Project Name Repair/Maintenance of Lasala St., Brgy.

Taruc Drainage Rectangular Channel


Location Socorro, Surigao del Norte

Beginning End Length


Section: 0+000 0+082 82ln.m

Item I-Structural Excavation: Backhoe will be Provided by the company

Item II-Concrete Works: Transit Mixer will be Provided by the company

Volume: 2.5m x 0.20m x 82m x 2 sides = 82.00 cu.m


2.1m x 0.20m x 82m x 2 sides = 68.88 cu.m
150.88 cu.m
Partially Completed Precast 1.2m each @ 8 units
2.5m x 0.20m x 9.6m x 2 sides = 9.60 cu.m
2.1m x 0.20m x 9.6m x 1 side = 4.03 cu.m
13.63 cu.m

Remaining Quantity to be completed 137.25 cu.m


Cover of Partially Completed Precast 4.03 cu.m
141.28 cu.m

I Concrete Works 141.28 cu.m 1,300.00 /cu.m 183,664.00


Installation of Precast included in
II 8 units 700.00 /unit 5,600.00
between gap
189,264.00

Project Name Repair/Maintenance of Lasala St., Brgy. Taruc Drainage Rectangular Channel
Location Socorro, Surigao del Norte

Beginning End Length


Section: 0+000 0+165 65 ln.m

Item I-Concrete Works

Volume: 0.9m x 0.10m x 165m x 2 sides = 29.70 cu.m


0.7m x 0.10m x 165m x 2 sides = 23.10 cu.m
52.80 cu.m
I Structural Excavation (Manual) 129.6 cu.m 400.00 /cu.m 64,800.00

Concrete Works (Formworks,


II 52.80 2,000.00 /cu.m 105,600.00
Steelworks, Concrete Pouring Manually)

170,400.00

TOTAL Php 359,664.00


QOUTATIONS FOR THE PROJECT DRAINAGE RECTANGULAR CHANNEL

Project Name Repair/Maintenance of Lasala St., Brgy. Taruc Drainage Rectangular Channel
Location Socorro, Surigao del Norte

Beginning End Length


Section: 0+000 0+082 82ln.m

Item I-Structural Excavation: Backhoe will be Provided by the company

Item II-Concrete Works: Transit Mixer will be Provided by the company

Actual site condition:


In original plan, its depth is 2.5m but in actual it is only 1.3m depth, since it is a continuation of the existing canal, therefore,
existing depth will be followed.

Volume: 1.3m x 0.20m x 82m x 2 sides = 42.64 cu.m


2.1m x 0.20m x 82m x 2 sides = 68.88 cu.m
111.52 cu.m

Actual site condition:


Due to vast water from the upstream of existing concrete canal, it can cause delayed on the implementation. Therefore, a precasting
of every 1.2m lenght should be done in actual. It was observed, 8 units of 1.2m precast without cover is ready for installation.

Partially Completed Precast - 1.2m each @ 8 units


1.3m x 0.20m x 9.6m x 2 sides = 4.99 cu.m
2.1m x 0.20m x 9.6m x 1 side = 4.03 cu.m
9.02 cu.m

Remaining Quantity to be completed 102.50 cu.m


Cover of Partially Completed Precast 4.03 cu.m
106.53 cu.m

I Concrete Works 106.53 cu.m 2,500.00 /cu.m 266,325.00

Installation of Precast included in


II 8 units 2,000.00 /unit 16,000.00
between gap of each unit

SUB-TOTAL 282,325.00
Project Name Repair/Maintenance of Brgy. Pamosaingan Drainage Rectangular Channel
Location Pamosaingan, Socorro, Surigao del Norte

Beginning End Length


Section: 0+000 0+165 165 ln.m

Item I-Structural Excavation:


Actual site condition:
Site is inaccesible of Heavy Equipments. Therefore, it should be done manually. Portions of this crossing through the road and it
needs more time and manpower to demolish the existing road.

Volume: 0.9m x 0.90m x 165m = 133.65 cu.m

133.65 cu.m

Item I-Concrete Works


Actual site condition:

Included Formworks and Steelworks. Site is inaccesible of transit mixer, therefore Concrete Pouring should be done manually.
Some Item of works partially accomplished in actual will be deducted to this quantity.

Volume: 0.9m x 0.10m x 165m x 2 sides = 29.70 cu.m


0.7m x 0.10m x 165m x 2 sides = 23.10 cu.m
52.80 cu.m

I Structural Excavation (Manual) 133.65 cu.m 500.00 /cu.m 66,825.00

Concrete Works (Formworks,


II 52.80 cu.m 3,500.00 /cu.m 184,800.00
Steelworks, Concrete Pouring Manually)

SUB-TOTAL 251,625.00

Repair/Maintenance of Lasala St., Brgy. Taruc Drainage Rectangular


1) Php 282,325.00
Channel

Repair/Maintenance of Brgy. Pamosaingan Drainage Rectangular


2) Php 251,625.00
Channel

TOTAL Php 533,950.00

Prepared by:
PLAMASOR Q. BESAS
Foreman
Kwesey Ailish E. Mascardo
Grade I

Instruction: Write your answer in the blank.

1 ) 12 + 15 = ___________ 16 ) 15 - 4 = ___________
2 ) 20 + 16 = ___________ 17 ) 16 - 7 = ___________
3 ) 23 + 17 = ___________ 18 ) 17 - 10 = ___________
4 ) 35 + 18 = ___________ 19 ) 18 - 9 = ___________
5 ) 34 + 19 = ___________ 20 ) 19 - 3 = ___________
6 ) 40 + 20 = ___________ 21 ) 20 - 15 = ___________
7 ) 45 + 21 = ___________ 22 ) 21 - 9 = ___________
8 ) 55 + 22 = ___________ 23 ) 55 - 22 = ___________
9 ) 67 + 23 = ___________ 24 ) 46 - 23 = ___________
10 ) 21 + 24 = ___________ 25 ) 34 - 24 = ___________
11 ) 34 + 25 = ___________ 26 ) 35 - 25 = ___________
12 ) 33 + 26 = ___________ 27 ) 78 - 26 = ___________
13 ) 37 + 27 = ___________ 28 ) 45 - 27 = ___________
14 ) 68 + 28 = ___________ 29 ) 49 - 28 = ___________
15 ) 78 + 29 = ___________ 30 ) 29 - 27 = ___________

You might also like