER = 50 DB
10. LD* = LD + 10 DB WHERE DB IS DIAMETER OF BAR.
11. IN CASE OF ANY DISCREPANCY IN THE DRAWING CONTACT STRUCTURAL
1 1 DESIGNER BEFORE EXECUTION.
C1 C1 RB1 12. NOT MORE THAN 50% OF AREA OF STEEL BARS SHALL BE SPLICED AT ANYONE
SECTION.
13. ANCHORAGE OF ZINCLUME WATER TANK SHALL BE CONFIRMED BY TANK
LB1
MANUFACTURES.
14. GRADE OF CONCRETE & CLEAR COVER TO OUTERMOST STEEL
PLAN OF RAFT FOUNDATION PLAN AT WALKWAY LEVEL PLINTH BEAM M25 45MM
FOUNDATION M25 50MM
F.M. CHAMBER
1500x1500x1000
12000
OUTLET
C1 C1 PIPE
2 E.F.M.
MARK SIZE
DRAIN
PIPE DRAIN BRACE BEAM 300X450 PROJECT :
OVERFLOW &
B1 350X600 DESIGNING OF WATER TANK STRUCTURE CONSISTING OF STRUCTURE FRAME AND A PLATE
FORM TO RECEIVE PREFABRICATED ZINC-ALUM WATER TANK AT DISTRICT BIJNOR,
WASHOUT CHAMBER RB1 350X600 UTTAR PRADESH
1500x1500x1000 RB2 450X550 AUTHORITY : SUPERINTENDING ENGINEER
VALVE
1 C1 450 DIA STATE WATER AND SANITATION MISSION
C1 C1 LUCKNOW (UTTAR PRADESH)
INLET LB1 300X450
PIPE
EXECUTING AGENCY : M/S VINDHYA TELELINKS LIMITED
6th floor, Tower-A, Plot No A-3,4,5 Prius
Global, Sec 125 Noida-201301 India
PIPE TO
3571
2000
DRAIN
600
400
(PCC - M:15)
DRAWN BY : CHECKED BY :
ELEVATION SCALE : NTS REV: 01 SIZE : A2
Y10 @ 150MM C/C Y10 @ 150MM C/C NOTES
(HOOP BARS) (HOOP BARS) 1. ALL DIMENSION ARE IN MILLIMETER. ALL LEVELS ARE IN METER.
1000
1000
2. SEISMIC ZONE: III AND BASIC WIND SPEED: 47M/SEC.
Y10 @ 150 C/C 3. GRADE OF MATERIAL -
(RADIAL BARS) 3.1 Y DENOTES TMT HIGH YIELD STRENGTH DEFORMED BARS OF GRADE (FE
500) CONFIRMING TO IS 1786: 2008 WITH ELONGATION MORE THAN 14.5%
MANUFACTURER SHALL SUPPLY THIS SAME.
3.2 P.C.C. AS PER NIT OR MINIMUM M-15 AND 150MM THICK WITH MINIMUM
PROTECTION OF 150MM.
2 2 4. DESIGN SBC - 80KN/M2 BELOW 2M DEPTH FROM NATURAL GROUND LEVEL.
Y10@150MM C/C HOOPS 5. REFERANCE CODE : IS-456:2000, IS-875 (PART-II):1987, IS-875 (PART-III):2015,
B1
B1
500 IS-1893(PART-I):2016, IS-1893(PART-II):2014, IS-3370 (PART-I):2021,
IS-3370 (PART-II):2021, IS-3370 (PART-IV):1967, IS-13920:2016
6. FOUNDATION SHALL REST ON GOOD SOIL. IT SHOULD NOT REST ON BLACK
150
Y10 @ 125MM C/C Y10 @ 125MM C/C COTTON SOIL OR ON SOIL HAVING EXPANSIVE PROPERTIES. AFTER
EXCAVATION UP TO GIVEN DEPTH, SOIL STRATA SHALL BE VERIFIED BY SOIL
(SQUARE MESH) (SQUARE MESH) CONSULTANT AND ENGINEER-IN-CHARGE FOR GIVEN FOUNDATION SYSTEM.
EXECUTION SHALL COMMERCE ONLY AFTER APPROVAL FROM SOIL
3571
3571
Y10 @150C/C RADIAL
EVERY 3rd BAR CHIMTA CONSULTANT AND ENGINEER-IN-CHARGE.
7. CARE SHALL BE TAKEN TO AVOID ACCIDENTAL UPLIFT ON STRUCTURE DURING
1000 CONSTRUCTION. IF GROUND WATER IS ENCOUNTERED DURING EXECUTION
CONTINUOUS DE-WATERING SHALL BE DONE TO FOUNDATION SYSTEM.
EXECUTION SHALL COMMERCE ONLY AFTER APPROVAL FROM
ENGINEER-IN-CHARGE AND SOIL CONSULTANT. KEEP FOUNDATION TRENCH IN
B1 B1 DRY CONDITION TILL IT ACHIEVES ITS FULL STRENGTH.
8. STRUCTURAL DESIGNER HAS NO LEGAL LIABILITY.
9. DEVELOPMENT LENGTH -
1 1 8.1 IN COLUMN, BEAM AND FOUNDATION = 50 DB
R/F DETAILS OF 8.2 VERTICAL AND OTHER = 50 DB
200
200
2L-Y10 @100 c/c
2L-Y10 @150 c/c
400
400
1200 1200
2L-Y10 @ 150 C/C 3-Y16(TH)
2L-Y10 @ 2L-Y10 @
5050 3-Y16(TH.) 3 -Y16(TH.)
2'100 C/C 1' 100 C/C 350 350
3-Y16(TH.)
4 3 3-Y16(TH) 3-Y16(TH.)
200
200
2 - Y12 ON
EACH FACE 4L-Y10 @
400
1200 1200
3-Y16(TH) 100mm c/c PROJECT :
400
4L-Y10 @ 4L-Y10 @ 100 C/C
4L-Y10 @ 2 - Y12 ON 4L-Y10 @ DESIGNING OF WATER TANK STRUCTURE CONSISTING OF STRUCTURE FRAME AND A PLATE
100 C/C 3' EACH FACE FORM TO RECEIVE PREFABRICATED ZINC-ALUM WATER TANK AT DISTRICT BIJNOR,
4'
100 C/C
100mm c/c UTTAR PRADESH
3-Y16(TH.)
RING BEAM (RB1) (350X600) 350
AUTHORITY :
3-Y16(TH.) SECION 4-4' SUPERINTENDING ENGINEER
STATE WATER AND SANITATION MISSION
350
LUCKNOW (UTTAR PRADESH)
SECION 3-3'
EXECUTING AGENCY : M/S VINDHYA TELELINKS LIMITED
6th floor, Tower-A, Plot No A-3,4,5 Prius
Global, Sec 125 Noida-201301 India
6 3-Y12(EX.) 5 3-Y16(TH) 3-Y12(EX.)
M/S IVPS INFRA PVT. LTD.
3-Y16(TH.) 3-Y16(TH.) DESIGN CONSULTANTS : 13/123, MANASH NAGAR, BARA, REWA (M.P.)
WEBSITE : www.ivpsinfra.com
E-MAIL : info@ivpsinfra.com
Tel: +91-129-4011985
3-Y12(EX.) DRAWING :
ALUM ZINK TANK OF CAPACITY 75KL AT 12M STAGING AT DISTRICT BIJNOR, UTTAR
2L-Y10 @
450
PRADESH
450
6' 5' 3-Y12(EX.)
900 3-Y16(TH) 900
150mm c/c
1000 2L-Y10 @ DRAWING NO. IVPS/VTL/BJNR/75KL/12/01DD-R0 (SHEET NO. 2/4)
2L-Y10 @
100 C/C
2L-Y10 @ 150 C/C 2L-Y10 @
100 C/C 500 100mm c/c
LB1 (300X450) 3-Y12(EX.)
BRACE BEAM (300X450) 300
3-Y16(TH.) 300 3-Y16(TH.)
SECION 5-5' SECION 6-6'
DRAWN BY : CHECKED BY :
0
(HOOP BARS) 3.1 Y DENOTES TMT HIGH YIELD STRENGTH DEFORMED BARS OF GRADE (FE
55
600
500) CONFIRMING TO IS 1786: 2008 WITH ELONGATION MORE THAN 14.5%
R3
Y10 @ 125 C/C MANUFACTURER SHALL SUPPLY THIS SAME.
(RADIAL BARS) 2L-Y8 @ 70 3.2 P.C.C. AS PER NIT OR MINIMUM M-15 AND 150MM THICK WITH MINIMUM
Y10 @ 125 C/C C/C PROTECTION OF 150MM.
H/4
C1 C1 4. DESIGN SBC - 80KN/M2 BELOW 2M DEPTH FROM NATURAL GROUND LEVEL.
2 (HOOP BARS) 5. REFERANCE CODE : IS-456:2000, IS-875 (PART-II):1987, IS-875 (PART-III):2015,
0
R2
R150
COTTON SOIL OR ON SOIL HAVING EXPANSIVE PROPERTIES. AFTER
FOUNDATION 2L-Y8 @
140 C/C
EXCAVATION UP TO GIVEN DEPTH, SOIL STRATA SHALL BE VERIFIED BY SOIL
CONSULTANT AND ENGINEER-IN-CHARGE FOR GIVEN FOUNDATION SYSTEM.
(450X550) C1
7. CARE SHALL BE TAKEN TO AVOID ACCIDENTAL UPLIFT ON STRUCTURE DURING
3400
CONSTRUCTION. IF GROUND WATER IS ENCOUNTERED DURING EXECUTION
CONTINUOUS DE-WATERING SHALL BE DONE TO FOUNDATION SYSTEM.
EXECUTION SHALL COMMERCE ONLY AFTER APPROVAL FROM
230 ENGINEER-IN-CHARGE AND SOIL CONSULTANT. KEEP FOUNDATION TRENCH IN
0
DRY CONDITION TILL IT ACHIEVES ITS FULL STRENGTH.
8. STRUCTURAL DESIGNER HAS NO LEGAL LIABILITY.
9. DEVELOPMENT LENGTH -
8.1 IN COLUMN, BEAM AND FOUNDATION = 50 DB
1 8.2 VERTICAL AND OTHER = 50 DB
C1 C1
10. LD* = LD + 10 DB WHERE DB IS DIAMETER OF BAR.
R2525
H/4
11. IN CASE OF ANY DISCREPANCY IN THE DRAWING CONTACT STRUCTURAL
2L-Y8 @ DESIGNER BEFORE EXECUTION.
70 C/C
R1
12. NOT MORE THAN 50% OF AREA OF STEEL BARS SHALL BE SPLICED AT ANYONE
SECTION.
50
450
13. ANCHORAGE OF ZINCLUME WATER TANK SHALL BE CONFIRMED BY TANK
RB2
0
OUTER DIA R35 MANUFACTURES.
50 2L-Y8 @
14. GRADE OF CONCRETE & CLEAR COVER TO OUTERMOST STEEL
70 C/C
H/4
3571
DESCRIPTION CONC. GRADE COVER
A B Y10 @ 125C/C 2050 SLAB M30 30MM
12000
450 450
GL.100.00
PLINTH BEAM M25 45MM
FOUNDATION M25 50MM
3550
2000
4-Y12(TH)
7 8
HOOP 4-Y12(TH.)
HOOP 4-Y12(TH.) 2L-Y8 @
300
H/4
2L-Y8 @
550
550
2 - Y12 ON
550
450
(PCC - M:15)
H/4
@00 C/C SECION 8-8'
@100 C/C @100 C/C
RING BEAM (RB2) (450X550)
450
3550
AUTHORITY : SUPERINTENDING ENGINEER
RB2 (450X550)
2L-Y8 @ STATE WATER AND SANITATION MISSION
140 C/C LUCKNOW (UTTAR PRADESH)
3571
3571
H/4
E-MAIL : info@ivpsinfra.com
2L-Y8 @ Tel: +91-129-4011985
(PCC - M:15)
70 C/C
3571 GL.100.00 DRAWING :
Y10 @ 125 C/C A B ALUM ZINK TANK OF CAPACITY 75KL AT 12M STAGING AT DISTRICT BIJNOR, UTTAR
450
INNER PROJECTION PRADESH
Y10 @ 125 C/C HOOPS RADIAL BARS 3571
OUTER PROJECTION A B
PLINTH BEAM LEVEL DRAWING NO. IVPS/VTL/BJNR/75KL/12/01DD-R0 (SHEET NO. 3/4)
2L-Y8 @
Y10 @125 C/C HOOPS
1400
TYPICAL TIE LEVEL 70 C/C
950
1350
300
COLUMN
(PCC - M:15)
2L-Y8 @ 140 C/C 2L-Y8 @70 C/C 98.000 112.00
TYPICAL COLUMN DETAIL
DRAWN BY : CHECKED BY :
450 SCALE : NTS REV: 01 SIZE : A2
'L' IRON POST NOTES
50x50x6 1. ALL DIMENSION ARE IN MILLIMETER. ALL LEVELS ARE IN METER.
80d 80d 2. SEISMIC ZONE: III AND BASIC WIND SPEED: 47M/SEC.
80d
d
d
80
80
3. GRADE OF MATERIAL -
d
80
BOTTOM ON ALL SIDES
80d
80d
LB1
80d
L CONSULTANT AND ENGINEER-IN-CHARGE FOR GIVEN FOUNDATION SYSTEM.
0.3 EXECUTION SHALL COMMERCE ONLY AFTER APPROVAL FROM SOIL
WIDTH OF STAIRCASE = DETAIL OF DETAIL OF PIPE CONSULTANT AND ENGINEER-IN-CHARGE.
1000MM L
DETAIL OF MANOLE 7. CARE SHALL BE TAKEN TO AVOID ACCIDENTAL UPLIFT ON STRUCTURE DURING
RISER = 150 - 13 NOS. 0.1
5 LATTERN OPENING OPENING CONSTRUCTION. IF GROUND WATER IS ENCOUNTERED DURING EXECUTION
TREAD = 262 - 12 NOS.
OPENING CONTINUOUS DE-WATERING SHALL BE DONE TO FOUNDATION SYSTEM.
EXECUTION SHALL COMMERCE ONLY AFTER APPROVAL FROM
ENGINEER-IN-CHARGE AND SOIL CONSULTANT. KEEP FOUNDATION TRENCH IN
'L' IRON POST 3-Y16(TH.) DRY CONDITION TILL IT ACHIEVES ITS FULL STRENGTH.
50x50x6 3-Y16(TH.) 8. STRUCTURAL DESIGNER HAS NO LEGAL LIABILITY.
2000
125MM THK 9. DEVELOPMENT LENGTH -
WAIST SLAB 3-Y12(EX.) 8.1 IN COLUMN, BEAM AND FOUNDATION = 50 DB
10 9 8.2 VERTICAL AND OTHER = 50 DB
2L-Y10 @
450
DISTRIBUTION BAR 10. LD* = LD + 10 DB WHERE DB IS DIAMETER OF BAR.
8MMØ @100 C/C 2L-Y10 @ 100 C/C 11. IN CASE OF ANY DISCREPANCY IN THE DRAWING CONTACT STRUCTURAL
DESIGNER BEFORE EXECUTION.
L 100 C/C
0.3 12. NOT MORE THAN 50% OF AREA OF STEEL BARS SHALL BE SPLICED AT ANYONE
MAIN BARS SECTION.
13. ANCHORAGE OF ZINCLUME WATER TANK SHALL BE CONFIRMED BY TANK
10MMØ @100 C/C
3-Y12(TH.) MANUFACTURES.
262 10' 1000 9' 300 14. GRADE OF CONCRETE & CLEAR COVER TO OUTERMOST STEEL
150
3150 3-Y12(TH.)
5L LB1
0.1 TYPICAL DETAILS OF STAIRCASE (1M WIDE) 500 DESCRIPTION CONC. GRADE COVER
LB1
SECTION 9-9' SLAB M30 30MM
EXTRA CRANK. TANK BEAM M30 30MM
1000
10MMØ @100C/C TYPICAL DETAILS OF LANDING BEAM TIE BEAM M25 30MM
3-Y16(TH.)
10d OF LINK
50x50x6 ANGLE @
LINK LB1 (300X450) 1000 C/C COLUMN M25 40MM
3-Y12(EX.)
PLINTH BEAM M25 45MM
2L-Y10 @ FOUNDATION M25 50MM
100
450
TYPICAL DETAIL OF 100 C/C
HOOK AT TIE LOCATION 100
PLAN X-X'
3-Y12(TH.)
300
RL - 100.00
LB1
1st LANDING 5th LANDING
- 102.00 START UP - 110.00 START UP
4th LANDING
SECTION 10-10'
- 108.00
2 2
10 hic rea
d he ter
w g
or ve
75 r
m is
m
WIDTH OF STAIRCASE = WIDTH OF STAIRCASE = PROJECT :
X X'
1000MM 1000MM 100 SQ PLATE WITH DESIGNING OF WATER TANK STRUCTURE CONSISTING OF STRUCTURE FRAME AND A PLATE
3571
3571
RISER = 150 - 13 NOS. RISER = 150 - 13 NOS. LEG 10MM Ø ROD FORM TO RECEIVE PREFABRICATED ZINC-ALUM WATER TANK AT DISTRICT BIJNOR,
45° UTTAR PRADESH
TREAD = 262 - 12 NOS. TREAD = 262 - 12 NOS.
DETAIL 'B'
AUTHORITY : SUPERINTENDING ENGINEER
STATE WATER AND SANITATION MISSION
LUCKNOW (UTTAR PRADESH)
100
@ 1000MM C/C Tel: +91-129-4011985
1000 DRAWING :
ALUM ZINK TANK OF CAPACITY 75KL AT 12M STAGING AT DISTRICT BIJNOR, UTTAR
300
PRADESH
2nd LANDING 6th LANDING - 20Ø M.S.
3rd LANDING PIPE RAILING
- 104.00 112.00 DRAWING NO. IVPS/VTL/BJNR/75KL/12/01DD-R0 (SHEET NO. 4/4)
- 106.00
300
3571 3571
300
A B A B DETAIL OF HANDRAIL B
SCALE : NTS
CHECKED BY :
REV: 01 SIZE : A2