UNIT DATA:
Horsepower 300 KW Hz 60
Type Belt Drive Motor RPM 885
Make TMA Electric Drive End
Voltage 3,300 VAC Non Drive End
Phase 3 SN
BEFORE SERVICING
I. Megger/Polarization Index (Before Re-insulation) Date: August 21, 2023
A. Instrument Used: 250V/500/1000V YOKOGAWA
Specimen Impressed Voltage 1 Minute 10 Minutes Remarks
Stator 1000 VDC 2.2 GΩ 5.5 GΩ PI is 2.5 - Fair
Rotor 1000 VDC 1.8 GΩ 5.5 GΩ PI is 3.05 - Fair
10 minutes reading
Guide 1.
1 minutes reading
2. Table of Evaluation:
Dangerous ……………………Less than 1.0
Poor ………………………….1.0 – 1.1
Questionable …………………1.1 – 1.25
Fair ..........................................1.25 – 2.0
Good ........................................More than 2.0
AFTER SERVICING
I. Megger/Polarization Index (Before Re-insulation) Date: August 21, 2023
A. Instrument Used: 250V/500/1000V YOKOGAWA
Specimen Impressed Voltage 1 minute 10 Minutes Remarks
Stator 1000 GΩ 2.2 GΩ 5.50 GΩ Infinity
Rotor 1000 MΩ 1.8 GΩ 5.50 GΩ Infinity
BEFORE SERVICING
Instrument Used: FLUKE
STATOR ROTOR
L1-L2 1.2 MΩ L1-L2 0.3 MΩ
L2-L3 1.2 MΩ L2-L3 0.3 MΩ
L3-L1 1.2 MΩ L3-L1 0.3 MΩ
AFTER SERVICING
Instrument Used: FLUKE
STATOR ROTOR
L1-L2 1.2 MΩ L1-L2 0.4 MΩ
L2-L3 1.2 MΩ L2-L3 0.4 MΩ
L3-L1 1.2 MΩ L3-L1 0.4 MΩ
III. ELECTRICAL INSPECTION, (WINDING)
V. MECHANICAL INSPECTION
1. The key is tight fit when inserted to the shaft key way.
2. The drive motor was aligned with the driven load.
3. The mounting bolts were tight.
WORKS DONE
Mechanical Works:
1. Removal and dismantling of Crusher No. 4 motor.
2. Cleaning, inspection of parts and accessories.
3. Measuring and checking of Bearing Housing and Shaft Journal clearances.
4. Cleaning and heating of stator and rotor and applying red insulating varnish.
5. Assembling of the motor.
6. Install drive belts and aligning of drive motor to its driven load.
Electrical Works:
7. Conduct electrical testing of stator and rotor such as, Insulation Resistance and Polarization
Index (P.I.) tests.
8. Witness test run without load. (Witness by PMSC Maintenance Personnel)
Prepared by:
ALLAN G. PILAYRE
ITES-Head, Technical Services
Noted by:
CLARITO B. DACUA
General Manager
BEFORE SERVICING