TO WHOM IT MAY CONCERN

IT IS TO CERTIFIED THAT THE AREA REPORT AND CESS CHARGES OF PLOT NO.86,
AMRAVATI ENCLAVE, PANCHKULA (HRY) AS PER NORMS OF HUDA LETTER NO.1142-1192,
DATED :- 09-08-2022. AS PER DETAIL GIVEN BELOW:-

DESCRIPTION:-

STILT FLOOR, GROUND FLOOR, FIRST FLOOR, SECOND FLOOR & MUMTY (TERRACE
FLOOR) WILL BE CONSTRUCTED WITH FIRST QUALITY MATERIAL.

AREA DETAIL:-

TOTAL PLOT AREA = 420.00 Sq.M.

BUILT UP AREA ON BASEMENT FLOOR = 206.77 Sq.M.

BUILT UP AREA ON GROUND FLOOR = 251.72 Sq.M.

BUILT UP AREA ON FIRST FLOOR = 232.03 Sq.M.

BUILT UP AREA ON SECOND FLOOR = 193.87 Sq.M.

BUILT UP AREA ON TERRACE FLOOR (MUMTY) = 2.86 Sq.M.

TOTAL BUILT UP AREA = 887.25 Sq.M.or 9550.359 Sq. Ft.

AREA WHICH HAVE BEEN LABOUR CESS PAID EARLIER = 1939.061 Sq.M. or 20872.05 Sq.Ft.

NOW LABOUR CESS FOR AREA IS TO BE PAID = 42985.153 Sq.Ft.

THE COST OF CONSTRUCTION FOR FIRST QUALITY MATERIAL WILL BE Rs.1000/-PER Sq.Ft

= 42985.153 X 1000

COST OF CONSTRUCTION = Rs 4,29,85,153

1% OF TOTAL COST = Rs 4,29,852

LABOUR CESS CHARGES = Rs 4,29,852

i. Labour Cess (1%)- Rs ………….. (Draft in favour of Director Town & Country Planning,
Chandigarh, Haryana Payable at Chandigarh)Draft No-
ii. Labour Cess (99%)- Rs- …………………/- (Draft in favour of Secretary, Haryana Building
and other Construction workers Welfare Board Payable at Chandigarh)Draft No-