Create a Quality Control Chart (Levey-Jennings Chart) using the following values and interpret for

errors based on the Westgard rule or if there is a Trend or a Shift in the control values. Show the
Standard deviation (SD), Lower limit, Mean, and Upper limit in a table form.

Day Control Values (x - x̄) (x - x̄)2


1 75 -10.47 109.62
2 78 -7.47 55.80
3 80 -5.47 29.92
4 78 -7.47 55.80
5 83 -2.42 6.10
6 92 6.53 42.64
7 100 14.53 211.12
8 96 10.53 110.88
9 82 -3.47 12.04
10 93 7.53 56.7
11 88 2.53 6.4
12 85 -0.47 0.22
13 80 -5.47 29.90
14 89 3.53 12.46
15 83 -2.47 6.10
Total= 1282 745.73
Mean= 85.47 SD= 7.30

SD=7.30 LOWER LIMIT MEAN UPPER LIMIT


1SD 78.17 85.47 92.77
2SD 70.87 85.47 100.06
3SD 63.57 85.47 107.36

Solution for Standard


Deviation: Mean=85.47
Average of (x - x̄)2 =49.72
SD=7.30
107.36

+3S

+2S

+1S

MEAN
107.36

7t rule violation

Controls from Day 1 to Day


7 is increasing consistently.