Download as pdf or txt
Download as pdf or txt
You are on page 1of 27

5/12/2020

SAP

Purchase Requisition Processing

May 12, 2020 1

Welcome!

Housekeeping Expectations
• Attendance Sheet • Ask questions
• Washrooms • One speaker at a time
• Fire exits • Respect others
• Turn off /silence phones
• Computers are for course
exercises
• Have fun!

May 12, 2020 2

Objectives

After completing this course, you should be able to:


– Describe SAP ordering methods
– Describe order types and their uses
– Customize purchase requisition settings
– Search for materials
– Determine if material is ordered from a warehouse or vendor
– Create orders for materials and services
– Generate a list of existing purchase requisitions
– Describe the SAP release strategy and approval workflow
– Change a purchase requisition
– Confirm received services

May 12, 2020 3

1
5/12/2020

SAP Terms

Refer to the “Terms & Concepts” sheet

May 12, 2020 4

Module 1

May 12, 2020 5

Getting Started with Ordering

After completing this module, you should be able to:


– Describe SAP ordering methods

May 12, 2020 6

2
5/12/2020

Supply Chain Master Data

Material Master Records


Purchasing Info Records
Contracts
Source Lists
Vendor Purchasing Data

Material Master Records

In SAP, each material and service the


Winnipeg Health Region orders is:
– Referred to as a “material”
– Assigned a unique SAP material number
that has a corresponding material master
record in the system

May 12, 2020 8

Material Types

• SAP organizes material master records by material type –


a group of materials with the same basic attributes

Services Physical Materials

May 12, 2020 9

3
5/12/2020

Ordering Materials and Services

• Orders created using SAP identify the material or service


and contain specific information from the material master
record

• Base unit of measure


• Material Description
• Material Group

May 12, 2020 10

Physical Material Stock and Non-Stock

• At the site and department levels, physical materials are


broken down into two types
– Stock
– Non-stock

• Stock and non-stock materials may be ordered from a plant


warehouse or an external vendor
• Services that are not provided internally are ordered from
an external vendor

May 12, 2020 11

SAP Ordering

Inventory Management Requisitioning

May 12, 2020 12

4
5/12/2020

Inventory Management (IM)

• In IM, materials regularly ordered and used by an area are


maintained as inventory in a storage location (SLoc)

• For each physical stock material kept in an SLoc, certain


information is maintained in SAP, including:
– A maximum quantity (MAX) to be stocked in storage
– A reorder point (ROP) that determines when the material needs to
be reordered
– An assigned bin location to store the material

May 12, 2020 13

Inventory Management

May 12, 2020 14

Material Requirements Planning (MRP)

• For each SLoc, SAP’s Material Requirements Planning


(MRP) functionality runs automatically according to a set
schedule, and:
– Determines the stock that needs to be replenished
– Calculates the replenishment quantity
– Creates an order to replenish the stock

May 12, 2020 15

5
5/12/2020

Requisitioning

• Requisitioners use SAP to create a variety of order types


for materials and services

• The order type depends on where the material or service is


ordered from:
– An external vendor
– A plant warehouse

May 12, 2020 16

Requisitioning Cycle

Approver

Requisitioner

Buyer

Accounts
Payable

Receiver

May 12, 2020 17

Review Questions

1. What are the two SAP ordering methods?

2. How are physical materials (stock and non-stock) and


services ordered?

3. What two ways can orders be created in SAP?

May 12, 2020 18

6
5/12/2020

Module 2

May 12, 2020 19

Getting Started

After completing this module, you should be able to:


– Describe order types and their uses
– Customize purchase requisition settings
– Search for materials
– Determine if material is ordered from a warehouse or vendor

May 12, 2020 20

Creating Orders in SAP

System-generated (IM-MRP)
– Materials from the plant warehouse or a vendor
to replenish SLoc stock only

Requisitioner-generated
– Materials from the plant warehouse or a vendor
– Services from a vendor

May 12, 2020 21

7
5/12/2020

Purchase Requisition Document Types

• A variety of SAP purchase requisition types, known as


document types, can be created to order materials and
services from a vendor source

– A document type must be


specified in SAP each time
a purchase requisition is
created

May 12, 2020 22

Purchase Requisitions

• Purchase requisitions contain a number of fields and tabs


that are organized into three main areas
Purchase Requisition Area Important Fields And Tabs
Header Field:
• Header Note
Item Overview Field:
• Account Assignment Category*
• Item Category*
• Material*
• Quantity*

Item Detail Tab:


• Account Assignment tab*
• Source of Supply tab
• Delivery Address tab*
• Texts tab

May 12, 2020 23

Activity 1: Demo

T-code: ME53N Display Requisition

• Refer to job aid:


− Display a Purchase Requisition

May 12, 2020 24

8
5/12/2020

Preparing to Create Purchase Requisitions

• Before you create purchase requisitions, your SAP settings


need to be customized
– Ensures that only the relevant data fields display in the SAP
create requisition window
– Reduces data entry effort

May 12, 2020 25

Activity 2: Exercise

T-code: ME51N Customize Purchase Requisition Settings

• Refer to job aid:


− Customize Purchase Requisition Settings

May 12, 2020 26

Searching for Materials in SAP

• Before you order a material or service using SAP:


– Perform a search in the system to determine if the material or
service has been assigned a corresponding material number

• Material searches can be


performed in a number of ways,
including from directly within the
ordering t-code

May 12, 2020 27

9
5/12/2020

Activity 3: Exercise

T-code: ME51N Search for Material

• Refer to job aid:


− Search for a Material or Material Group Number

May 12, 2020 28

Determining the Order Type

• Always check to see if a material is available from your


plant warehouse first, to determine if it is ordered:
– Internally from your plant warehouse
– Externally from a vendor

• Requests can be made to have a material extended to a


plant for ordering

May 12, 2020 29

Activity 4: Exercise

T-code: MM03 Determine Order Type

• Refer to job aid:


− Determine Order Type

May 12, 2020 30

10
5/12/2020

Display Stock of Materials

• SAP can be used to display the current quantity on-hand for


a material at:
– A plant warehouse
– Storage locations (SLocs) within the plant
– SLocs within the Winnipeg Health Region

May 12, 2020 31

Activity 5: Exercise

T-code: MB52 Display Warehouse Stocks of Materials

• Refer to job aid:


− Display Warehouse Stocks of Materials

May 12, 2020 32

Review Questions

1. What should you do before ordering a material or a


service?

2. Why should you always check to see if the material that


you want to order is available from the warehouse before
creating an order?

May 12, 2020 33

11
5/12/2020

Module 3

May 12, 2020 34

Ordering Materials and Services

After completing this module, you should be able to:


– Create orders for materials and services
– Generate a list of existing purchase requisitions

May 12, 2020 35

Ordering Materials from a Vendor

• If a material is not available from the plant warehouse, it is


ordered from an external vendor

• Always perform a search to ensure you create the order


using an SAP material number

May 12, 2020 36

12
5/12/2020

Ordering Materials from a Vendor

• Some vendor catalogs can be accessed online directly from


within the ME51N screen in SAP to make
– Search and select items to order from their website
– Items will populate into the purchase requisition

• Standard requisition approval process applies

May 12, 2020 37

Ordering Free Text Materials

• A “free text” requisition can be created to order materials


that do not have an assigned SAP material number

• Drop-downs menus are used to search for the applicable


entry in the requisition fields:
– Material Group
– Purchasing Group
– Source of Supply (Desired Vendor)
– Address
– Unit of Measure

! A realistic valuation price is


required for a free text request.

May 12, 2020 38

Activity 6: Exercise

T-code: ME51N Create a Purchase Requisition (Vendor)

• Refer to job aid:


− Create a Purchase Requisition
− Purchase Requisition Reference

May 12, 2020 39

13
5/12/2020

Suggested Order Unit

• A prompt appears when the ordered quantity in a purchase


requisition does not match the Winnipeg Health Region
standard purchase unit of measure

May 12, 2020 40

Purchase Requisition Templates

• Templates can be created for purchase requisitions so that


they can be used
– As reference to create future identical purchase requisitions,
which reduces the amount of data entry required
– For recurring purchase requisitions
– To maintain a list of defined materials

• Templates can be saved for personal or public usage


– Public templates are useful for areas where
multiple requisitioners create similar orders

May 12, 2020 41

Activity 7: Exercise

T-code: ME51N Create a Purchase Requisition (Template)

• Refer to job aid:


− Create, Save, and Load a Personal Requisition Template
− Create a Purchase Requisition

May 12, 2020 42

14
5/12/2020

Purchase Requisitions for Services

• If an SAP material number does not exist for a service:


– Create a free text purchase requisition
– Select the Material Group associated with the service

• The material group triggers SAP to request confirmation


that a service is received after the vendor invoice is entered

SAP Material Numbers


for Service Listing

May 12, 2020 43

Service Approver

• After the vendor invoice is entered in SAP, a “Service


Approver” must confirm if the service was received

• The Service Approver’s SAP user ID must be identified in


the Requisitioned By field within the purchase requisition
– SAP validates the user ID entered into the field

May 12, 2020 44

Activity 8: Exercise

T-code: ME51N Create a Purchase Requisition (Service)

• Refer to job aid:


− Create a Purchase Requisition
− Search for a Material or a Material Group Number
− Purchase Requisition Reference

May 12, 2020 45

15
5/12/2020

Ordering from the Plant Warehouse

• If a material is available from the plant warehouse, it can be


ordered directly from the plant warehouse

HSC
Purchase Requisition
T-Code ME51N

Non-HSC
Reservation
T-code MB21
Warehouse

May 12, 2020 46

Activity 9: Exercise

T-code: ME51N Create a Purchase Requisition


(HSC Warehouse)
• Refer to job aids:
− Create a Purchase Requisition
− Purchase Requisition Reference

May 12, 2020 47

Reservation

Non-HSC sites only

• A reservation is created to order material from within a non-


HSC plant warehouse

• Includes both:
– Stock
– Non-stock

May 12, 2020 48

16
5/12/2020

Reservation Movement Types

Non-HSC sites only

• A movement type must be selected in SAP each time a


reservation is created to track material goods movement
– A unique three-digit number identifies each movement type

# Movement Type

201 Non-stock material expensed to a cost center

261 Non-stock material expensed to an internal order

311 Stock material transferred into receiving SLoc

May 12, 2020 49

Activity 10: Exercise

T-code: MB21 Create a Reservation

• Refer to job aid:


− Create a Reservation

May 12, 2020 50

Reservation Changes

• A requisitioner-generated reservation can be changed for


the following reasons:
– Increase or decrease item quantity
– Delete an item

• Changes can only be made for “open” reservations – those


that have not already been filled by the warehouse

May 12, 2020 51

17
5/12/2020

Activity 11: Exercise

T-code: MB22 Change/Delete a Reservation

• Refer to job aid:


− Change/Delete a Reservation

May 12, 2020 52

Additional SLoc Stock Material

• Stock materials for an SLoc are ordered via MRP after a


unit stock count is entered into SAP
– Enter a zero count into SAP if you need extra
– Submit a Site Inventory Change Request Form to adjust
the MAX/ROP

Site Inventory
Change Request

May 12, 2020 53

Additional SLoc Stock Material

• An order can be created to order stock material in excess of


your MAX for exceptional situations:
– To satisfy a one-time need (e.g. for a specific patient)
– To maintain inventory levels for a specific period of time
(e.g. long weekend)

May 12, 2020 54

18
5/12/2020

Display and Order Materials

• You can generate a report to display materials by material


number and plant number, or use additional search criteria.

• Requisitioners can use the report to,


– Order non-stock materials
– View available stock
– View vendor contracts
– View material images, if available

Complete the ZMM_MATORDER SAP Byte

May 12, 2020 55

List Display of Purchase Requisitions

• You can display a list of purchase requisitions in SAP based


on specified search criteria, such as:
– A requisitioner
– Storage location (SLoc)
– Cost Center
– Material
– Date

May 12, 2020 56

Activity 12: Demo

• T-code: ME5A List Display of Purchase Requisitions

• Refer to job aid:


−Display Purchase Requisitions

May 12, 2020 57

19
5/12/2020

Material Returns

• There are a number of reasons why a material may need to


be returned, for example:
– Damage prior to delivery
– Errors in ordering or shipping
– Patient transferred or discharged

• Information about material returns


is available on Insite

Returns
Reference Guide

May 12, 2020 58

Review Questions

1. How are orders created for materials that do not have an


SAP material number?

2. When creating a purchase requisition for a service, whose


SAP user ID must be identified in the Requested By field?

May 12, 2020 59

Module 5

May 12, 2020 60

20
5/12/2020

Purchase Requisition Approval and Maintenance

After completing this module, you should be able to:


– Describe the SAP release strategy and approval workflow
– Change a purchase requisition
– Confirm received services

May 12, 2020 61

SAP Release Strategy

• After a purchase requisition is saved, each line item


undergoes an approval process based on its dollar value
– Applies to requisitioner-generated vendor orders only
– Does not apply to requisitioner-generated warehouse orders
and MRP-generated requisitions

Origin Order Type Approval Required

Requisitioner Vendor Yes

Requisitioner Warehouse No

System (MRP) All No

May 12, 2020 62

Requisition Approval Levels

• The release strategy includes seven approval levels


– With corresponding maximum dollar value signing authorities
– Maintained in SAP

May 12, 2020 63

21
5/12/2020

SAP Release Strategy

• After you create and save a purchase requisition, SAP:


– Identifies the person(s) who will be the approver(s)
– Initiates the approval workflow
– Sends an email to notify the approver, which directs the
approver to the Business Workplace t-code in SAP

• Depending on the cost of the line item, the process may


require multiple approvals

May 12, 2020 64

SAP Requisition Approval Workflow

• SAP identifies the approver(s) for a requisition line item


based on the:
– Dollar value of the material or service
– Cost center or internal order
– HR org structure (standard - NB)
– Custom table (special purpose account - ZSPF)

May 12, 2020 65

Capital Requisition Approval

• Initial capital approvals are obtained outside of SAP


– Once obtained, a capital requisition (ZCAP) can be created

• Capital requisition approval workflow involves a maximum


of two approvals that are not based on cost

May 12, 2020 66

22
5/12/2020

The Business Workplace

• Requisitioners and approvers can both access the SAP


Business Workplace

REQUISITIONERS APPROVERS

• View purchase requisition • View purchase requisition


approval/rejection messages approval work item messages

• Edit rejected purchase • Approve and reject purchase


requisitions requisitions

• Confirm received services

May 12, 2020 67

Approval Workflow Escalation

• SAP workflow automatically escalates a purchase


requisition to the next approver:
– If the item is not acknowledged within a certain timeline
– To prevent delays in the approval process

Monday Tuesday Wednesday Thursday Friday

1 2 3 4 5

May 12, 2020 68

Approval Workflow Messages

• After an approval workflow is complete, the requisitioner:


– Will receive email notification indicating the result
– May access the SAP Business Workplace to view details
– Edit and resubmit a rejected requisition for approval (if the
rejection reason can be resolved)

May 12, 2020 69

23
5/12/2020

Changing a Requisition

• An existing purchase requisition can be changed in SAP


when a required update is identified, such as:
– Quantity
– Delivery address
– Cost Center
– Internal order

HSC Requisitioners: will be notified by email if a


! requisition created for a warehouse material cannot be
converted into an order, and will be required to make any
necessary corrections.

May 12, 2020 70

Release Status

• The status of a requisitioner-generated requisition can be


viewed in the Release Strategy tab in the Change
Purchase Requisition screen

May 12, 2020 71

Activity 13: Exercise

T-code ME52N: Change Purchase Requisition

• Refer to job aid:


− Change a Purchase Requisition

May 12, 2020 72

24
5/12/2020

Accounts Payable (AP) Service Workflow

• The Accounts Payable (AP) Service Workflow is used to


automate the goods receipt process for services

• After AP enters a vendor invoice for a service created on a


purchase order, a workflow is triggered to seek confirmation
that the service was received

May 12, 2020 73

Confirm, Hold, or Reject Service

• Service Approver identified in the purchase requisition


receives an SAP-generated email notification in Outlook
– Service Approver is directed to the SAP Business Workplace
to make a selection for invoiced services
– Reminder emails are sent every 3 days until action is taken,
or 60 days have elapsed

Confirm Reject Hold

May 12, 2020 74

AP Service Workflow Escalation

• An escalation email is sent directly to the AP processing


clerk and Buyer every 10 days until the Service Approver
takes action, or 60 days have elapsed
– If the Service Approver does not take action within 60 days,
the item is removed from the Service Approver’s inbox

M T W TH F M T W TH F M

1 2 3 4 5 6 7 8 9 10 11

May 12, 2020 75

25
5/12/2020

Service Items On Hold

• Escalation is stopped for service items that are On Hold


– Service Approver receives a reminder in the Business
Workplace if an item is on hold more than 10 business days

Hold

Note: It is important to review your SAP in box regularly to


confirm or reject your service items!

May 12, 2020 76

Activity 14: Demo

T-code SO01: Business Workplace (Confirm Received Services)

• Refer to job aid:


− Confirm, Reject, or Hold Services

May 12, 2020 77

Review Questions

1. What kinds of purchase requisitions undergo an approval


process?
2. What process is in place to prevent delays in purchase
requisition approval?
3. What happens if a service workflow item is not confirmed
or rejected after 60 days?

May 12, 2020 78

26
5/12/2020

Course Summary

Having completed this course, you should be able to:


 Describe SAP ordering methods
 Describe order types and their uses
 Customize purchase requisition settings
 Search for materials
 Determine if material is ordered from a warehouse or vendor
 Create orders for materials and services
 Generate a list of existing purchase requisitions
 Describe the SAP release strategy and approval workflow
 Change a purchase requisition
 Confirm received services

May 12, 2020 79

On-the-job Support

SAP Help Menu Quick Reference Non-HSC

Insite (SAP) Quick Reference HSC

New User Support Guide

May 12, 2020 80

Please Complete the Survey. Thank You!

https://www.surveymonkey.com/r/SAPILT

May 12, 2020 81

27

You might also like