Hydrological and Hydraulic Analysis of Bridge at Km 22+682

Cross Section followed for bridge Point 180 m of Survey data


Deepest Bed Level 18.396 m
Silt Factor as per Geotechnical report 2.3
HFL information received from local official 22.1 m

Discharge Calculation
Catchment Area = 1.9 Sq. Km
Discharge by Rational Formula (Q100) = 20 Cumec
Discharge by Ryve's Formula= 10 Cumec
Discharge by Dicken's Formula= 18 Cumec
Discharge by Slope-Area Method = 82.0 Cumec

Adopted Discharge
For Fixing Effective Clear Waterway normal to flow 82 Cumec
For Fixing HFL 82 Cumec
For Estimation of Scour 107 Cumec

Waterway
Clear Waterway Provided 30.0 m

Summary of Calculation for Proposed Bridge


Afflux (h) for Q100 0.015 m
Velocity under Bridge for Q100 1.16 m/sec
HFL with afflux for Q100 22.115 m

Scour Calculation
Q for Scour (1.3*Q100)= 106.55 Cumec
Silt Factor=As per Geotech Report 2.3
Clear Waterway (m) = 30
Unit Discharge (Db), (Cumec per m) = 3.55
Normal Scour (m, below HFL) = 2.36
Maximum Scour under Pier (m, below HFL) = 4.72
Maximum Scour under Abutment (m, below HFL) = 2.997
RL (m) of HFL = 22.115
RL (m) of scoured Bed below Pier = 17.395
RL (m) of scoured Bed below Abutment = 18.396

Observations
As per the hydraulic calculation the velocity and scour of 100 yr flood of 82 cumec are within
the limit to pass through the proposed waterway.
Recommendation
Provide clear effective waterway of 30.0 m with an estimated HFL of 22.115 m.