STATE WATER AND SANITATION MISSION, UTTAR PRADESH

WATER SUPPLY SCHEME (SOLAR)

UNDER JAL JEEVAN MISSION


DISTRICT - BIJNOR

BIJNOR
DISTRICT

STRUCTURAL DESIGN OF OVERHEAD TANK ( 75 KL AND 12M STAGING )


CONTRACT AGREEMENT NO. : 04/ED/PHASE -3/2021-22 DATED - 7 JAN 2022
NAME OF EXECUTING AGENCY : Vindhya Telelinks Limited - Gaja Engineering Pvt. Ltd. JV
DESIGNED BY : IVPS Infra PVT. LTD.
APPROVED BY: Civil Engineering Department, IIT
DOCUMENT NO: IVPS/VTL/BJNR/75KL/12M/TYP/00DD-R0
(1) LOAD CALCULATION

1.1 DEAD LOAD CALCULATION


(a) Self weight of Tank
Dead weight of structure is applied using 'Self weight command in STAAD

(B) Super imposed dead load :


2
balcony 1 kN/m

(C) Water load:


Water head at base 4.27 m
2
Pressure at bottom of wall= 41.89 kN/m

1.2 LIVE LOAD CALCULATION

2
Live Load Gallery = 3 kN/m
2
Live Load on Stair Case = 3 kN/m

1.3 SEISMIC ANALYSIS OF TANK AND LOAD CALCULATION

Actual capacity of Tank = 82.1 m3


Mass of empty container = 29408.48648 kg
Select Earthquake Zone = III
Select Soil Type = Medium
Grade of Concrete M25
Unit weight of RCC = 25 kN/m3
Unit weight of PCC = 24 kN/m3
Unit weight of Water = 9.81 kN/m3
Density of Water = 1000 Kg/m3

Actual Weight of Zn-Al Tank = 7.19 kN


Total weight of Empty container= 288.50 kN
Height of CG of Empty container above top of circular ring Beam 2.18 m
Staging Height 12 m

Calculation for weight of Staging

Component of tank
Calculation Weight
container

Bottom RC Slab 0.2*25*PI()/4*5.05^2 100.15


Bottom Beams (0.35*0.4)*(5.05*2)*25 35.35
Balcony Slab 0.15*25*PI()/4*(7.05^2-5.05^2) 71.27
Floor finish on balcony PI()/4*(7.05^2-5.05^2)*1 19.01
Bottom Ring Beam PI()*(5.05)*0.35*0.4*25 55.53
Total weight of Columns PI()/4*0.45^2*12*25*4 222.66

Brace Beam 0.3*0.45*3.535*12*25 143.17


Total= 647

Total weight of Empty Container=


Height of CG above Base slab level for empty case = 2.18 m

Total weight of staging= 365.8 kN


Total Mass of staging supporting tank= 37291.3 Kg
Parameters of Spring Mass Model

Maximum Height of Circular Tank(H) 4.27 m


Height of freeboard= 0.383 m
Height of circular tank without freeboard(h)= 3.887 m
Diameter of water tank= 5.05 m
weight of water= 763758.7 N
Total mass of liquid in tank container,m= 77855.1 kg
height/diameter,h/D = 0.770
diameter/height,D/h = 1.299

corresponding to h/D ratio


for h/D=0.44 Kċh/mg = 0.82
for h/D=0.44 mi/m = 0.72
for h/D=0.44 mc/m = 0.30
for h/D=0.44 hi/h = 0.378
for h/D=0.44 hc/h = 0.69
for h/D=0.44 hi*/h = 0.57
for h/D=0.44 hc*/h = 0.73

From the above parameters:


Spring stiffness of convective mode Kc= 147474 N/m
Impulsive mass of liquid, Mi = 56004.5 kg
Convective mass of liquid, Mc = 23103.7 kg
Impulsive Height (Without considering base pressure), hֽ= 1.61 m
Convective Height (Without considering base pressure), hc= 2.93 m
Impulsive Height (Without considering base pressure), hi*= 2.43 m
Convective Height (Without considering base pressure), hc*= 3.11 m
stiffness of staging:
stiffness of staging is calculated from STAAD Model
Diameter of column,D 450 mm
Load applied on staging top 10 kN
Maximum Deflection at Top staging 3.87 mm
Effective stiffness of staging, Ks 2581 kN/m
Effective stiffness of staging, Ks 2581311 N/m
Mass of empty container + One third mass of staging, Ms 41838.9 kg
Total Dead Load of Tank 410.4 KN
Tank is analysed with single degree of freedom with its mass concentrated at CG of tank

Time Period
The time period(T) of tank is calculated as per IS 1893:2014 (Part-2)
When Tank FULL:
Ti=2Ω(mi+ms/Ks)^0.5 = 3.8 sec
When Tank Empty:
Ti=2Ω(ms/Ks)^0.5 = 2.51 sec
Time period of convection mode, T₁ ,in sec, is given by:
for h/D=0.44 Cc = 3.29
Tc=Cc(D/p)^0.5= 2.36 sec

Design Horizontal seismic Coefficient


Design Horizontal seismic Coefficient is given by : Ah=(Z/2)(Sa/g)(I/R)
where, zone factor,Z= 0.24

IS:1893(PART (Table :1,IS 1893 (Part-2) Importance Factor, I= 1.5


2) 2014
(Table :1,IS 1893 (Part-2) Response reduction Factor R = 3

DESIGN HORIZONTAL SEISMIC COEFFICIENT FOR IMPULSIVE MODE,


Time period of impulsive mode when tank full Ti = 3.83 sec
For medium soil soil and 5% damping , correction (Sa/g)i= 0.35
The design horizontal seismic coefficient ,(Ah)i = 0.030
Base shesr Vi=(Ah)i(mi+ms)g= 28795.3 N
DESIGN HORIZONTAL SEISMIC COEFFICIENT FOR CONVECTIVE MODE,
Time period of impulsive mode Tc = 2.4 sec
For medium soil soil and 5% damping , correction (Sa/g)c= 0.577
Multiplication factor for 0.5% damping = 1.75
Sa/g)c for 0.5% Damping = 1.01
the design horizantal seismic coefficient ,(Ah)c = 0.106
Base Shear Vc=(Ah)c Mc g = 24018.5 N
Total base shear at the bottom of staging ,
Total Base shear ,V= (Vi^2+Vc^2)^0.5 37497 N
V= 37.497 kN

Base moment calculation


Overturning moment at the base of stagging in Impulsive mode 470.1 kN-m
Overturning moment at the base of stagging in convective mode 406.6 kN-m
Total overturning moment at the base of stagging 621.57 kN-m

Hydrodynamic Pressure
Impulsive Hydrodynamic Pressure
Maximum pressure will occur atΦ = 0.
At base of wall, y=0; Qiw (y=0)= 0.701
Impulsive Pressure at the base of wall , Piw(y=0 )= 0.802
No. y/h Y Qiw Piw
1 0 0 0.701 0.802
2 0.1 0.389 0.694 0.794
3 0.2 0.777 0.673 0.770
4 0.3 1.166 0.638 0.730
5 0.4 1.555 0.589 0.673
6 0.5 1.944 0.526 0.601
7 0.6 2.332 0.449 0.513
8 0.7 2.721 0.357 0.409
9 0.8 3.110 0.252 0.289
10 0.9 3.498 0.133 0.152
11 1 3.887 0.000 0.000

For stress analysis of tank wall, Impulsive and Convective pressure on wall is converted to equivalent linear distribution.

Base shear due to impulsive liquid mass per unit circumferential length,
qi=(Ah)i mi g/(∏D/2) 2.08 kN/m

Pressure at Bottom and Top is given by:

2
ai=qi*(4h-6hi)/(hˆ2) 0.81 kN/m
2
bi=qi(6hi-2h)/(hˆ2) 0.263 kN/m

impulsive hydrodynamic pressure on the base slab (y=0)


on a strip of length l' is given by:

I' = D/2 - 2.525 m


X = D/2 - 2.525 m

pib= 0.866(Ah)ipghsinh(1.732 x/h)/cosh(0.866 l'/h) 1.289 kN/m2

Convective Hydrodynamic Pressure

Maximum pressure will occur at Ø = 0.


At base of wall, y = 0 : Qcw(y = 0) 0.0663

Convective pressure of the base of wall, Pcw ( y= 0 ) = 0.991 kN/m2

At y =h: Qcw(y=h)= 0.5625


Convective pressure at y= h, p„ ( y = h ) = 8.406 kN/m2

No. Y Y/D Qcw Pcw


1 0 0.00 0.066 0.991
2 0.389 0.08 0.069 1.031
3 0.777 0.15 0.077 1.154
4 1.166 0.23 0.092 1.369
5 1.555 0.31 0.113 1.695
6 1.944 0.38 0.144 2.158
7 2.332 0.46 0.187 2.794
8 2.721 0.54 0.245 3.655
9 3.110 0.62 0.322 4.810
10 3.498 0.69 0.425 6.353
11 3.887 0.77 0.563 8.406
Base shear due to impulsive liquid mass per unit circumferential length,
qc=(Ah)cMcg/(∏ D/2) 3.03 KN/m
Pressure at bottom and Top is given by:

2
ac=(qc/h^2)(4h-6hc) -0.41 kN/m
2
bc=(qc/h^2)(6hc-2h) 1.97 kN/m
Convective hydrodynamic pressure on the bose slab (y = 0)
x - horizontal distance of a point on bose of tank in the
direction of seismic force, from the centre of tank.

x= D/2 = 2.525 m
Qcb (x)= 0.36
Convective pressure on top of bose slab ( y = 0 )
2
pcb = 1.893 kN/m

Pressure Due to wall Inertia


Pressure on wall due to its inertia,
2
Pww=(Ah)i t Pm g = 0.0302 kN/m
This pressure is uniformly distributed along the wall height.

Pressure Due to Vertical Excitation


Hydrodynamic pressure on tank wall due to vertical ground acceleration,
Av=(2/3)(Z/2)(I/R)(Sa/g)
IS: 1893 where, Zone Factor, Z = 0.24
(Part 2) Importonce Factor, I = 1.5
2014 Response reduction Factor R = 3
Time period of verticol mode of vibration , T= 0.3 sec
For Medium soil and 5% damping, corresponding (Sa/g) = 2.5
The design Vertical seismic coefficient, ( Av)= 0.10
2
At the base of wall, i.e., y= 0, Pv= 3.813 kN/m

Maximum Hydrodynamic Pressure on wall


2
p= √((piw +pww)^2 +pcw^2 +pv^2) 9.27 kN/m
2
Hydrostatic pressure under hydrotest condition = 47.40 kN/m
2
Hydrostatic pressure under Working condition = 41.89 kN/m
This maximum hydrodynamic pressure is about 8.764 % of hydrostatic pressure under working condition
of base. Container of tank is designed for hydrotest condition. When earthquake forces ore
consideredpermissible stresses ore increased by 33%. Hence, hydrodynamic pressure in this case does not
affect container design.

Analysis for tank Empty condition

Mass of empty container + (1/3) mass of staging, ms= 41838.9 kg


410.4 kN
Time Period
Time period of empty condition, 2.505 sec
Ti=(2∏)*sqrt(ms/Ks)

Design Horizontal Seismic Coefficient


For medium soil and 5% damping, correction (Sa/g) 0.54
Ah = 0.033
Base Shear
Total base shear, V = Ah ms g = 13.37 kN

Load applied in Each-direction in seismic care under tank Empty condition=

Base Moment
Total Base moment, M*=V*hcg 216.29 kN-m

Summary
Filled Case Empty Case
Base Shear 37.497 13.368
Base Moment 621.57 216.29
(1.4) WIND LOAD CALCULATION

Total Staging Height (From Ground level to Bottom


= 12 m
Beam/Slab of Tank)
Number of Tie levels = 2 Nos.

Height of Tank wall (Including Water depth and Freeboard) = 4.27 m

Diameter of Staging Column = 0.45 m

Span of Outer Tie beam = 3.085 m

Depth of Tie Beam = 0.45 m

Outer Diameter of Tank = 5.05 m

CALCULATION OF DESIGN WIND PRESSURE

Total
Vb Vz pz = 0.6 Vz 2
Height S.No. k1 k2 k3 k4
(m/s) (m/s) (kN/m2)
(m)
4.00 Upto Tie Level 01 47.00 1.07 1.05 1.00 1.00 52.80 1.67

8.00 Upto Tie Level 02 47.00 1.07 1.05 1.00 1.00 52.80 1.67
Upto Tank Bottom
12.00 47.00 1.07 1.07 1.00 1.00 53.61 1.72
Lvl

16.27 Tank Bottom Level 47.00 1.07 1.10 1.00 1.00 55.20 1.83
to Tank Wall Top
Check Adopted
pd
S.No. Kd Ka Kc 0.7pz values of pd
(kN/m2)
(kN/m2) (kN/m2)
Upto Tie Level 01 1.00 1.00 1.00 1.67 1.17 1.67

Upto Tie Level 02 1.00 1.00 1.00 1.67 1.17 1.67


Upto Tank Bottom
1.00 1.00 1.00 1.72 1.21 1.72
Lvl

Tank Bottom Level 1.00 0.90 1.00 1.65 1.28 1.65


to Tank Wall Top

1) WIND FORCE ON STAGING COLUMNS

COLUMN WIDTH b = 0.45 m


TOTAL COLUMN HEIGHT l = 12.00 m

l/b = 26.67 (Cl 7.4.3.2)

Cfn FOR INFINITE LENGTH MEMBER = 2.00 (AS PER TABLE 29)

Cf FOR FINITE LENGTH MEMBER = Cfn * K


K (REDUCTION FACTOR) = 0.77 (AS PER TABLE 28)

Cf = 1.53

Ae (AREA CONSIDERED FOR WIND) = 5.40 m2

WIND FORCE = 14.28 kN

2) WIND FORCE ON TIE BEAMS (Level-01)

BEAM WIDTH/SPAN (b) = 3.09 m


BEAM HEIGHT/DEPTH (l) = 0.45 m

l/b = 0.15 (Cl 7.4.3.2)

Cfn FOR INFINITE LENGTH MEMBER = 2.00 (AS PER TABLE 29)

Cf FOR FINITE LENGTH MEMBER = Cfn * K


K (REDUCTION FACTOR) = 0.62 (AS PER TABLE 28)

Cf = 1.24

Ae (AREA CONSIDERED FOR WIND) = 1.39 m2

WIND FORCE = 2.88 kN

3) WIND FORCE ON TIE BEAMS (Level-02)

BEAM WIDTH/SPAN (b) = 3.09 m


BEAM HEIGHT/DEPTH (l) = 0.45 m

l/b = 0.15 (Cl 7.4.3.2)

Cfn FOR INFINITE LENGTH MEMBER = 2.00 (AS PER TABLE 29)

Cf FOR FINITE LENGTH MEMBER = Cfn * K


K (REDUCTION FACTOR) = 0.62 (AS PER TABLE 28)

Cf = 1.24

Ae (AREA CONSIDERED FOR WIND) = 1.39 m2

WIND FORCE = 2.88 kN


4) WIND FORCE ON TANK WALLS

TANK DIA (b) 5.05 M


TANK WALL HEIGHT (h) 4.27 M
THEREFORE
Vz b = 278.76 > 6

h/b = 0.85

THEREFORE
Cf = 0.50 (REFER TABLE 25)

Ae = 21.56 m2 (Circumference of Tank/2) x Wall Height

WIND FORCE ON WALLS = 17.74 kN

TABLE - SHOWING FORCE ON TANK AT DIFFERENT LEVELS

Ae pd FORCE
LEVELS Cf
(Sqmt) (kN/m2) (kN)

1) WIND FORCE ON STAGING COLUMNS 1.53 5.40 1.72 14.28

2) WIND FORCE ON TIE BEAMS (Level-01) 1.24 1.39 1.67 2.88

3) WIND FORCE ON TIE BEAMS (Level-02) 1.24 1.39 1.67 2.88

4) WIND FORCE ON TANK WALLS 0.50 21.56 1.65 17.74

1) WIND FORCE ON STAGING COLUMNS Force/Height = 1.19 kN/m


2) WIND FORCE ON TIE BEAMS (Level-01) APPLIED IN
Force/Span = 0.93 kN/m
STAAD
3) WIND FORCE ON TIE BEAMS (Level-02) Force/Span = 0.93 kN/m MODEL
4) WIND FORCE ON TANK WALLS Force/Area = 17.74 kN
DESIGN OF THE ALUM-ZINC TANK BASE STRUCTURE OF CAPACITY 75 KL

2 DESIGN OF- TANK CONTAINER


BASIC DESIGN DATA:

Capacity of tank 82.1 m3


stagging Dia 5.05 m
Unit weight of RCC= 25 kN/m3
Unit weight of PCC= 24 kN/m3
Grade of Steel 500 N/mm2
Unit weight of soil= 18 kN/m3
Unit weight of water= 9.81 kN/m3
Unit weight of Zn-AL 63 kN/m3
SBC as per soil report = 80 kN/m2
Depth of foundation as per soil report recommendations = 2 m
Staging Height above FGL = 12 m
Depth of foundation below FGL = 2 m
Number of staging columns = 4 nos.
Height of staging = 12 m
thickness of tank wall= 1.6 mm
height of Zn-AL TANK 4.27 m
MATERIAL GRADES
2
Grade of concrete 30 N/mm
2
Grade of steel 500 N/mm
Design of ZN TANK
Thickness 1.6 mm
height of wall including free board h= 4.27 m
Volume of cylindrical tank (V1) 82.1 m3
check for shear reinforcement in slab due to wall
Shear at bottom 13.67 kN/m2
Hoop Force in Bottom Slab 5.653 kN/m2
100 Ast/bd 0.21 %
Reinforcement Required in Top of Slab 420
Reinforcement Required in Bottom of Slab 420
Diameter of Bar 10
Total Nos required in top of slab 6
Total Nos required in Bottom of slab 6
Provide Hoops of 6-Y1O at Top and Bottom of slab
Design of Balcony
width of balcony= 1000 mm
clear cantilever span= 1000 mm
effective span of cantilever 1000 mm
depth of balcony slab= 150 mm
live load 3 kN/m2
self weight = 3.75 kN/m2
Finishing load = 1 kN/m2
Total load,w= 7.75 kN/m2
Maximum bending moment ,M= WL^2/2= 3.875 kN-m
Shear Force, V = wL = 7.75 kN
Moment, M= 3.875 kN-m
Shear Force, V = 7.75 kN

Design for Bending:

Maximum BM causing tension on span section, M = 5.8125 kN-m/m


Cover to main reinfor cement= 30 mm
Diameter of bar = 10 mm
Effective depth provided ,d 115 mm
R=Mu/bd^2 0.440 mpa
Pt 0.10 %
2
Area of steel required for moment= 118.2 mm
Minimum percentage of steel = 0.28 %
2
Minimum reinforcement required = 420 mm
Required spacing 187.00 mm
Spacing of bar provided = 150 mm
Provide 10 mm diameter bar @ 150mm c/c in Radial on top face of walkway platform
2
Area of steel provided= 523.6 mm
Distibution steel:
diameter of distribution steel= 10 mm
spacing of distribution bar= 150 mm
Provide 10 mm diameter bar @ 150mm c/c in circumferential on top face of walkway platform
Check for shear:
Shear Force, V= 7.75 kN
The nominal shear stress on the section is, tv =V/bd= 0.067 Mpa
Maximum shear stress tcmax = 3.5 Mpa
Hence,Safe
The tension reinforcement available at this section is Ast 523.6 mm2
100Ast/bd = 0.455 %
The allowable shear stress for 0.347 % tension reinforcement is
tc 0.509 Mpa
Since nominal shear stress is less than shear capacity of concrete. Stirrups are not provided.

check for deflection:

Ast required = 118.2 mm2


Ast provided = 523.6 mm2
pt provided = 0.455 %
fs 0.58 x fy x ( Ast req/Ast pro} = 65.48
fig 4, Effective span = 1 m
IS:456- Modification Factor = 2
2000 span / effective depth = 8.7
14
Hence, safe
Design of Bottom Slab :
Ly/Lx = 1
Two way slab
Thicknes of the Slab = 200 mm
Self weight of Slab (wg) - 5 kN/m2
Load due to water = 47.40 kN/m2
Dead load due to screed = 1 kN/m2
Load of finishingr/water proofing, wf= 2 kN/m2
Total load, w = 55.40 kN/m2
Effective span of slab = 2.636 m
Maximum positive Bending Moment 13.473 kN-m
Negative Moment at the Face of Support 18.09 kN-m

Area of steel required on bottom face (mid span):

Maximum BM causing tension on bottom face, M = 20.21 kN-m/m


Diameter of bar provided = 10 mm
Cover to the reinforcement = 30 mm
width of slab = 1000 mm
Effective depth of slab = 165 mm
R=Mu/bd^2 0.74 Mpa
Pt 0.176 %
2
Area of steel required for bending = 290.1 mm
Minimum percentage reqired 0.28 %
2
Minimum reinforcement required= 462 mm /m
Required spacing 170.00 mm
Provide 10 mm dia for steel at a spacing = 125 mm c/c
Provide 10 mm diameter bar @ 125mm c/c on bottom face in both direction
2
Area of steel provided= 628.32 mm
Area of steel required on top face (Support):
Maximum BM causing tension on top face, M 27.139 kN-m/m
Diameter of bar provided = 10 mm
Cover to the reinforcement= 30 mm
Effective depth of slab = 165 mm
R=Mu/bd^2 0.997 Mpa
Pt 0.24 %
2
Area of steel required for bending = 393.8 mm /m
Minimum percentage required 0.28 %
Minimum reinforcement required= 462 mm2/m
Required spacing 170.0 mm
Provide 10 mm dia for steel at a spacing = 125 mm c/c
Provide 10 mm diameter bar @ 125mm c/c on bottom face in both direction
2
Area of steel provided= 628.32 mm

Check for Deflection:


2
Ast required = 290.1 mm
2
Ast provided 628.32 mm
pt provided = 0.381 %
2
fs = 0.58 x fy x ( Ast req/Ast pro) = 133.9 N/mm
Effective span = 2.636 m
fig 4, Modification Factor = 2
IS:456- span / effective depth = 15.98
52
Hence, safe
2.7 Design of Base slab level beams (Main Beam)

Width of beam,b= 350 mm


Depth of beam,D= 600 mm
Taking maximum moment from staad and doing the typical beam design
Maximum -ve Bending moment/ Support Moment ( From Staad ) = 117 kN-m
Maximum +ve Bending moment/ Mid span Moment ( From Staad ) = 52 kN-m
Maximum shear force, v (from staad)= 155 kN
Design for negitive steel (support section):
Maximum BM causing tension on support section, M = 117 kN-m
Cover to main reinforcement = 30 mm
Diameter of bar : 1 = 16 mm
Diameter of bar : 2 = 12 mm
Effective depth provided ,d = 562 mm
Mu/bd2 1.06 N/mm2
percentage of steel required 0.25 %
2
Area of steel required for -ve moment = 533.57 mm /m
minimum percentage of steel= 0.17 %
2
Minimum reinforcement required = 334.39 mm
No of 16 mm dia bars required= 3
2
Area of steel provided = 942.48 mm
Provide 3 Bars of 16 mm Diameter and 3 Bars of 12 mm Diameter in Top

Design for Positive steel {Span section}:


Maximum BM causing tension on span section, M = 52 kN-m
Cover to main reinforcement = 30 mm
Diameter of bar : 1 = 16 mm
Diameter of bar : 2 = 0 mm
Effective depth provided ,d = 562 mm
Mu/bd2 0.47 N/mm2
percentage of steel required 0.11 %
2
Area of steel required for +ve moment = 231.35 mm /m
Minimum percentage of steel= 0.17 %
2
Minimum reinforcement required = 334.39 mm
Area of steel provided = 3
2
Provide 3 Bars of 16 mm Diameter and 3 Bars of 0 mm Diameter in Bottom 603.19 mm

Check for shear:


Maximum Shear Force,V = 155 kN
2
The nominal shear stress on the section is, tv= V/b*d= 0.79 N/mm
Maximum shear stress tcmax = 3.5 N/mm2
Hence, safe
The tension reinforcement available at this section is Ast= 942.48 mm2
I00Ast/bd = 0.48 %

The allowable shear Stress for tension reinforcement is tc= 0.50


Since the nominal shear stress is more than shear capacity of the
concrete. Stirrups are to be provided

Stress borne by concrete due to longitudinal reinforcement 98.35 kN


Balance stress to be taken for shear reinforcement 56.65 kN
Diameter of stirrups = 10 mm
Nominal spacing of 2-legged 10 mm dia stirrup required
.=(Asv*0.87fy*d)/Vus 562.6 mm
(0.87x fy x Asv)/0.4b= 405.10 mm
0.75xd= 421.5 mm
Provide stirrup at a spacing of = 100 mm

Provide 2- legged 10 mm striupp at 100 mm spacing

Check for deflection: L/D = 8.36


26
Hence, safe
2.8 DESIGN OF TOP RING BEAM
Total weight of water = 949.4 kN
Self Weight of Ring Beam = 83.2 kN
Self weight of Zinc Alume Tank = 7.19 kN
Total load when Tank is Full = 1039.8 kN
width of beam,b= 350 mm
Depth of beam,D= 600 mm
Radius of Ring Beam, R 2.525 m
Using Coefficient of bending and torsional moment for circular
beams Maximum negative B.M. Co-eff at support section (k1) 0.0342
Maximum negative moment at supports, K1 Wr R 89.80 kN-m
Ultimate -ve Bending moment/ Support Moment, Mu = 1.5 M 134.7
Maximum negative moment at supports(From Staad) 56
Maximum Design Ultimate -ve Bending moment/ Support Moment, Mu 134.693 kN-m
Maximum negative B.M. Co-eff at mid support section (k2) 0.0176
Maximum negative moment at mid support, K2 Wr R 46.21 kN-m
Ultimate -ve Bending moment at Mid Support, Mu = 1.5 M 69.32
Ultimate -ve Bending moment at Mid Support(From Staad) 20
Design Ultimate -ve Bending moment at Mid Support, Mu 69.32 kN-m
Maximum Torsional Moment. Co-eff at support section (k3) 0.0053 kN-m
Maximum Torsional moment, K3 Wr R 13.92 kN-m
Ultimate Torsional Moment, Tu = 1.5 M 20.87 kN-m
Ultimate Torsional Moment, Tu(From Staad) 12.00 kN-m
Design Ultimate Torsional Moment, Tu = 1.5 M 20.873 kN-m
Maximum shear force
2.8.1 Design for Bending Moment & Shear
Design for negitive steel (support section): 134.693 kN-m
Cover to main reinforcement = 30 mm
Diameter of bar :1 = 16
Diameter of bar : 2 = 0
Effective depth provided ,d 562
P 0.295 %
2
Area of steel required for -ve moment = 579.44 mm /m
Minimum percentage of steel= 0.17 %
2
Minimum reinforcement required - 334.39 mm
No. of bars provided 3
2
Area of steel provided = 603.19 mm
Provide 3 Bars of 16 mm Diameter at Top support
Design for Positive steel {Span section}:
Maximum BM causing tension on span section, Mu = 69.32 kN-m
Cover to main reinforcement = 30 mm
Diameter of bar = 16 mm
Effective depth provided ,d 562 mm
P 0.148 %
2
Area of steel required for -ve moment = 290.714 mm /m
Minimum percentage of steel= 0.17 %
Minimum reinforcement required - 334.39 mm2
No. of bars provided 3
Area of steel provided = 603.19 mm2
Provide 3 Bars of 16 mm Diameter at Mid span
Check for shear :

Maximum shear Force, V = 129.98 kN


Ultimate shear Force, Vu = 194.97 kN
Ultimate shear Force, Vu (From Staad) 87.00 kN
Design Ultimate shear Force, Vu = 194.97 kN
2
The nominal shear stress on the section is, tv= Vu/b*d = 0.991 N/mm
2
Maximum shear stress tc max = 3.5 N/mm
Hence, safe

The tension reinforcement available at this section is


Ast= 603.19 mm2
I00Ast/bd = 0.307
The allowable shear Stress for tension reinforcement is tc= 0.37 Mpa

Since the nominal shear stress is more than shear capacity of the concrete.
Stirrups are to be provided

Stress borne by concrete due to longitudinal reinforcement 72.78 kN


Balance stress to be taken for shear reinforcement 122.191 kN

Diameter of stirrups = 10 mm
Nominal spacing of 2-legged 10 mm dia stirrup required
.=(Asv*0.87fy*d)/Vus 260.847 mm
(0.87x fy x Asv)/0.4b= 405.1 mm
0.75xd 421.5 mm
Provide stirrup ot a spacing of = 200 mm
Provide 2- legged 10 mm striupp at 100 mm spacing.

Design for Torsional Moment & Equivalent Shear

Torsional Moment, Tu(Taken from Staad) 21 kN-m


Shear Force(Vu) 194.97 kN
M = Tu ((1+(D/b))/1.7) 33.33 kN-m
Maximum BM causing tension on support section, M = 168.02 kN-m
Cover to main reinforcement = 30 mm
Diameter of bar = 16 mm
Diameter of bar : 2 = 12 mm
Effective depth provided ,d 562 mm
P 0.373 %
Area of steel required for -ve moment = 732.83 mm2
Minimum percentage of steel = 0.17 %
Minimum reinforcement required - 334.39
No. of bars provided 3
Area of steel provided = 1055.19 mm2

Check for shear :


Maximum shear Force, Ve = Vu + 1.6 X (Tu/B) 290.39 kN
2
The nominal shear stress on the section is, tv= V/b*d = 1.476 N/mm
2
Maximum shear stress tc max = 3.5 N/mm

The tension reinforcement available at this section is


Ast= 1055.19 mm2
I00Ast/bd = 0.536
The allowable shear Stress for tension reinforcement is tc= 0.519
Since the nominal shear stress is more than shear capacity of the concrete.
Stirrups are to be provided
Stress borne by concrete due to longitudinal reinforcement 102.078 kN
Balance stress to be taken for shear reinforcement 188.314 kN
Diameter of stirrups = 10 mm
Nominal spacing of 2-legged 10 mm dia stirrup required
.=(Asv*0.87fy*d)/Vus 169.26 mm
(0.87x fy x Asv)/0.4b= 405.10 mm
0.75xd 421.5 mm
Provide stirrup ot a spacing of = 100 mm
Provide 2- legged 10 mm striupp at 100 mm spacing.
3 DESIGN OF SUPPORTING STRUCTURE

3.1 Design of Brace Beam


Taking maximum moment from staad and doing the typical beam design

MATERIAL GRADES
2
Grade of concrete 25 N/mm
2
Grade of steel 500 N/mm
Effective span of beam = 3.535 m
Clear Span of beam = 3.085 m
width of beam,b= 300 mm
Depth of beam,D= 450 mm
Maximum -ve Bending moment/ Support Moment ( From Staad ) = 92 kN-m
Maximum +ve Bending moment/ Mid span Moment ( From Staad ) = 46 kN-m
Maximum shear force, v (from staad)= 67 kN

Design for negitive steel (support section):


Maximum BM causing tension on support section, M = 92 kN-m
Cover to main reinforcement = 30 mm
Diameter of bar : 1 = 16 mm
Diameter of bar : 2 = 0 mm
Effective depth provided ,d = 412 mm
Mu/bd2 1.807 N/mm2
percentage of steel required 0.457 %
Area of steel required for -ve moment = 565.0 mm2
minimum percentage of steel= 0.17 %
Minimum reinforcement required = 210.12 mm2
No of 16 mm dia bars required= 3 nos
2
Area of steel provided = 603.1872 mm
Provide 3 Bars of 16 mm Diameter

Design for Positive steel {Span section}:


Maximum BM causing tension on span section, Mu = 46 kN-m
Cover to main reinforcement = 30 mm
Diameter of bar : 1 = 16 mm
Diameter of bar : 2 = 0 mm
Effective depth provided ,d = 412 mm
Mu/bd2 0.90 N/mm2
percentage of steel required 0.217 %
Area of steel required for +ve moment = 268.34 mm2
Minimum percentage of steel = 0.17 %
Minimum reinforcement required = 210.12 mm2
No of 16 mm dia bars required= 3 nos
Area of steel provided = 603.19 mm2
Provide 3 Bars of 16 mm Diameter

Check for shear:

Maximum Shear Force,Vu = 67 kN


The nominal shear stress on the section is, tv= Vu/b*d= 0.54 N/mm2
Maximum shear stress tcmax = 3.1 N/mm2

The tension reinforcement available at this section is


2
Ast= 603.19 mm
I00Ast/bd = 0.49 %
The allowable shear Stress for tension reinforcement is 0.63 N/mm2
Since the nominal shear stress is more than shear capacity of the concrete.
Stirrups are to be provided
Stress borne by concrete due to longitudinal reinforcement 77.868 kN
Balance stress to be taken for shear reinforcement -10.868 kN
Diameter of stirrups = 8 mm
Nominal spacing of 2-legged 8 mm dia stirrup required

=(Asv*0.87fy*d)/Vus -1376.0 mm
(0.87x fy x Asv)/0.4b= 302.5 mm
0.75xd= 309 mm
Provide stirrup ot a spacing of = 100 mm
Provide 2- legged 10 mm striupp at 100 mm spacing at supports

Check for deflection:


L/D = 7.86
26
Hence, safe
Design of Columns

2
fck =Characteristic comrepressive strength of concrete. 25 N/mm
fy= yield stress of steel 500 N/mm2
Total height of staging above ground level = 12 m
Depth of foundation below NGL= 2 m
Diameter of column, D= 450 mm
Cover to reinforcement= 40 mm
dia of Bars= 16 mm
d' 48 mm
d' / D= 0.1
(Input From STAAD)
Factored Axial force Pu = 928 kN
Factored moment = 34.5 kN-m
Check for member Size

Dia of the Column = 450 > 20 x Dia of bar= 320 mm

Effective Length of Column = 1500 mm


Length of the beam = Leff < 12 = 3.333333333
D HENCE OK

Check for Limiting Longitudnal Reinforcement


Minm. Reinforcement = 0.80% of Gross Section Area = 1272.348 mm2

Max. Reinforcement = 6% of Gross Section Area = 9542.61 mm2

Column with reinforcement

Pu/fck D2 = 0.183308642

Mu/fck D^3 = 0.015

Refering to Chart-60 From Sp-16

Corresponding Pt/fck = = 0.017

Pt Required = 0.425 %

Area of Steel Required 675.934875 mm2

Ast Required as per STAAD = 665 mm2

Number of Bars provided 7


Area of steel provided 1407.4368

Provide 7 bars of 16 mm diameter


Special confining reinforcement:

As per clause 8 of IS:13920-2016 Special confining reinforcement shall be provided over a length Io from each joint face towards
midspan,and on either side of any section.

Centre to Centre distance between Braces= 3535 mm


Clear distance between Braces = 3085 mm
The length Io shall not be less than:
a) Larger lateral dimension of the member= 450 mm
b) 1/6 of clear span of the member = 514.1666667 mm
c) 450 mm= 450 mm
Hence Confining reinforcement is provided to a height of 450 mm

As per clause 8.1 of IS:13920-2016


Spacing of hoops used as special confining reinforcement shall nod exceed
a) 1/4 of Minimum member dimension 112.5 mm
b) 6 times Diameter of the Smallest Longitudinal Reinforcement Bars 96 mm
c)100mm 100 mm
As per clause 8.1 of IS:13920-2016
Area of cross section of ties required
ASh - Maximum of
Where,
Ash = Area of the bar cross -section.
S = pitch of spiral or spacing of hoops 70
Dk - Diameter of core measured to the outside of the spiral hoop. 386
Ag = Gross area of the column section. 159043 mm2
Ak = Area of the concrete core. 117021.2 mm2
Area required, Ash = (0.09S.Dk.fck/fy(Ag/Ak*1)/0.024 S.Dk.fck/fy 43.66259067 mm2
Area required, Ash = 32.424 mm2
Area required, Ash = 43.66259067 mm2
Diameter of Ties = 8 mm
ASh Provided= 100.5312 mm2
Hence,safe

Provide 8 Dia Ties @ 70 mm c/c in special confined zones

diameter of ties = 8 mm
spacing of ties required= 140 mm

Provide 8 Dia Ties @ 140 mm c/c in other zones


4 Design of Foundation
4.1 Basic Data
Grade of Concrete 25 N/mm2
Grade of Steel 500 N/mm2
3
Unit weight of RCC, Y 25 kN/m
3
Unit weight of Soil, S 18 kN/m
2
Net Bearing Capacity of soil 80 kN/m
Depth of Foundation 2 m
Column Diametre 450 mm
Width of Raft Beam Girder 450 mm
Depth of Ring Beam Girder 550 mm
Inner Projection 0.8 m
Outer Projection 0.8 m
Total strip width, W 2.05 m
Minimum thickness of Raft slab, hd 400 mm
Maximum thickness of Raft slab, Hd 400 mm
Average thickness of Raft slab, H 400 mm
Diameter of C/L Raft 5.05 m
Inner Dia, d 3.00 m
Outer Dia, D 7.10 m
2
Area of the Raft footing Strap, A 32.52 m
4
Moment of Inertia of Footing 120.76 m
3
Section Modulus of Footing I/R, Z 34.02 m

Bearing Capacity Check

Case 1: Tank Full (Working Condition)

Total load at column Base at GL 1430.76 kN


Self Weight of Raft Slab 325.2 kN
Total Dead Load without soil weight, P' 1756.0 kN
2
Pnet = P'/A 54.0 kN/m
2
Net Bearing Capacity of soil, SBC 80 kN/m
Hence,safe

Total Dead Load, P 1805.3 kN


Maximum Base Moment From Earthquake Load under given Condition, M 621.6 kN-m
Maximum Base Moment From Wind Load under given Condition, M 184.0 kN-m
Maximum Base Moment From Earthquake Load under given Condition, M 621.6 kN-m
2
Pmax = P/A + M/Z 73.78 kN/m
2
Pmin = P/A - M/Z 37.2 kN/m
2
Net Bearing Capacity of soil, SBC 80 kN/m
2
Net Bearing Capacity of soil under Earthquake/Wind loading, 1.25 SBC 100 kN/m
Hence,safe

Case 2: Tank Empty (Service Condition)


Total Dead Load incl. water 1805.3 kN
Subtract Load of Water 763.8 kN
Total Dead Load excl. water, P 1041.6 kN
Maximum Base Moment From Earthquake Load under given Condition, M 216.3 kN-m
Maximum Base Moment From Wind Load under given Condition, M 184 kN-m
Maximum Base Moment under given Condition, M 216.3 kN-m
2
Pmax = P/A + M/Z 38.38 kN/m
2
Pmin = P/A - M/Z 25.67 kN/m
2
Net Bearing Capacity of soil 80 kN/m
2
Net Bearing Capacity of soil under earthquake loading, 1.25 SBC 100 kN/m
Hence,safe
Design of Raft Slab
Minimum thickness of Raft Slab at edge, hd 400 mm
Maximum thickness of Raft Slab at Beam edge, Hd 400 mm
Effective span of Slab = 1 m
width of Slab,b= 1000 mm
Depth of Slab at Max. Moment location, D= 400 mm
2
Max. Pressure at Outer Edge (Case 1) 73.78 kN/m
2
Min. Pressure at Outer Edge (Case 1) 37.24 kN/m

2
Average Pressure at Outer edge 55.5 kN/m

Assuming UDL on projected length


2
Max. moment at Strap Edge wl /2 27.8 kN-m
Maximum -ve Bending moment at Support Moment, M' 27.8 kN-m
Max. Shear at face 55.51 kN
Max. Shear at d from face 27.75 kN
Maximum shear force, V 27.75 kN

Design for Moment (support section):

Maximum BM causing tension on support section, M = 1.5X M' 41.63 kN-m


Cover to main reinforcement = 50 mm
Diameter of bar = 10 mm
Effective depth provided ,d 345 mm
P 0.082 %
2
Area of steel required for -ve moment = 282.0 mm /m
Minimum percentage of steel= 0.12 %
2
Minimum reinforcement required - 414 mm /m
Required spacing 189.6 mm
Provide 10 mm dia for steel at a spacing = 125 mm
2
Area of steel provided = 628.32 mm /m

Check for One way shear:


Maximum Shear Force,Vu = 41.6 kN
2
The nominal shear stress on the section is, tv= Vu/b*d= 0.121 N/mm
2
Maximum shear stress tcmax = 3.1 N/mm

The tension reinforcement available at this section is


Ast= 628.32 mm2
I00Ast/bd = 0.18
The allowable shear Stress for tension reinforcement is tc= 0.29
Hence,safe
Design of Strap beam

Total Vertical Force = 1430.8 kN


Self Weight of beam 98.2 kN
Total load on Beam incl. Self Weight 1528.9 kN
Total span of beam = 15.865 m
width of beam,b= 450 mm
Depth of beam,D= 550 mm
Load per m run on girder 90.18 KN/m
Self Weight of beam 6.1875 KN/m
Total load on Beam incl. Self Weight 96.37 KN/m
Mean radius of ring girder, R 2.525 m

Using Coefficient of bending and torsional moment for circular beams Maximum negative B.M. 0.0342
Co-eff at support section (k1)

Maximum negative moment at supports, K1 Wr R 132.03 kN-m


Design Ultimate -ve Bending moment/ Support Moment, Mu = 1.5 M 198.045 kN-m

Maximum negative B.M. Co-eff at mid support section (k2) 0.0176


Maximum negative moment at mid support, K2 Wr R 67.95 kN-m
Design Ultimate -ve Bending moment at Mid Support, Mu = 1.5 M 101.92 kN-m

Maximum Torsional Moment. Co-eff at support section (k3) 0.0053


Maximum Torsional moment, K3 Wr R 20.46 kN-m
Design Ultimate Torsional Moment, Tu = 1.5 M 30.691 kN-m
Annular angle 10 deg.
Column Support Shear due to annular Angle, V = 191.12 kN
Design ultimate shear force at support section Vu = 1.5 V 286.7 kN

Design for Bending Moment & Shear


Design for negitive steel (support section): 198.045 kN-m
Cover to main reinforcement = 50 mm
Diameter of bar :1 = 16
Diameter of bar : 2 = 12
Effective depth provided ,d 492
P 0.460 %
2
Area of steel required for -ve moment = 1019.27 mm /m
Minimum percentage of steel= 0.17 %
2
Minimum reinforcement required - 376.38 mm
No. of bars provided 4
2
Area of steel provided = 1256.64 mm
Provide 4 Bars of 16 mm Diameter and 4 Bars of 12 mm Diameter in Bottom
Design for Positive steel {Span section}:
Maximum BM causing tension on span section, Mu = 101.92 kN-m
Cover to main reinforcement = 50 mm
Diameter of bar = 16 mm
0 mm
Effective depth provided ,d 492 mm
P 0.225 %
2
Area of steel required for -ve moment = 498.705 mm /m
Minimum percentage of steel= 0.17 %
Minimum reinforcement required - 376.38 mm2
No. of bars provided 4
Area of steel provided = 804.25 mm2
Provide 4 Bars of 16 mm Diameter and 4 Bars of 0 mm Diameter in Top
Check for shear :

Maximum shear Force, V = 191.12 kN


Design Ultimate shear Force, Vu = 286.67 kN
2
The nominal shear stress on the section is, tv= Vu/b*d = 1.295 N/mm
2
Maximum shear stress tc max = 3.1 N/mm
Hence, safe

The tension reinforcement available at this section is


Ast= 1256.64 mm2
I00Ast/bd = 0.568
The allowable shear Stress for tension reinforcement is tc= 0.51 Mpa

Since the nominal shear stress is more than shear capacity of the concrete.
Stirrups are to be provided

Stress borne by concrete due to longitudinal reinforcement 112.91 kN


Balance stress to be taken for shear reinforcement 173.759 kN

Diameter of stirrups = 10 mm
Nominal spacing of 2-legged 10 mm dia stirrup required
.=(Asv*0.87fy*d)/Vus 321.171 mm
(0.87x fy x Asv)/0.4b= 315.1 mm
0.75xd 369 mm
Provide stirrup ot a spacing of = 100 mm
Provide 2- legged 10 mm striupp at 100 mm spacing.

Design for Torsional Moment & Equivalent Shear

Torsional Moment, Tu 30.691 kN-m


Shear Force(Vu) 286.67 kN
M = Tu ((1+(D/b))/1.7) 37.79 kN-m
Maximum BM causing tension on support section, M = 235.84 kN-m
Cover to main reinforcement = 50 mm
Diameter of bar = 16 mm
Diameter of bar : 2 = 12 mm
Effective depth provided ,d 492 mm
P 0.561 %
Area of steel required for -ve moment = 1241.17 mm2
Minimum percentage of steel = 0.17 %
Minimum reinforcement required - 2.11191
No. of bars provided 4
Area of steel provided = 1256.64 mm2

Check for shear :


Maximum shear Force, Ve = Vu + 1.6 X (Tu/B) 421.05 kN
2
The nominal shear stress on the section is, tv= V/b*d = 1.902 N/mm
2
Maximum shear stress tc max = 3.1 N/mm

The tension reinforcement available at this section is


Ast= 1256.64 mm2
I00Ast/bd = 0.568
The allowable shear Stress for tension reinforcement is tc= 0.51
Since the nominal shear stress is more than shear capacity of the concrete.
Stirrups are to be provided

Stress borne by concrete due to longitudinal reinforcement 112.914 kN


Balance stress to be taken for shear reinforcement 308.131 kN
Diameter of stirrups = 10 mm
Nominal spacing of 4-legged 10 mm dia stirrup required
.=(Asv*0.87fy*d)/Vus 181.11 mm
(0.87x fy x Asv)/0.4b= 315.08 mm
0.75xd 369 mm
Provide stirrup ot a spacing of = 100 mm
Provide 4- legged 10 mm striupp at 100 mm spacing.
Design of Staircase

Riser of staircase, R = 150 mm


Tread of staircase, T = 262 mm
Width of waist slab= 1000 mm
Width of landing slab = 1000 mm
Number of Tread 12
Number of Riser 13
Grade of Concrete, fck = 25 N/mm2
Grade of steel, fy= 500 N/mm3
Thickness of Waist Slab= 150 mm
Span of Waist slab 3.80 m

Loading Profile for waist slab

seIf weight 4.32 KN/m2


Self weight of RCC step= 2.16 KN/m2
Live Load 3 KN/m2
Floor finish 1.250 KN/m2
Total Dead Load 10.73 KN/m2

Assuming same load on waist slab & Landing

Effective span of slab 3.80 m


Maximum positive Bending Moment at mid span- WL^2/12 12.93 kN/m
Negative Bending Moment at the face of support- WL^2/10 15.52 kN/m

Area of steel required on bottom face (mid span):

Maximum BM causing tension on bottom face, M 19.4 kN-m/m


Cover to main reinfor cement= 30 mm
Diameter of bar = 10 mm
Effective depth provided ,d 115 mm
R=Mu/bd^2 1.467 mpa
Pt 0.36 %
2
Area of steel required for moment= 418.3 mm
Minimum percentage of steel = 0.12 %
2
Minimum reinforcement required = 138 mm
Required spacing 188 mm
Spacing of bar provided = 100 mm
2
Area of steel provided= 785.4 mm
Provide 10 mm diameter bar @ 100 mm c/c

Area of steel required on top face (support):

Maximum BM causing tension on bottom face, M 23.28 kN-m/m


Cover to main reinfor cement= 30 mm
Diameter of bar = 10 mm
Effective depth provided ,d 115 mm
R=Mu/bd^2 1.760 mpa
Pt 0.44 %
2
Area of steel required for moment= 510.8 mm
Minimum percentage of steel = 0.12 %
2
Minimum reinforcement required = 138 mm
Required spacing 153.76 mm
Spacing of bar provided = 100 mm
2
Area of steel provided= 785.4 mm
Provide 10 mm diameter bar @ 100 mm c/c
Check for shear:
Shear Force, V= 20.40 kN
The nominal shear stress on the section is, tv =V/bd= 0.177 Mpa
Maximum shear stress tcmax = 3.1 Mpa
Hence,Safe
The tension reinforcement available at this section is Ast 785.4 mm2
100Ast/bd = 0.683 %
The allowable shear stress for 0.347 % tension reinforcement is
tc 0.548 Mpa
Since nominal shear stress is less than shear capacity of concrete. Stirrups are not provided.

check for deflection:

Ast required = 510.8 mm2


Ast provided = 785.4 mm2
pt provided = 0.683 %
fs 0.58 x fy x ( Ast req/Ast pro} = 188.61
fig 4, Effective span = 3.80 m
Modification Factor(kt) = 1.15
Modification Factor(kC) = 1.15
span / effective depth = 33.1
34.385
Hence, safe

Design of Landing beams (Cantilever Beam)(LB1 & LB2)


Width of beam,b= 300 mm
Depth of beam,D= 450 mm
Taking maximum moment from staad and doing the typical beam design
Maximum -ve Bending moment/ Support Moment ( From Staad ) = 24.5 kN-m
Maximum shear force, v (from staad)= 50 kN
Design for negitive steel (support section):
Maximum BM causing tension on support section, M = 24.5 kN-m
Cover to main reinforcement = 30 mm
Diameter of bar : 1 = 16 mm
Effective depth provided ,d = 412 mm
Mu/bd2 0.48 N/mm2
percentage of steel required 0.11 %
2
Area of steel required for -ve moment = 152.78 mm /m
minimum percentage of steel= 0.17 %
2
Minimum reinforcement required = 229.5 mm
No of 16 mm dia bars required= 3
2
Area of steel provided = 603.19 mm
Provide 3 Bars of 16 mm Diameter in top and bottom

Check for shear:


Maximum Shear Force,V = 50 kN
2
The nominal shear stress on the section is, tv= V/b*d= 0.40 N/mm
Maximum shear stress tcmax = 3.1 N/mm2
Hence, safe
The tension reinforcement available at this section is Ast= 603.19 mm2
I00Ast/bd = 0.49 %

The allowable shear Stress for tension reinforcement is tc= 0.49

No Stirrups required

Check for deflection: L/D = 2.43


7
Hence, safe
1000MM WIDE NOTES
1. ALL DIMENSION ARE IN MILLIMETER. ALL LEVELS ARE IN METER.
INLET PIPE 5050 Ø (C/C)
BALCONY 2. SEISMIC ZONE: III AND BASIC WIND SPEED: 47M/SEC.

BOARD
FREE
OVERFLOW PIPE
(ABOVE FREE 3. GRADE OF MATERIAL -
(ABOVE FREE
BOARD)
BOARD) 3.1 Y DENOTES TMT HIGH YIELD STRENGTH DEFORMED BARS OF GRADE (FE
500) CONFIRMING TO IS 1786: 2008 WITH ELONGATION MORE THAN 14.5%
MANUFACTURER SHALL SUPPLY THIS SAME.

50
CAPACITY OF TANK 75KL 3.2 P.C.C. AS PER NIT OR MINIMUM M-15 AND 150MM THICK WITH MINIMUM

R35
5050 PROTECTION OF 150MM.
4. DESIGN SBC - 80KN/M2 BELOW 2M DEPTH FROM NATURAL GROUND LEVEL.
AS PER FABRICATOR ASSUMED
5. REFERANCE CODE : IS-456:2000, IS-875 (PART-II):1987, IS-875 (PART-III):2015,
TANK DIA Ø 5.05M IS-1893(PART-I):2016, IS-1893(PART-II):2014, IS-3370 (PART-I):2021,
4270

C1 C1 IS-3370 (PART-II):2021, IS-3370 (PART-IV):1967, IS-13920:2016


2 2 6. FOUNDATION SHALL REST ON GOOD SOIL. IT SHOULD NOT REST ON BLACK
COTTON SOIL OR ON SOIL HAVING EXPANSIVE PROPERTIES. AFTER
RAILING RAILING EXCAVATION UP TO GIVEN DEPTH, SOIL STRATA SHALL BE VERIFIED BY SOIL
5 B1 CONSULTANT AND ENGINEER-IN-CHARGE FOR GIVEN FOUNDATION SYSTEM.
52

R1500
EXECUTION SHALL COMMERCE ONLY AFTER APPROVAL FROM SOIL
R2 CONSULTANT AND ENGINEER-IN-CHARGE.
OUTLET PIPE
(ABOVE DEAD 7. CARE SHALL BE TAKEN TO AVOID ACCIDENTAL UPLIFT ON STRUCTURE DURING
FLUSH PIPE STORAGE) CONSTRUCTION. IF GROUND WATER IS ENCOUNTERED DURING EXECUTION
(BOTTOM OF TANK) 450 CONTINUOUS DE-WATERING SHALL BE DONE TO FOUNDATION SYSTEM.

3571
800 800

3571
RL.112.00 DEAD STORAGE EXECUTION SHALL COMMERCE ONLY AFTER APPROVAL FROM
ENGINEER-IN-CHARGE AND SOIL CONSULTANT. KEEP FOUNDATION TRENCH IN
DRY CONDITION TILL IT ACHIEVES ITS FULL STRENGTH.
8. STRUCTURAL DESIGNER HAS NO LEGAL LIABILITY.
RAILING
9. DEVELOPMENT LENGTH -

B1
8.1 IN COLUMN, BEAM AND FOUNDATION = 50 DB
8.2 VERTICAL AND OTHER = 50 DB
10. LD* = LD + 10 DB WHERE DB IS DIAMETER OF BAR.
11. IN CASE OF ANY DISCREPANCY IN THE DRAWING CONTACT STRUCTURAL
1 1 DESIGNER BEFORE EXECUTION.
C1 C1 RB1 12. NOT MORE THAN 50% OF AREA OF STEEL BARS SHALL BE SPLICED AT ANYONE
SECTION.
13. ANCHORAGE OF ZINCLUME WATER TANK SHALL BE CONFIRMED BY TANK

LB1
MANUFACTURES.
14. GRADE OF CONCRETE & CLEAR COVER TO OUTERMOST STEEL

RB1 DESCRIPTION CONC. GRADE COVER


SLAB M30 30MM
3571 3571 TANK BEAM M30 30MM
4th LANDING 4th LANDING TIE BEAM M25 30MM
- 108.00 - 108.00 A B A B COLUMN M25 40MM
LB1 TB1 LB1

PLAN OF RAFT FOUNDATION PLAN AT WALKWAY LEVEL PLINTH BEAM M25 45MM
FOUNDATION M25 50MM

F.M. CHAMBER
1500x1500x1000
12000

OUTLET
C1 C1 PIPE
2 E.F.M.

TB1 SCEDULE OF BEAM & COLUMN SIZE


3571

MARK SIZE
DRAIN
PIPE DRAIN BRACE BEAM 300X450 PROJECT :
OVERFLOW &
B1 350X600 DESIGNING OF WATER TANK STRUCTURE CONSISTING OF STRUCTURE FRAME AND A PLATE
FORM TO RECEIVE PREFABRICATED ZINC-ALUM WATER TANK AT DISTRICT BIJNOR,
WASHOUT CHAMBER RB1 350X600 UTTAR PRADESH
1500x1500x1000 RB2 450X550 AUTHORITY : SUPERINTENDING ENGINEER
VALVE
1 C1 450 DIA STATE WATER AND SANITATION MISSION
C1 C1 LUCKNOW (UTTAR PRADESH)
INLET LB1 300X450
PIPE
EXECUTING AGENCY : M/S VINDHYA TELELINKS LIMITED
6th floor, Tower-A, Plot No A-3,4,5 Prius
Global, Sec 125 Noida-201301 India

VALVE CHAMBER M/S IVPS INFRA PVT. LTD.


DESIGN CONSULTANTS : 13/123, MANASH NAGAR, BARA, REWA (M.P.)
1500x1500x1000 WEBSITE : www.ivpsinfra.com
E-MAIL : info@ivpsinfra.com
3571 Tel: +91-129-4011985
DRAWING :
A B ALUM ZINK TANK OF CAPACITY 75KL AT 12M STAGING AT DISTRICT BIJNOR, UTTAR
PRADESH
LB1 PB1
APPRON SLAB PLAN DRAWING NO. IVPS/VTL/BJNR/75KL/12/01DD-R0 (SHEET NO. 1/4)

PIPE TO
3571
2000

DRAIN
600

400

(PCC - M:15)
DRAWN BY : CHECKED BY :
ELEVATION SCALE : NTS REV: 01 SIZE : A2
Y10 @ 150MM C/C Y10 @ 150MM C/C NOTES
(HOOP BARS) (HOOP BARS) 1. ALL DIMENSION ARE IN MILLIMETER. ALL LEVELS ARE IN METER.

1000

1000
2. SEISMIC ZONE: III AND BASIC WIND SPEED: 47M/SEC.
Y10 @ 150 C/C 3. GRADE OF MATERIAL -
(RADIAL BARS) 3.1 Y DENOTES TMT HIGH YIELD STRENGTH DEFORMED BARS OF GRADE (FE
500) CONFIRMING TO IS 1786: 2008 WITH ELONGATION MORE THAN 14.5%
MANUFACTURER SHALL SUPPLY THIS SAME.
3.2 P.C.C. AS PER NIT OR MINIMUM M-15 AND 150MM THICK WITH MINIMUM
PROTECTION OF 150MM.
2 2 4. DESIGN SBC - 80KN/M2 BELOW 2M DEPTH FROM NATURAL GROUND LEVEL.
Y10@150MM C/C HOOPS 5. REFERANCE CODE : IS-456:2000, IS-875 (PART-II):1987, IS-875 (PART-III):2015,

B1

B1
500 IS-1893(PART-I):2016, IS-1893(PART-II):2014, IS-3370 (PART-I):2021,
IS-3370 (PART-II):2021, IS-3370 (PART-IV):1967, IS-13920:2016
6. FOUNDATION SHALL REST ON GOOD SOIL. IT SHOULD NOT REST ON BLACK

150
Y10 @ 125MM C/C Y10 @ 125MM C/C COTTON SOIL OR ON SOIL HAVING EXPANSIVE PROPERTIES. AFTER
EXCAVATION UP TO GIVEN DEPTH, SOIL STRATA SHALL BE VERIFIED BY SOIL
(SQUARE MESH) (SQUARE MESH) CONSULTANT AND ENGINEER-IN-CHARGE FOR GIVEN FOUNDATION SYSTEM.
EXECUTION SHALL COMMERCE ONLY AFTER APPROVAL FROM SOIL
3571

3571
Y10 @150C/C RADIAL
EVERY 3rd BAR CHIMTA CONSULTANT AND ENGINEER-IN-CHARGE.
7. CARE SHALL BE TAKEN TO AVOID ACCIDENTAL UPLIFT ON STRUCTURE DURING
1000 CONSTRUCTION. IF GROUND WATER IS ENCOUNTERED DURING EXECUTION
CONTINUOUS DE-WATERING SHALL BE DONE TO FOUNDATION SYSTEM.
EXECUTION SHALL COMMERCE ONLY AFTER APPROVAL FROM
ENGINEER-IN-CHARGE AND SOIL CONSULTANT. KEEP FOUNDATION TRENCH IN
B1 B1 DRY CONDITION TILL IT ACHIEVES ITS FULL STRENGTH.
8. STRUCTURAL DESIGNER HAS NO LEGAL LIABILITY.
9. DEVELOPMENT LENGTH -
1 1 8.1 IN COLUMN, BEAM AND FOUNDATION = 50 DB
R/F DETAILS OF 8.2 VERTICAL AND OTHER = 50 DB

BALCONY 10. LD* = LD + 10 DB WHERE DB IS DIAMETER OF BAR.


11. IN CASE OF ANY DISCREPANCY IN THE DRAWING CONTACT STRUCTURAL
DESIGNER BEFORE EXECUTION.
RB1 RB1 12. NOT MORE THAN 50% OF AREA OF STEEL BARS SHALL BE SPLICED AT ANYONE
SECTION.
13. ANCHORAGE OF ZINCLUME WATER TANK SHALL BE CONFIRMED BY TANK
Y10 @ 150MM C/C MANUFACTURES.
(HOOP BARS) 14. GRADE OF CONCRETE & CLEAR COVER TO OUTERMOST STEEL
3571 3571
DESCRIPTION CONC. GRADE COVER
A B A B
SLAB M30 30MM
BOTTOM SLAB DETAIL FOR TANK FLOOR SLAB TOP SLAB DETAIL FOR TANK FLOOR SLAB TANK BEAM M30 30MM
(200 THK,) (200 THK,) TIE BEAM M25 30MM
COLUMN M25 40MM
2 1 3-Y12(EX.) PLINTH BEAM M25 45MM
3-Y12(EX.) 3-Y16(TH) 3-Y16(TH.) 3 -Y16(TH.) FOUNDATION M25 50MM
3 -Y12(EX.)

200

200
2L-Y10 @100 c/c
2L-Y10 @150 c/c

400

400
1200 1200
2L-Y10 @ 150 C/C 3-Y16(TH)
2L-Y10 @ 2L-Y10 @
5050 3-Y16(TH.) 3 -Y16(TH.)
2'100 C/C 1' 100 C/C 350 350

BOTTOM BEAM (B1) (350X600) SECION 1-1' SECION 2-2'

3-Y16(TH.)
4 3 3-Y16(TH) 3-Y16(TH.)

200
200
2 - Y12 ON
EACH FACE 4L-Y10 @

400
1200 1200
3-Y16(TH) 100mm c/c PROJECT :

400
4L-Y10 @ 4L-Y10 @ 100 C/C
4L-Y10 @ 2 - Y12 ON 4L-Y10 @ DESIGNING OF WATER TANK STRUCTURE CONSISTING OF STRUCTURE FRAME AND A PLATE
100 C/C 3' EACH FACE FORM TO RECEIVE PREFABRICATED ZINC-ALUM WATER TANK AT DISTRICT BIJNOR,
4'
100 C/C
100mm c/c UTTAR PRADESH
3-Y16(TH.)
RING BEAM (RB1) (350X600) 350
AUTHORITY :
3-Y16(TH.) SECION 4-4' SUPERINTENDING ENGINEER
STATE WATER AND SANITATION MISSION
350
LUCKNOW (UTTAR PRADESH)
SECION 3-3'
EXECUTING AGENCY : M/S VINDHYA TELELINKS LIMITED
6th floor, Tower-A, Plot No A-3,4,5 Prius
Global, Sec 125 Noida-201301 India
6 3-Y12(EX.) 5 3-Y16(TH) 3-Y12(EX.)
M/S IVPS INFRA PVT. LTD.
3-Y16(TH.) 3-Y16(TH.) DESIGN CONSULTANTS : 13/123, MANASH NAGAR, BARA, REWA (M.P.)
WEBSITE : www.ivpsinfra.com
E-MAIL : info@ivpsinfra.com
Tel: +91-129-4011985
3-Y12(EX.) DRAWING :
ALUM ZINK TANK OF CAPACITY 75KL AT 12M STAGING AT DISTRICT BIJNOR, UTTAR
2L-Y10 @
450

PRADESH

450
6' 5' 3-Y12(EX.)
900 3-Y16(TH) 900
150mm c/c
1000 2L-Y10 @ DRAWING NO. IVPS/VTL/BJNR/75KL/12/01DD-R0 (SHEET NO. 2/4)
2L-Y10 @
100 C/C
2L-Y10 @ 150 C/C 2L-Y10 @
100 C/C 500 100mm c/c
LB1 (300X450) 3-Y12(EX.)
BRACE BEAM (300X450) 300
3-Y16(TH.) 300 3-Y16(TH.)
SECION 5-5' SECION 6-6'
DRAWN BY : CHECKED BY :

SCALE : NTS REV: 01 SIZE : A2


NOTES
4-Y16 RL.112.00
1.
2.
ALL DIMENSION ARE IN MILLIMETER. ALL LEVELS ARE IN METER.
SEISMIC ZONE: III AND BASIC WIND SPEED: 47M/SEC.
Y10 @ 125 C/C 3. GRADE OF MATERIAL -
(HOOP BARS)

0
(HOOP BARS) 3.1 Y DENOTES TMT HIGH YIELD STRENGTH DEFORMED BARS OF GRADE (FE

55

600
500) CONFIRMING TO IS 1786: 2008 WITH ELONGATION MORE THAN 14.5%

R3
Y10 @ 125 C/C MANUFACTURER SHALL SUPPLY THIS SAME.
(RADIAL BARS) 2L-Y8 @ 70 3.2 P.C.C. AS PER NIT OR MINIMUM M-15 AND 150MM THICK WITH MINIMUM
Y10 @ 125 C/C C/C PROTECTION OF 150MM.

H/4
C1 C1 4. DESIGN SBC - 80KN/M2 BELOW 2M DEPTH FROM NATURAL GROUND LEVEL.
2 (HOOP BARS) 5. REFERANCE CODE : IS-456:2000, IS-875 (PART-II):1987, IS-875 (PART-III):2015,

ZONE ( ONLY 50% OF BARS SHALL


IS-1893(PART-I):2016, IS-1893(PART-II):2014, IS-3370 (PART-I):2021,

BARS LAPPED ONLY IN LAPPING

BE LAPPED AT ONE LOCATION)


LAPPING OF BAR/ ADDITIONAL
IS-3370 (PART-II):2021, IS-3370 (PART-IV):1967, IS-13920:2016
5 6. FOUNDATION SHALL REST ON GOOD SOIL. IT SHOULD NOT REST ON BLACK
52

0
R2

R150
COTTON SOIL OR ON SOIL HAVING EXPANSIVE PROPERTIES. AFTER
FOUNDATION 2L-Y8 @
140 C/C
EXCAVATION UP TO GIVEN DEPTH, SOIL STRATA SHALL BE VERIFIED BY SOIL
CONSULTANT AND ENGINEER-IN-CHARGE FOR GIVEN FOUNDATION SYSTEM.

H/2 (LAPPING ZONE)


800 500 800 RING BEAM EXECUTION SHALL COMMERCE ONLY AFTER APPROVAL FROM SOIL
CONSULTANT AND ENGINEER-IN-CHARGE.
3571

(450X550) C1
7. CARE SHALL BE TAKEN TO AVOID ACCIDENTAL UPLIFT ON STRUCTURE DURING

3400
CONSTRUCTION. IF GROUND WATER IS ENCOUNTERED DURING EXECUTION
CONTINUOUS DE-WATERING SHALL BE DONE TO FOUNDATION SYSTEM.
EXECUTION SHALL COMMERCE ONLY AFTER APPROVAL FROM
230 ENGINEER-IN-CHARGE AND SOIL CONSULTANT. KEEP FOUNDATION TRENCH IN
0
DRY CONDITION TILL IT ACHIEVES ITS FULL STRENGTH.
8. STRUCTURAL DESIGNER HAS NO LEGAL LIABILITY.
9. DEVELOPMENT LENGTH -
8.1 IN COLUMN, BEAM AND FOUNDATION = 50 DB
1 8.2 VERTICAL AND OTHER = 50 DB
C1 C1
10. LD* = LD + 10 DB WHERE DB IS DIAMETER OF BAR.

R2525

H/4
11. IN CASE OF ANY DISCREPANCY IN THE DRAWING CONTACT STRUCTURAL
2L-Y8 @ DESIGNER BEFORE EXECUTION.
70 C/C

R1
12. NOT MORE THAN 50% OF AREA OF STEEL BARS SHALL BE SPLICED AT ANYONE
SECTION.

50

450
13. ANCHORAGE OF ZINCLUME WATER TANK SHALL BE CONFIRMED BY TANK
RB2

0
OUTER DIA R35 MANUFACTURES.
50 2L-Y8 @
14. GRADE OF CONCRETE & CLEAR COVER TO OUTERMOST STEEL

70 C/C

H/4
3571
DESCRIPTION CONC. GRADE COVER
A B Y10 @ 125C/C 2050 SLAB M30 30MM

ZONE ( ONLY 50% OF BARS SHALL


BARS LAPPED ONLY IN LAPPING

BE LAPPED AT ONE LOCATION)


LAPPING OF BAR/ ADDITIONAL
R/F DETAILS OF RAFT FOUNDATION (RADIAL BARS) 800 450 800 TANK BEAM M30 30MM
2L-Y8 @
TIE BEAM M25 30MM
R/F DETAILS OF RAFT FOUNDATION 140 C/C

H/2 (LAPPING ZONE)


COLUMN M25 40MM

12000
450 450
GL.100.00
PLINTH BEAM M25 45MM
FOUNDATION M25 50MM

3550
2000

4-Y12(TH)
7 8
HOOP 4-Y12(TH.)
HOOP 4-Y12(TH.) 2L-Y8 @
300

450 450 140 C/C

H/4
2L-Y8 @
550

2L - Y10 @100 c/c 70 C/C


300 300 300 300 2 - Y12 ON

550
2 - Y12 ON
550

2LY-10 @100 c/c


EACH FACE
EACH FACE

450
(PCC - M:15)

7' 8' 4-Y16(TH)


HOOP 4-Y16(TH.)
1200 2L-Y10 1200 HOOP 4-Y16(TH.) 2L-Y8 @
2L-Y10 2L-Y10 SECION 7-7' 70 C/C

H/4
@00 C/C SECION 8-8'
@100 C/C @100 C/C
RING BEAM (RB2) (450X550)
450

ZONE ( ONLY 50% OF BARS SHALL


BARS LAPPED ONLY IN LAPPING

BE LAPPED AT ONE LOCATION)


LAPPING OF BAR/ ADDITIONAL

H/2 (LAPPING ZONE)


PROJECT :
DESIGNING OF WATER TANK STRUCTURE CONSISTING OF STRUCTURE FRAME AND A PLATE
2 2 FORM TO RECEIVE PREFABRICATED ZINC-ALUM WATER TANK AT DISTRICT BIJNOR,
UTTAR PRADESH

3550
AUTHORITY : SUPERINTENDING ENGINEER
RB2 (450X550)
2L-Y8 @ STATE WATER AND SANITATION MISSION
140 C/C LUCKNOW (UTTAR PRADESH)
3571

3571

Y10 @ 150 C/C EXECUTING AGENCY :


Y10 @ 150 C/C M/S VINDHYA TELELINKS LIMITED
RADIAL BARS 6th floor, Tower-A, Plot No A-3,4,5 Prius
RADIAL BARS
800 800 Global, Sec 125 Noida-201301 India
300

M/S IVPS INFRA PVT. LTD.


DESIGN CONSULTANTS : 13/123, MANASH NAGAR, BARA, REWA (M.P.)
400

300 300 1 1 WEBSITE : www.ivpsinfra.com

H/4
E-MAIL : info@ivpsinfra.com
2L-Y8 @ Tel: +91-129-4011985
(PCC - M:15)
70 C/C
3571 GL.100.00 DRAWING :
Y10 @ 125 C/C A B ALUM ZINK TANK OF CAPACITY 75KL AT 12M STAGING AT DISTRICT BIJNOR, UTTAR

450
INNER PROJECTION PRADESH
Y10 @ 125 C/C HOOPS RADIAL BARS 3571
OUTER PROJECTION A B
PLINTH BEAM LEVEL DRAWING NO. IVPS/VTL/BJNR/75KL/12/01DD-R0 (SHEET NO. 3/4)
2L-Y8 @
Y10 @125 C/C HOOPS

1400
TYPICAL TIE LEVEL 70 C/C

950
1350

TYPE COLUMN TIES RB2 (450x550)

R/F COLUMN DETAIL 7-Y16


AT CENTRE AT JUNCTION
STARTING LEVEL ENDING LEVEL
800 800

300
COLUMN
(PCC - M:15)
2L-Y8 @ 140 C/C 2L-Y8 @70 C/C 98.000 112.00
TYPICAL COLUMN DETAIL
DRAWN BY : CHECKED BY :
450 SCALE : NTS REV: 01 SIZE : A2
'L' IRON POST NOTES
50x50x6 1. ALL DIMENSION ARE IN MILLIMETER. ALL LEVELS ARE IN METER.
80d 80d 2. SEISMIC ZONE: III AND BASIC WIND SPEED: 47M/SEC.
80d

d
d

80
80
3. GRADE OF MATERIAL -

d
80
BOTTOM ON ALL SIDES

BOTTOM ON ALL SIDES


3.1 Y DENOTES TMT HIGH YIELD STRENGTH DEFORMED BARS OF GRADE (FE

BOTTOM ON ALL SIDES


500) CONFIRMING TO IS 1786: 2008 WITH ELONGATION MORE THAN 14.5%

2-Y12 AT TOP AND

2-Y12 AT TOP AND

2-Y12 AT TOP AND


MANUFACTURER SHALL SUPPLY THIS SAME.
3.2 P.C.C. AS PER NIT OR MINIMUM M-15 AND 150MM THICK WITH MINIMUM
PROTECTION OF 150MM.
EXTRA CRANK. OPENING DIA OF PIPES 4. DESIGN SBC - 80KN/M2 BELOW 2M DEPTH FROM NATURAL GROUND LEVEL.
MANHOLE
10MMØ @100 C/C 5. REFERANCE CODE : IS-456:2000, IS-875 (PART-II):1987, IS-875 (PART-III):2015,
800x800
IS-1893(PART-I):2016, IS-1893(PART-II):2014, IS-3370 (PART-I):2021,
20Ø M.S.
IS-3370 (PART-II):2021, IS-3370 (PART-IV):1967, IS-13920:2016
PIPE RAILING 1000 6. FOUNDATION SHALL REST ON GOOD SOIL. IT SHOULD NOT REST ON BLACK
COTTON SOIL OR ON SOIL HAVING EXPANSIVE PROPERTIES. AFTER
EXCAVATION UP TO GIVEN DEPTH, SOIL STRATA SHALL BE VERIFIED BY SOIL

80d

80d
LB1

80d
L CONSULTANT AND ENGINEER-IN-CHARGE FOR GIVEN FOUNDATION SYSTEM.
0.3 EXECUTION SHALL COMMERCE ONLY AFTER APPROVAL FROM SOIL
WIDTH OF STAIRCASE = DETAIL OF DETAIL OF PIPE CONSULTANT AND ENGINEER-IN-CHARGE.
1000MM L
DETAIL OF MANOLE 7. CARE SHALL BE TAKEN TO AVOID ACCIDENTAL UPLIFT ON STRUCTURE DURING
RISER = 150 - 13 NOS. 0.1
5 LATTERN OPENING OPENING CONSTRUCTION. IF GROUND WATER IS ENCOUNTERED DURING EXECUTION
TREAD = 262 - 12 NOS.
OPENING CONTINUOUS DE-WATERING SHALL BE DONE TO FOUNDATION SYSTEM.
EXECUTION SHALL COMMERCE ONLY AFTER APPROVAL FROM
ENGINEER-IN-CHARGE AND SOIL CONSULTANT. KEEP FOUNDATION TRENCH IN
'L' IRON POST 3-Y16(TH.) DRY CONDITION TILL IT ACHIEVES ITS FULL STRENGTH.
50x50x6 3-Y16(TH.) 8. STRUCTURAL DESIGNER HAS NO LEGAL LIABILITY.

2000
125MM THK 9. DEVELOPMENT LENGTH -
WAIST SLAB 3-Y12(EX.) 8.1 IN COLUMN, BEAM AND FOUNDATION = 50 DB
10 9 8.2 VERTICAL AND OTHER = 50 DB
2L-Y10 @

450
DISTRIBUTION BAR 10. LD* = LD + 10 DB WHERE DB IS DIAMETER OF BAR.
8MMØ @100 C/C 2L-Y10 @ 100 C/C 11. IN CASE OF ANY DISCREPANCY IN THE DRAWING CONTACT STRUCTURAL
DESIGNER BEFORE EXECUTION.
L 100 C/C
0.3 12. NOT MORE THAN 50% OF AREA OF STEEL BARS SHALL BE SPLICED AT ANYONE
MAIN BARS SECTION.
13. ANCHORAGE OF ZINCLUME WATER TANK SHALL BE CONFIRMED BY TANK
10MMØ @100 C/C
3-Y12(TH.) MANUFACTURES.
262 10' 1000 9' 300 14. GRADE OF CONCRETE & CLEAR COVER TO OUTERMOST STEEL
150

3150 3-Y12(TH.)
5L LB1
0.1 TYPICAL DETAILS OF STAIRCASE (1M WIDE) 500 DESCRIPTION CONC. GRADE COVER
LB1
SECTION 9-9' SLAB M30 30MM
EXTRA CRANK. TANK BEAM M30 30MM
1000
10MMØ @100C/C TYPICAL DETAILS OF LANDING BEAM TIE BEAM M25 30MM
3-Y16(TH.)

10d OF LINK
50x50x6 ANGLE @
LINK LB1 (300X450) 1000 C/C COLUMN M25 40MM
3-Y12(EX.)
PLINTH BEAM M25 45MM
2L-Y10 @ FOUNDATION M25 50MM

100

450
TYPICAL DETAIL OF 100 C/C
HOOK AT TIE LOCATION 100
PLAN X-X'
3-Y12(TH.)
300
RL - 100.00

LB1
1st LANDING 5th LANDING
- 102.00 START UP - 110.00 START UP
4th LANDING
SECTION 10-10'
- 108.00

2 2

10 hic rea
d he ter
w g

or ve
75 r
m is
m
WIDTH OF STAIRCASE = WIDTH OF STAIRCASE = PROJECT :
X X'
1000MM 1000MM 100 SQ PLATE WITH DESIGNING OF WATER TANK STRUCTURE CONSISTING OF STRUCTURE FRAME AND A PLATE
3571

3571

RISER = 150 - 13 NOS. RISER = 150 - 13 NOS. LEG 10MM Ø ROD FORM TO RECEIVE PREFABRICATED ZINC-ALUM WATER TANK AT DISTRICT BIJNOR,
45° UTTAR PRADESH
TREAD = 262 - 12 NOS. TREAD = 262 - 12 NOS.
DETAIL 'B'
AUTHORITY : SUPERINTENDING ENGINEER
STATE WATER AND SANITATION MISSION
LUCKNOW (UTTAR PRADESH)

TYPICAL DETAIL OF EXECUTING AGENCY : M/S VINDHYA TELELINKS LIMITED


CLOSED STIRRUP 6th floor, Tower-A, Plot No A-3,4,5 Prius
Global, Sec 125 Noida-201301 India
M/S IVPS INFRA PVT. LTD.
DESIGN CONSULTANTS : 13/123, MANASH NAGAR, BARA, REWA (M.P.)
1 1 'L' IRON POST 50x50x6
WEBSITE : www.ivpsinfra.com
E-MAIL : info@ivpsinfra.com

100
@ 1000MM C/C Tel: +91-129-4011985
1000 DRAWING :
ALUM ZINK TANK OF CAPACITY 75KL AT 12M STAGING AT DISTRICT BIJNOR, UTTAR

300
PRADESH
2nd LANDING 6th LANDING - 20Ø M.S.
3rd LANDING PIPE RAILING
- 104.00 112.00 DRAWING NO. IVPS/VTL/BJNR/75KL/12/01DD-R0 (SHEET NO. 4/4)
- 106.00

300
3571 3571

300
A B A B DETAIL OF HANDRAIL B

TYPICAL STAIRCASE PLAN TYPICAL STAIRCASE PLAN DRAWN BY :

SCALE : NTS
CHECKED BY :

REV: 01 SIZE : A2