Professional Documents
Culture Documents
Quality Manual 2022-2030 (A
Quality Manual 2022-2030 (A
QUALITY MANUAL
1
Table of Contents
Description Page
1. Introduction …………………………………………………………………………………………….. 4
2. Our Vision, Our Mission …………………………………………………………………………….. 5
3. Quality Management System …………………………………………………………………….. 6
4. Quality Motto & Quality Policy …………………………………………………………….…….. 7
5. The 5 Critical Processes ………………………………………………………………..………….. 8
6. Departmental Responsibility ………………………………………………………….………….. 9
7. Sampling ……………………………………………………………………………..………………….. 11
8. QC File …………………………………………………………………………………………………….. 12
9. Submission of Bulk Fabric/ Trims ……………………………………..………….…………….. 13
10. Color Assessment …………………………………………………………………………………….. 13
11. Fabric Shade band Submission ………………………………………………………………….. 14
12. Laboratory Testing ………………………………………………….……………………………….. 15
13. Fabric & Trims/ Accessories Inspections, Tests …………….………….………………….. 17
14. Preproduction Review Meeting ……………………………………………………………….….. 23
15. In process Quality Inspections ………………………………………………….……………….. 24
16. Standard make Inspections ……………………………………………………………………….. 25
17. QC Check Points …………………………………………………….…………………….………….. 29
18. Spreading & Cut Parts Inspections ………………………………………….………………….. 30
19. Fusing Procedures ………………………………………………………….………………….…….. 31
20. Start up Production Line …………………………………………….…………………………….. 32
21. The Inline Inspections …………………………………………….…….………………………….. 33
22. TOP/ Rack/ Shipment Samples ………………………………………………………………….. 35
23. Garment Washing & Finishing …………….…………………………………………………….. 36
24. Finishing ………………………………………………………………………………………………….. 37
25. Random Inspection Method …..………………………………………………………………….. 39
26. AQL …………………………………………………………….………………………………………….. 40
27. Pre final & Final Inspections …………………………….……………………………………….. 42
28. Classification of Defects …………………………………………………………………………….. 49
29. Acceptability of a Shipment ……………………………………………………………………….. 50
30. Fault Categories ……………………………………………………………………………………….. 51
31. QC Inspections Reports …………………………………………………………………………….. 56
2
32. Closing Meeting after Inspections ………………………………………………..…………….. 57
33. Shipment Release Procedure ……………………………………………………….…………….. 59
34. 5S System ……………………………………………………………………………………………….. 60
3
1. Introduction
This manual cannot cover all areas of each job role, but it is hoped that from the
information contained within, all staff will be able to make correct decisions and judgments
as required.
c) Quality Control (QC) is used to describe the fifth phase of the Define, Measure,
Analyze, Improve, and Control (DMAIC) model which is a data-driven quality strategy
used to improve processes.
g) Quality scope provides what parts of the organization does the QMS cover or not
cover.
h) Quality system processes indicate what the key activities that occur at the
organization.
In Fine Spinners Uganda Limited, the manufacturing Quality Manual specifies how our
quality & technical staff should perform in the company.
Everyone within the company is working guided by the same guidelines and therefore
maintaining a consistent high level of quality.
4
Quality is not just the quality of the product, but quality of all performance related areas
below: i) Quality of product
ii) Quality of work
iii) Quality of service / communication
iv) Quality of information
v) Quality of process
vi) Quality of department
vii) Quality of people
viii) Quality of system
ix) Quality of objectives
5
2. Our Vision and Mission
2.1 VISION
To attain customer satisfaction by delivering nothing but the
best, by means of utilizing the highest quality of resources and
world-class systems.
We will always endeavor to satisfy our customers' needs and
exceed expectations through win-win relationships and delight
them.
“We believe in business as a force for good”
We believe that through businesses we can transform the world;
a new way of doing business exists in which the final goal is not
purely financial profit but transformation as well.
It´s Time to Change.
2.2 MISSION
To create an ethical, sustainable and eco-efficient apparel
industry.
We aim to become the business partner of our clients,
accompanying them through their process of change, and adding
value at each step. Offering them disruptive quality production
that breaks the norm, enabling innovative and transformative
ways of doing things.
And we do it following our “The Best in service” initiative, with
the rigor and service quality of highest level, but with the
capability to react and the closeness of a local business. We
inspire loyalty in our clients by providing them with the best
quality production service that they have ever experienced.
6
3. Quality Management System
PLAN IMPLEMENT
IDENTIFY ASSESS
REQUIREMENT QUALITY
S MANAGEMENT
SYSTEM
LESSONS MEASURE
LEARNED
CONTINOUS MONITOR
IMPROVEMENT
7
4. Quality Motto & Quality Policy
4.1 Quality Motto
1ST TIME 1ST RIGHT: ZERO TOLERANCE TO DEFECTS
TOGETHER WE CAN *If we Follow S.O.Ps with self-discipline*
Customer Satisfaction
• Providing our customers with products and that meet or exceed their requirements.
Continual Improvement
• Measuring improvement of the effectiveness of our business and its management and
operating systems.
Employees
• Providing training to employees to promote Continual Improvement.
• Empowering our employees to use their skills and talents to achieve the quality policy
and business plan objectives.
Environment
• Maintaining operations that protect the environment and the natural resources of our
communities and our nation.
Safety
• Providing a safe work environment for our employees and visitors at all times.
• Supplying products and services that are fit for purpose & safe to use.
Management System
• Maintaining a management system compliant to ISO 9001 and applicable legal and
regulatory requirements.
• Reviewing our management system on a continual basis for its robustness and integrity.
• Setting and reviewing performance objectives to meet our business goals.
8
5. The Five Critical Processes
Fine Spinners Uganda Limited is dedicated to manufacturing the highest possible quality
apparel for our customers. To meet our customers’ expectation and requirements, fine
spinners QA has developed a quality assurance program to achieve the objectives of five
critical processes:
a) Factory evaluation
Fine Spinners’ QA team will conduct factory evaluation and inspections to ensure the
company is capable of producing the right quality and provide the production capacity that
our customers require.
The company management team with a group of auditors will conduct quality system
audits and 2nd party social compliance audits, if requested and also liaise with customer
appointed 3rd party auditor to run the external social compliance audit programs.
c) Technical Assessment
Garment technologists / technicians allocated to this Strategic Business Unit will do the
following:
• Set up fit standards by how to measure, base patterns and grading rules.
• Conduct detailed technical assessment at the product development stage.
• Review all aspects of garment technicalities.
• Agree the quality standards with customers and factories prior to production.
• Ensure the integrity of product package released to manufacturers.
d) Laboratory testing
e) Quality Control
9
• Pre-production review – ensure the production personnel understands customers quality
requirements and take pro-active steps to control quality throughout the full manufacturing
process.
• Pre-production sample / pilot production approval - Support the factories by providing
technical guidance to the sewing operatives.
• Pre-shipment inspections- to assure product meets the buyer quality & safety
requirements.
10
6. Departmental Responsibility
6.1 Management
a) To liaise between customers and factories so that the requirements of the customer
can be fully understood and conveyed
b) To present customer and suppliers information to QA department, in an order that is
suitable standard/specification can be used for inspection. This can be supported by
completing all the specified documents.
c) Factory sourcing to obtain a good quality product and a wide variety of options.
a) Quality Assurance.
b) Social compliance monitoring.
g) Conduct planned and systematic inspections to ensure the product and service will
satisfy the quality requirement.
j) To ensure all documentation for shipments is sent to the customer in sufficient time for
them to conduct import procedures before docking of vessels / air-lifting the goods.
11
k) To ensure all payments are implemented on due date, therefore maintaining a good
working relationship with our sources.
l) To check all L/C’s are received from customers within time for shipment and that the
documents conform to those requested.
6.5.1 QC Manager
a) To supervise and manage the QC teams.
b) To organize and schedule all inspections
c) To evaluate the performance of all inspectors and their inspection report.
d) To assure fine spinners products meet buyer’s requirement.
e) To evaluate factories’ quality performance.
f) To provide factory audit training.
g) To perform new vendor survey.
h) To control QC expenses.
13
7. Sampling
1. Styling Sample
At first, we need to make a styling sample for getting styling approval as per buyer’s
specification, fitting & workmanship. Everything we need to follow as original sample &
comments. For styling samples, we give fabric & accessories similar to original color or
approved lap dip. We, make a paper pattern of sample size as a buyer requirement. As per
styling sample comments, we make the size set pattern.
4. Counter Sample
In every step of sampling, we keep a counter sample with marking the sample name. The
pre-production sample counter should follow with PP comments for bulk production. We
make a copy of the PP sample with comments to give every line in production.
5. Shipment Sample
The shipment sample has to prepare for buyer 15 days before shipment covering all sizes
& colors with all actual accessories. These requirements vary from buyer to buyer. We
always fulfill our buyer’s requirements.
6. Trial Cutting
We cut a small quantity of garments approximate 60 -100pcs as a 1st trail to set the
line/layout, set the machines, to get operators preparedness & see the measurement. If
any correction is required then we do it accordingly. After full confirmation, we start pre
bulk cutting.
14
To ensure that shrinkage allowances built into patterns are corrected for steam
shrinkage, washing shrinkage, fusing, printing, or any other after treatment to standard.
15
8. QC file
1. The merchandisers are responsible to provide a complete QC file to QA department.
2. The merchandisers need to set up QC file when receive any form of ‘order confirmation’
from buyers.
3. To ensure the QA / QC process is handled effectively, all documents for each style are
controlled by one filing system. Merchandisers transfer the final confirmed style
information to the QC file.
4. Merchandiser / Senior Merchandisers are responsible for keeping the file up to dated, and
signing it off when it is released to QA dept.
1. Merchandisers must pass the following information to QC to enable them to complete the
inspections:
Approval sample with Customer seal tag
QC files with full approval details
Customer AQL Level required
16
3. Return of QC file to merchandisers
Quality Controllers are responsible for returning the file to QA manager.
Within 1 week after successful final inspection, the QC must return the QC file to the QA manager.
After the manager signs off QC reports, the files will be returned to merchandising department .
9. Submission of Bulk Fabric/ Trims
a) For proper color coordination between different materials, factory should put all
fabric & trims used for this order on a fabric & accessory card and submit to Fine
Spinners’ merchandisers for review and sign off.
b) Factory must submit the bulk quality of all fabric and trims for Customer approval
before commencing bulk cutting.
c) No bulk production can begin until the merchandiser has signed off the completed
fabric / trim card or at least seen and approved all components being put into
production.
d) As soon as all fabric and trims are received by the factories, a fabric approval card
and trim approval card must be completed by the sample maker.
e) Factories merchandiser must submit their trim cards to the relevant buyer
merchandisers who are responsible for the sign off of trim card for approval.
f) The quality of fabric is checked against the buyer approval standards.
g) The quality of trims is checked against the buyer approval standards.
h) Merchandiser must check bulk against approval standard.
i) A copy of duly signed off fabric & accessory card is filed in the QC file.
j) The fabric approval card and trim approval card should contain the approved
samples & approval chop of merchandisers and / or customers.
Responsibility
1. Factories submit the fabric approval cards and trim approval cards to buyer
merchandisers
2. Fine spinners merchandisers are responsible for check and sign off the color of fabric
and trim.
3. Merchandise Manager / QC manager are responsible for the update of the “standard
lighting condition” and displace the standard to the light box.
17
Light boxes
1. All color assessment must be carried out in a light box placed in the dark room
or black out curtain.
2. For US standard, the recommended brand name is Gretag Macbeth.
3. There is LED as primary source & artificial daylight D65 as secondary source
among other lights as TL 84, U.V. in this light box.
Metamerism
1. All colors show up different shades under different light sources, this is known
as Metamerism.
2. All fabric needs to be checked under yellow light and white light.
3. If white light (D65, CWF) or yellow light (TL 84, U30) as primary source for
color assessment, the other light source should be used to check the
Metamerism.
4. Color submissions must not have any Metamerism effects using white light and
yellow light as illuminate.
18
9. Sorting the swatches into color batches – Put the swatches under the light box using
TL84 and D65 to assess for any color variation. The swatches are compared to the
fabric approval card and trim approval card. Group the swatches to different shade
lots such as A, B, C, D, E… Mark the lot number on each swatch.
10. Prepare the Color Continuity card - A 15cm by 15cm (6” x 6”) cutting from the
swatches of each lot should be mounted on the Color Continuity Cards and fill in
appropriate column with appropriate “lot number”. The total yardage of each dye lot is
then recorded.
11. Approval of Color Continuity card - The Color Continuity Card is prepared in a 3
duplicate sets. QA manager & Merchandiser review these shade bands. Once the
shade band has been agreed, they should sign off. One of the duplicate copies with
list of rolls/shades can be shared to warehouse reference and the warehouse
computer program is updated for roll shade identification. One of the duplicate may be
sent to customers for approval or for reference. One of the duplicate will be kept in
fabric QC file. QC will use this as a standard for inspections.
12. Agree shade band - To control the color variation, an acceptable shade band should
be agreed between buyer standard and factory standard prior the cutting process. The
color of bulk production must fall within the agreed shade band. In case the shade
band is out of standard, factories to contact their dying mills for improvement. Should
there be extreme cases of shade variations, this will then be raised to QA manager
and Merchandise Manager for decision making or eventually to customers.
Mandatory test
1. The merchandisers need to make sure the fabrics and garments are tested before
cutting, according to the requirements of the customer.
19
2. Any failed results or concerns need to be discussed with QC and QAmanager
immediately.
20
+/- 3% tolerance for blends; No tolerance for
Fiber content AATCC 20/20A
single fiber
Fabric weight (g/m2) ASTM D3776 +/- 5% of specification
Garments with contact to skin < 75 ppm
Formaldehyde content JIS L 1041
Other garments < 300 ppm
Lead content (scrapable < 600 ppm
16 CFR 1500.3
surfaces only; children only)
Azoic Dyes Zero tolerance
Fabric inspection
21
1. We do 10% inspection of fabric as per receiving quantity making the fabric lot in various
stages, like:
a) Without Inspection. (Those are not yet started inspection)
b) Inspection running. (Inspection running but yet not finish)
c) Quality pass. (That means permitted for cutting)
d) Rejected lot. (Not permitted for cutting)
e) Held up. (Waiting for a decision from buyer side or supplier)
2. We inspect fabric by a 4-point system, where 20 points is our acceptable range.
3. Q.C inspects fabric and gives the report.
4. As per the inspection report, we take a final decision.
Blanket Making
For every style, washed or non-washed; we make a blanket to see the fabric shade &
variation of color. We mark rejected roll on that one, which is out of color standard. We
group the rolls as per shade wise to ensure shade wise cutting is possible.
22
Shade Band Making Method – Buyer Option
Shade band must be submitted before bulk production is started.
1. Each shade to be made two sets of leg panels for buyer approval.
2. Leg panel dimension is to be (8″Wx 16L″)
3. Whenever the hand sand/PP spray effects are presented in the standard, they should
be demonstrated on one side of the leg panels.
4. A pocket to be sewn on one side of the leg panel
5. Leg panel to be washed the same as the bulk washing
6. Achieve shade as close as the washing standard
7. Half/Cut leg panels are not acceptable for approval
For Example:
When AC is 70 cm & BD IS 72 cm
X =100x [2(70-72)/ (70+72)]
X =100x [2(-2)/ (142)]
X=100X0.028169
X=-2.8169(Acceptable, with intolerance)
When AC is 73 CM & BD is 69 cm
X=100x [2(73-69)/ (73+69)]
X=100x [2(4)/ (142)]
X=100×0.056338
x=5.
i) All incoming fabric including main fabric and trim fabric must be temporarily
quarantined to prevent their use before any required inspection and testing is carried
out.
ii) Testing and inspection must be carried out to the customer requirements.
iii) All factories need to complete the fabric inspection before cutting. No bulk production
can begin until the factory merchandiser / QC manager has signed off the completed
bulk fabric card and obtain approval.
Procedure
1) Select samples randomly according to the sample plans.
2) Four points system are to be used to define each sample which are acceptable or not.
24
3) Check the fabric quality characteristics against the fabric standard and product
specification.
4) Fabric construction
5) Color
6) Fabric width
7) Hand feel and finishing
8) Packing – fabric tickets, lot number, poly-bag and packing condition.
Knit:
Total points x 100 x fabric weight (g/m²) = points/ 100 sq.yds Sample weight (lbs) x 543
25
14. A thorough inspection should be done on every unit.
15. Don’t assume the lot is good or bad after inspecting only a few units. The whole
sample size must be thoroughly inspected before making a conclusion.
16. Check according to normal sampling plan.
17. If the 1st inspection failed. Go for 2nd inspection by the ‘tightened standard”
sampling plan.
18. Actual rolls checked should be marked or stamped with “PASS or QA APPROLAL”.
19. If the batch is rejected after 1st and 2nd inspections, 100% check to be carried out.
20. From 100% check, mark each approved roll with GREEN tape and stamp with
“PASS”.
21. Rejected rolls must be marked with RED tape and stored in “REJECT” area.
22. From the fabric inspection records, monitor the performance of each fabric supplier.
26
Responsibility
The QA manager is responsible for the implementation and maintenance of this procedure.
Fine Spinners technical staff is responsible to train the factories and monitor the correct
implementation.
Factory merchandisers should keep the fabric inspection report in the style files.
Factory should maintain 12 months record that is available to technical staff upon request.
The Pre-production meeting should be held to review all aspects of production after the PP
sample has been approved & sealed.
Line managers should attend this meeting which should be facilitated by the production
head and attended by the PP sample maker.
The meeting agenda should include style file checklist, production T & A plan, PP sample
and comments review, and other aspects of the manufacturing run which could impact
garments of the manufacturing run which could impact garment Quality and delivery.
The factory’s in-house documentation/is also acceptable.
A pre-production meeting must be held before cutting to review the all production
specifications and set up action plan to load the new style into the production lines.
29
The following information must be available for the meeting to take place:
1) Correct size set Garments made in bulk quality fabric and trims, 2 pieces per fit sample
size.
2) Approval sample
3) Technical specifications with operation breakdown
4) Size charts
5) Bulk trim card
6) Approved patterns
There will be group discussions on all aspects of manufacturing the new garment and any
potential problems highlighted (Risk assessment)
a) Status of preparation works including pattern, grading, maker
b) Shortages of raw materials
c) Color continuity of fabric and trims
d) Front & back side of fabrics to avoid wrong cutting
e) Lay plan and any special cutting requirements
f) Special operator skill required
g) Special machinery requirements
h) Line planning / Line balancing to ensure to enable correct amount of operators and
machinery requirement to fulfill production flow plan.
i) Folding and Packing methods
All quality points and action plan must be recorded on the Minutes of Pre-Production
Review.
The representative of the factory needs to sign the attendance form and keep a copy for
future reference.
The PPR-meeting is the last chance to avoid major mistakes in production.
Make mock-ups to double check before production starts.
Visual standards will be signed off and provided to production line as reference.
30
c) QC checks each operation of the first 20 pieces of complete garments coming off the
line.
In-Line inspections
a) During continued production the frequency depends on the total order quantity and
the number of color-ways.
b) QC will use Traffic light system and 7/0 audit procedure to monitor quality progress in
every operation.
c) In any case, there should be at least complete inspection per style per week.
Pre-Final inspection
a) Done when the sewing is finished or almost finished and 10% of the goods are
packed.
b) Crucial to avoid any last minute problems.
Final inspection
a) When sewing is 100% finished and the packing is 95% completed.
b) Do not load goods in the container before the final inspection is finished.
c) No style can go ex. factory before buyer QC confirms “shipment release” on the
inspection forms.
d) Final inspections should be held during normal working hours.
Sewing thread
31
a) Thread - ply/cotton or spun polyester. MONOFILAMENT THREAD IS UNACCEPTABLE.
b) Thread count should be appropriate for end use
c) All threads must match the fabric color (unless otherwise advised)
d) Thread must be colorfast.
Seam finish
a) Stitch density 10-12 stitches per 1" or otherwise specified in buyer tech pack
b) Thread tension of all threads must be correctly adjusted to give a neat and balanced
stitch formation. Seams must not "grin".
c) Stitches must not crack when seams are stretched.
Buttons
a) To be colorfast under prescribed care instructions.
b) To be attached using threads color to match button.
c) No loose thread ends.
Keyhole buttonhole
Should be used on all heavier weight constructed garment
Buttonholes
a) Stitch density to be a minimum of 50 stitches per 1".
b) Buttonhole stitching bite 2 mm.
c) Buttonhole must be cleanly cut and all threads to be trimmed.
32
d) Buttonhole size must be sufficient to allow buttons to pass through readily. Normally
button diameter + 1/8" but for high button + 1/4"
33
General
a) Button and buttonhole must be positioned so as to prevent gaping of closure when
fastened.
b) Button and buttonhole positions must coincide.
c) Use removable chalk to mark button position. DO NOT USE WAX PENCIL.
d) Button to be positioned in the end of the horizontal buttonholes.
e) Button to be positioned central to vertical buttonhole. The first button may be required
to be positioned in the end of the buttonhole if used as a positional aid, to ensure
consistent alignment.
Waistbands
a) All waists to be suitably constructed and interlined if applicable to prevent band
bucking or rolling over
b) Ends of waistband to be bagged out or neatly concealed ensuring minimum bulk
c) Always use color fast elastic if applicable
d) Fuse on waistband to prevent the see-through problems of white elastic bands.
Slide Fasteners
Zip tape, zip head and stopper to match body color.
Darts
a) To be plain machined and run off gradually to avoid puckering at end of the dart
b) Dart to be backstitched at the point
34
b) Tack at the side seams or otherwise specified in buyer tech pack.
Fell hems
a) Raw edge to be over-locked then blind stitched. Minimum hem width 1" or otherwise
specified in buyer tech pack.
b) Blind hemming thread must match body color
c) Blind hemming machine must be correctly adjusted to ensure hemming thread is not
visible on fabric surface.
d) Stitching must be securely caught to prevent unraveling
e) Stitch density - 4 stitches per 1". SKIP STITCH IS NOT TO BE USED
f) Tension to be correctly adjusted so as to prevent snagging during wear.
Piping
a) Piping must not be puckered, garment to be edge-stitched as close as possible to piping
where appropriate
Embroidery
a) Select appropriate backing on embroidery parts
b) NO BURNING MARK AROUND THE EMBROIDERY WILL BE ACCEPTED
c) Clean the chalk marks and oil stains.
Collar make
a) Top collar (unless otherwise specified) should have a suitable fusible interlining
attached by using a suitable fusing press to ensure uniform temperature and pressure.
b) Fused collars should withstand 50 washes without evidence of bubbling.
c) Collar should be made by a plain sewing machine using a template to either pre-mark
the required shape or stitch around.
d) When collars are bagged out, care must be taken to ensure points are fully turned
through without breakouts occurring. Collars must be carefully pressed to set shape.
e) Collar top stitching or under collar stitching must ensure that the collar seam does not
roll out and show on the top of the collar.
Collar attachment
a) Collar should be quartered for shoulder seam and back neck alignment.
Collar balance from shoulder to neck edge has a maximum tolerance of 5mm
b) Where no back neck facing is used, top collar is to be turned under and plain
machined down, or bound to conceal all raw edges.
c) Over lock edges are unacceptable.
d) Collar stand must align and be level at the centre front neck edge.
35
e) Collar must cover the collar attachment seam when rolled at the back neck. In two
piece collars the collar will normally be 5mm deeper at the back than the collar stand
at the back neck.
f) There should be a gap at the collar front neck to allow the collar peaks to roll over and
sit properly. This gap should not exceed 5mm.
36
17. QC Check Points
Cutting process
1. Fabric upside down: Make sure the fabric is not upside down.
2. Relaxation: Before cutting, knitted & elasticized woven fabrics should be
suitably relaxed for around 12~24 hours, depending on the type of fabric.
3. Height of cutting pile: The higher the pile on the cutting table, the more chance the
cut pieces are un-equal in size. This can lead to size spec- & fitting problems. Make sure
the height is suitable for the type of fabric (usually 2~3 inches and never more than 5
inch).
4. Numbering: Make sure the different parts are properly numbered to avoid shading and
that this numbering can be easily removed after sewing is complete.
5. Storing: Make sure the different parts are properly stored, for example rolled, and not
folded.
Sewing process
1. Critical operations: Check all critical operations repeatedly (like the sewing of neck-
seam, armhole, cuff, placket etc.), so the operator gets clear input of what is required
and how to make it correctly, before large quantities of garments are finished.
2. Seam allowance: check operators repeatedly on this point to make sure they use the
correct seam allowance.
3. Numbering: Make sure the sewing operatives keep parts with the same number
together to avoid shading.
4. Check Buttoning:
a) Snap button too loose / too strong
b) Snap button not closing properly / broken
c) Missing poly washer for snap buttons
d) Button coming off
e) Fabric not strong enough to hold the button
f) Mark from molding
g) Paint damaged
h) Rust
i) Text on button not straight
j) Wrong position / not in line with counterpart / incorrect spacing
k) Button shank missing when required
l) Button hole too big or too small
m) Buttonhole not clean / badly stitched / loosing shape / stitched with wrong thread
quality
n) Spare button missing or put in wrong position
5. Check Pressing
a) Shinny marks
b) Not pressed or improperly pressed
c) Should avoid press and fold the pigment dyed fabrics before garment washing
entirely. It is because it will leave a clearly visible mark on the garment after
washing. After sewing, put the garments on a hanger until washing starts.
37
18. Spreading & Cut Part Inspection
Spreading
The Quality Control Inspector should check the work of each spreader for the following
1. Placement of Marker: Check and verify so that the marker is sited on the range with the
brink matching to the selvage of the piece goods. Also, you need to confirm that all cut
pieces will be finished properly.
2. Shading: A control system should have for checking of shading if all parts are ply marked.
3. Table Marks: The spreading table should be marked so check the table marks and do not
allow any splices.
4. Markers: Make sure that there are no makers with creased or overlapped parts in the
markers.
5. Splices: After spreading is finished then check the splice laps that both plies extend past
the marked splice by less than 1/2 (half) inch and not more than 1 (one) inch.
6. Narrow Goods: After completion of the spread, check the “far edge” of the spread to see
that all plies extend beyond the marker line.
7. Tension: Check tension during spreading. This is very important on knit fabrics
8. Count: Check the count after completion of spreading, and before cutting. Count all plies
at both ends. There is no tolerance.
9. Leaning: Check carefully to ensure that one edge of the fabric is square to the tabletop.
Visually inspect the alignment of the edge with the tabletop.
Record spreading defects by the number of defects found for each checkpoint. For fabric
utilization purposes, the sample form includes columns for edging end and remnants.
Calculate the defect rate for the spreader by dividing the number of defects found by the
height.
Cutting
The quality control inspector should check each cutter at a 2.5 acceptable Quality Level (A.Q.L)
based on the number of parts being cut.
1. Pattern Check: Compare the pattern to marker paper to ensure that the marker
is correct.
2. Miscut: Check for miscut or the failure of the cutter to “split the line “Tolerance is 1/16”
Report all defects for miscut to the cutting foreman (Supervisor)
3. Matching Plies: check the top ply with the bottom ply. Compare both to a hard pattern or
the paper marker Comparison to a hard pattern is best. Tolerance is +/- 1/8”. Report each
defect found to the Cutting Supervisor).
4. Rugged Cutting: Check for rugged cutting according to the standards for your product.
This is a judgment defect. It is more important on critical parts if the part has to be recut.
5. Notches: Check the notch location by placing the pattern over the top ply. Tolerance is +/-
1/8″ If the notch is more than 1/8″ off. Contact the cutting foreman (Supervisor).
a) Record cutting defects on a cutting quality control form along with the number of
bundles examined. To calculate the defect rate for cutting, divide the total defects found
by the number of bundles checked.
b) Often changes are made to patterns to adjust for production problems. Some
factories make such changes on the pattern and/or marker for the cutter to correct. Do
not allow such a policy. Preventive measures are the best control for quality. Make a
new pattern with the correction.
38
c) All factories are required to conduct the cut part inspection. The cut part inspection is
necessary to maintain the correct measurements of the garments.
The responsibility for the implementation and maintenance of this procedure lies jointly
with the following departments:
1. QA Manager
2. Cutting room manager
3. Production or factory Manager
Procedure
1. Marker approved customer pattern piece with tolerance to be signed by Quality
manager.
2. All pattern pieces must be mounted on cards per size per style.
3. Place mounted pattern and check TOP, MIDDLE, BOTTOM plies.
4. Check 30 % of every batch. Ensure all sizes are inspected.
5. Count plies and ensure complete bundle.
6. If pieces are not within tolerance, call Quality Manager immediately.
Responsibility
QA manager to ensure this procedure is adhered to.
QA manager & garment technologist to check the fusing test specification report every day
at the close of business.
Procedure
Factory’s fusing test specification report must be available for reference (in close proximity
to the fusing machine) for the following:
a. Fabric details
b. Recommended interlining
c. Recommended fusing conditions
d. Speed time
e. Pressure and temperature
f. Results after wash
4. The inspection procedure should be systematic and include steps to check styling,
material & color combinations
a) Compare the production sample to approval sample
b) Check the production sample to fabric and trim cards
c) Color assessment – check dye lot variation
i) Check size specification - Conformity to size specification
ii) Functional check - Check if the product is suitable for its intended purpose by
wearer trial. Try the garment on a dummy if available. This fit check is very
important, because this is exactly what the consumer is doing in the store. Check
the buttoning, bar tacking and buttonhole to ensure the fitness of the products.
iii) Workmanship checks - Visual examination for workmanship. Check each piece
carefully at inside & outside for any possible defects.
iv) Workmanship Inspection Report - List comments on all points of
workmanship which do not meet required standards and suggest the corrective
actions.
v) Measurement check report - A full measurement report on 3 pieces in each
size.
5. If a measurement falls outside the zone of tolerance it is circled. This report must be
filed at the front of the QC file.
42
6. QC should share the failed inspection reports to the attention of the QC manager no
later than 1 day following the inspection.
7. QC manager should discuss with merchandising if the problem cannot be rectified.
43
22. TOP / Rack Samples / Shipment Samples
The customers have their specific requirements for TOP samples.
Different customer may use different terminology such as rack samples/ shipment samples/
gold seal samples but the submission procedure is more or less the same.
FCQA or Buyer QA is responsible for checking the samples and should follow-up on the
prompt delivery to buyer merchandisers.
All “keep” TOP samples and QC reports will be kept by merchandisers.
If there are multi shipments for the same style, a new TOP sample is required per each
shipment.
Availability of TOP sample before Final inspection
Merchandiser must obtain TOP Samples from the factory before they can arrange the final
inspection.
QA manager will check with Merchandisers if the customers have signed off the TOP
Samples.
44
45
23. Garment Washing & Finishing
The washing process directly affects the quality of the washed garment. It must be
ensured that these processes are carried out under a controlled condition. Customer,
merchandising, suppliers, washing plant and QC should work together to agree a standard
for this controlled condition.
QA manager & Merchandiser should guide the fabrics QA & washing manager to fulfill all
approval processes. This includes:
Fabric quality
a) Yarn count and yarn spinning method
b) Construction: number of ends and number of picks
c) Fabric quality grade: number of defectives in 100 sq. yard and yarn quality
d) Dyeing method
Washing quality
a) Washing method: normal wash, stone wash, sand wash or enzyme wash
b) Bleaching method: stone bleach, garment bleach
c) Any special process. E.g. over-dye after washing process
d) Color tone of the blue yarn
e) Whiteness of the white yarn
f) Resultant color tone: bluer or yellowish
g) Rubbing effect: contrast on the blue yarn and white yarn
h) Evenness on the blue and white parts
i) Hand-feel
24. Finishing
After receiving from sewing line or washing room, we start finishing procedure by
1. Thread Shaking (Blowing) - For removing the loose thread & number sticker
garments we use thread shaking machine.100% garments go finishing area through
the thread shaking action.
2. Pressing - Covering all sizes & colors to see the workmanship & measurement then
if wash program to check wash standard/hand feel/any wash defect by wash unit.
3. Depending on the recommended pressing method & pressing standard, we have
steam irons and/or legers or toppers. We use the iron shoe to avoid the shining
mark.
4. Trimming - Is the most important thing in quality issues. For that, any lot with
trimming problem is rejected for corrections by line production/quality team. We
don’t allow tread end over 3 mm. We should take care of trimming throughout the
stitching process.
5. Inside Checking if approved in layout - A large quantity of Q.I check 100%
garments, process-wise in the side of garments. They ensure that no defect & uncut
thread inside of the garments. For every Q. I give their personal Q.C pass number
inside of the pocket.
6. Preliminary Top Side Checking - In finishing section Q.I person checks 100%
garments, the process-wise top side of garments. They ensure that no defect &
uncut top side of the garments. For that every Q.I give their personal Q.C pass no
inside of the pocket.
7. Final Checking - After preliminary pressing Q., I person check the topside of whole
garments. They ensure that no defect, spot & uncut thread top side of the garments.
For that every Q. I give their personal Q.C pass no inside of the pocket.
8. Measurement Check - 100% of garments should a measurement before packing.
Measurement defects garments should not advance for packing. Defect means out of
tolerance, if it can rectify, it will be corrected, re-measured & packed otherwise it will
be count as a reject.
9. Re-pressing - Is needed to recovering the damage by Q.C handling. We do this for
an attractive outlook.
47
10. Metal Detection - There is no perfection to enter any okay garments without metal
detector machine checking. We sent all okay garments to the packing section
through the metal detector machine. The packing section is isolated by the
gatekeeper system. Our detection standard is 1.0 mm diameter sphere of ferrous
metal. We keep a 100% record of metal detection.
11. Ratio / Solid pack Checking - Before seal, the carton Q.C check the packing sizes
is as per buyer requirement. For non scan pack orders, if packing is okay Q.C gives a
sign inside of the carton, then the carton should seal in front of Q.C. For scan pack
orders, if packing is okay Q.C gives for 100% GT scanning then the cartoner should
sign inside of the carton before sealing it.
12. Packaging - Carton & poly bag measurements are ensured by the first production.
48
25. Random inspection method
Uses the AQL (Acceptable Quality Level) random sampling plan for quality audit of
customer’s products.
It is based on the ISO 2859 / BS 6001 / DIN 40080 / ANSI/ASQC Z1.4 (MIL-STD-
105E) sampling procedure.
This is a random sampling inspection method and is the most widely recognized
method of sampling by attributes based on the mathematical theory of probability.
Key definitions
1. Audit - The inspection and examination of products to ensure compliance to
requirements
2. Lot / batch - Group of items for inspection.
3. Defect - A deviation from requirements.
4. Defective - A unit of product that contains one or more defects.
5. DHU (Defects per Hundred Units) - The quality of any given quantity of product is
expressed either as the percentage defective or as the number of defects per
hundred units.
6. Sampling plan - A specific plan that indicates the sampling sizes and associated
has acceptance or no acceptance criteria to be used.
7. Accept Number - The maximum number of defects allowable in a sampling lot for
the lot to be acceptable
8. Rejection number - The smallest number of defectives (or defects) in a sample or
samples under consideration that will require the rejection of the lot
9. Classification of defects - The listing of possible defects in a unit, classified
according to their seriousness e.g. critical, major & minor
10. Acceptable Quality Level (AQL) - In a continuing series of lots, Acceptable
Quality Level is a quality level that, for the purpose of sampling inspection, is the
limit of a satisfactory process average.
Acceptable quality level is the 'only just acceptable' quality, i.e. the minimum
quality that can be considered acceptable as the average quality level of the
production.
However, the designation of an AQL does not imply that the manufacturer has
the right to knowingly supply any defective product.
49
26. AQL Tables
26.1 Workmanship
26.2 Measurement
50
26.3 Packing
51
27. Pre-Final & Final inspections
27.1 Pre-Final Inspection
There is an in-house pre-final audit for self-confirmation, done by the internal quality
auditor.
He audits by 2.5 AQL then after receiving the Q.C pass report we offer for a final
inspection.
Our AQL chart is shown as below.
To ascertain that the quality level of a bulk order is acceptable for shipment, inspections
are completed on all orders to ensure that the quality of the bulk production is as agreed at
approval sample stage.
53
Classification of defect – Labeling and Packaging
LABELLING AND PACKAGING
Responsibility
The responsibility for the implementation and maintenance of this procedure lies jointly
with the following departments:
a) Line & finishing supervisors
b) Production Manager
c) Factory QC Manager
Procedure
a) Manufacturers should use conveyor type metal detectors to scan all products.
b) The metal detection can ensure all packed goods contain no extraneous metal
objects.
c) Manufacturers should maintain calibration and metal contamination logbooks for the
past 12 months.
Calibration of the metal detector
1. Put a 1.2 mm steel ball through the aperture of the metal detector.
2. Put the steel ball through the top/ middle/ bottom and left/ centre/ right of the
aperture, this is known as the 9-point sensitivity test.
3. Conduct the 9 point sensitivity test before start metal detection or every 2 hours when
the machine is in use.
54
Method of metal detection
- Do the metal detection twice in two orientations.
- FCQA must put the random sample through the metal detection before doing open the
poly-bag for inspection.
QC completes the Metal Contamination Log Sheet by each style. QA should keep the
finished record in the QC file.
55
e) The following is the list of the critical measurements:
For tops:
Chest/ bust Across shoulders Hem/ Sweep Garment length
Across Front Across Back Sleeve length Sleeve opening
Armhole Neck width Neck Drop
For Bottoms:-
Waist relaxed High hip Low hip Thigh
Inseam Out seam Front rise Back rise
Leg opening Hem / Sweep
Example 1:
An order with 8 sizes and 5 colors,
The random sample is 1 units X 8 sizes X 5 colors = 40 units.
Example 2:
For the order with 8 sizes and 2 colors, apply the rule of “At least measure 3 units for each
size’ here.
The random sample is 3 units X 8 sizes = 24 units, which include 2 colors.
Take the full measurements of 2 garments for each size. Measure the critical
measurements for the balance of the random sample.
Acceptance decision
The acceptance will be assessed by checking the conformity of measurements to the size
specification.
Pass – if all measurements of the random examples meet the specification.
Fail - if any measurement point is found out of tolerance.
2nd audit
1. If the first measurement check failed, it is required to check further on those
measurements which are out of tolerance consistently.
2. Draw a new random sample based on the AQL method, Single Sampling Plans, Normal
Inspection, Level I to decide the acceptance.
3. The acceptance of measurements is judged per color per size per measuring point.
4. Check the measurements of the particular color / size that were out of tolerance during
the 1st audit and make conclusion of acceptance accordingly.
56
Critical Non-Critical
measurements measurements
AQL 2.5 4.0
Sample Maximum allowable garment
Lot Size
Size Out of tolerance
281 - 500 20 1 2
501 - 1,200 32 2 3
1,201 - 3,200 50 3 5
3,201 - 10,000 80 5 7
57
Tolerances for Tops
This chart applies to shirts, blouses, dresses and coats
All measurements are Full measure or otherwise specified
Half measurements will be applied when checking the girth measurements.
These measurements are marked on the chart with (1/2)
All tolerances are plus or minus
58
Step 7: Functional check
a) Check if the product is suitable for its intended purpose by wearer trial.
b) Try the garment on a person, if not possible, use a dummy instead.
c) This fit check is very important, because this is exactly what the consumer is doing in
the store.
AQL procedure
A random sample is chosen for inspection according to a selected sampling plan with a
predetermined acceptable quality level (AQL).
The AQL for our products can be set at different level depending on the quality level of
each individual customer.
The sample lot will be checked piece by piece. The defects are marked and classified as
critical / major/ minor.
59
28. Classification of Defects
Defects in workmanship are classified as ‘Critical’, ‘functional’, ‘major’ and ‘minor’.
Critical – Anything that is likely to pose a safety hazard to the customer / end user, or not
comply with any mandatory regulations. The entire shipment is likely to be recalled or
returned to manufacturer that may also cause the product to be subject to legal
prosecution. Zero tolerance will be applied to the acceptable quantity of critical defects
found within a shipment.
Functional - Anything that is like to result in failure, or to reduce materially the usability
of the unit for its intended end use. A functional defect will in all probability result in the
customer with justification for non-purchase, returning the product for exchange or refund
thus affecting the customer or product reputation.
Major - Any obvious aesthetic non-conformity which adversely affects the appearance
including fit or customer satisfaction to a degree that would provide a discerning customer
with justification for non-purchase, returning the product for exchange or refund thus
affecting the customer or product reputation.
Minor - Any variation from the standard that is not likely to reduce the usability of the
product for its intended purpose. A minor problem may give a degree of consumer
dissatisfaction. Several Minor problems together may lead to the customer returning the
item.
60
Does not render the garment un-saleable but it will decrease value. For example, small
knots/ slubs in textiles.
The counting of “major defect” should include “functional defect” which is controlled by
AQL 2.5
The number of defectives will be recorded and compared with the AQL Table.
If the number of defectives falls within the permissible number in the specified lot size, the
shipment will be passed. If the number exceeds the permissible number, the shipment will
be rejected.
61
For example:
GIVEN: An order of 2,000 garments
AQL standard: AQL 0.65 for functional, AQL 2.5 for major and AQL 4.0 for minor METHOD:
ISO 2859, Single Sampling Plan for Normal Inspection – Level II Inspected unit: 125
garments
The shipment can be rated as “Pass” if the maximum allowable defectives are:
a) 7 major defectives which may include maximum of 2 functional defectives and
b) 10 minor defectives.
62
Fault categories and fault codes
Each fault code has been given a specific reference code. This is to simplify the
communication, recording and reporting of defect types.
Critical
Product Conformity
(Check against approved Sample and Specification)
Code Defect Classification
Loose components that could be considered to be choking
Z1 Critical
hazard
Any component with a sharp edge or point that could cut or
Z2 Critical
cause bodily harm to a customer
Loose stones in a garment that has been “stone washed”
Z3 Critical
and which is intended for a child
Drawstrings at the head or neck of a garment that is intended
Z4 Critical
for a child
Any other fault or defect that might cause injury to the end
Z5 Critical
user
63
Raw materials and Components
Fabric
Code Defect Zone A Zone B
F1 Cuts, holes, tears, Broken yarn Major Major
F2 Weight +/- 5% (knitwear) Major Major
F3 Handle / softness different to quality standard Major Major
F4 Print/Design different to specification Major Major
F5 Wash effect different to quality standard Major Major
F6 Fabric flaws, Barrie’, weaving faults, slubs longer than 2cm Major Minor
F7 Color bleeding Major Major
F8 Foreign particles caught into the fabric (contamination) Major Major
F9 Stop marks, broken / missing pick and fill in woven Major Minor
F10 Needle lines in a knitted fabric Major Minor
F11 Bowing or skewing of the fabric Major Minor
F12 Knot or repair that affects appearance of the fabric Major Major
F13 Dye spots that are obviously noticeable Major Minor
Trims – button, stud etc
Code Defect Zone A Zone B
T1 Defective, broken, cracked Major Major
T2 Not as design/ specification requirement Major Minor
T3 Omission of component Major Minor
Zippers
Code Defect Zone A Zone B
T6 Incorrect zipper type/size/color used Major Minor
T7 Zipper not auto-stop as specified Major Major
T8 Top or bottom metal clip stick out and form a sharp point. Major Major
T9 Invisible zipper showing due to improper stitching Major Minor
T10 Zipper end not securely finished. Major Major
T11 Zipper waving Major Minor
64
Aesthetics
Color
Code Defect Zone A Zone B
C1 Colour different to standard Major Major
C2 Shade bar Major Minor
C3 Shade parts (panel to panel) Major Minor
C4 Off approved shade band (tops to bottoms) Major
Appearance
Code Defect Zone A Zone B
G1 Impression marks, glazing, abrasion Major Minor
G2 Pleats visible, excess crease Major Minor
G3 Mould Major Major
G4 Infestation Major Major
G5 Dampness Major Major
G6 Excessive odor Major Major
Cleanliness and thread trimming
Code Defect Zone A Zone B
D1 Spot cleaning circle Major Major
D2 Dirt, chalk mark, oil stain over 0.5cm in diameter Major Minor
D3 Threads not trimmed over 3cm Major Minor
D4 Excessive quantity and length of loose threads Major Major
Printing
Code Defect Zone A Zone B
P1 Design or color different to specification Major Major
P2 Printing design not clear Major Minor
P3 Uneven printing (smudging) Major Minor
P4 Printing off registration Major Minor
P5 Cracking of print Major Major
Embroidery
Code Defect Zone A Zone B
E1 Design, size, color different to specification Major Minor
E2 Crooked, tight tension of thread Major Minor
E3 Uneven in shape Major Minor
E4 Not level Major Minor
E5 Off Position over 1cm Major Minor
E6 Omitted, incomplete Major Major
E7 Broken, loose stitch, unraveling Major Major
65
Construction
Layered Construction
(Pocket/ flap/ Zipper stand/ Placket/ Waistband/ Cuff/ Collar)
Code
Defect Zone A Zone B
A11 Top and bottom placket uneven in length by 3 mm+ Major Major
Sewing
4. Accepted
All sheets to be signed by factory QA manager, Factory manager and a copy of the SRL
passed over for release of shipment.
5. Reject
If the goods do not pass inspection, the QC Inspector cannot release the SRL to the
factory.
Without the shipment release letter, factories have no authorization to ship the goods
This report must be filed at the front of the case file within a maximum of 1 day following
inspection.
In case buyer QA needs to do confirmation, QC should fax or email the reports to the
attention of the buyer QA no later than 1 day following the inspection.
68
32. Closing Meeting after Inspection
Immediately following the FCQC inspection, QC will hold a meeting with factory quality &
production personnel to review the result of the inspection.
Inspection results
The QC inspector indicates the inspection results clearly on the QC reports.
Merchandising follows up with factory and /or customer if the shipment day is affected.
Passed
The shipment is released.
The Shipment Release letter will be released to factories.
Files can be returned to Merchandising after QA manager sign off copies of final inspection
report.
Rejected
In case the shipment is rejected, the factory management and QC have to agree a
corrective action.
Repairable
If possible the factory must repair the faults and a second final inspection be arranged.
If the goods can be repaired quickly or out sorted as only a small percentage
The factory will then proceed with this process immediately, and a 2nd final inspection
arranged.
Non-repairable
QC reports the case to QC manager and Merchandising
Merchandising advises customer to see if the defect can be accepted or not.
Merchandising follows up with the factory afterward.
Following is the possible outcome:
a) Customer takes in the goods with discount
b) Style cancelled and not replaced
c) Style to be replaced
69
Repairable but time not allowed for the same shipment date to be maintained
BUYER QC advises QA manager and the merchandiser of this situation
Merchandising follows up with the factory for a solution
Merchandising informs the customer of a late shipment and obtains their further
instruction.
Signatures
QC - must sign all copies once factory representatives signed.
QA Manager - must sign all summary sheets.
70
33. Shipment Release Procedure
Purpose
To ensure the shipment is released to the forwarders with proper QC inspector sign off on
final inspection report/Letter.
Scope
No shipment should leave the country without passing FCQC/Buyer QA inspection. All
related departments work closely together to ensure no faulty lot to be shipped to
customers.
Responsibility
FCQC issues Shipment Release Report/Letter when the shipment passes final inspection
The vendor has to present passed cargo to the forwarder.
The forwarder cannot take in any merchandise if the factory cannot present pass shipment
release evidence when they deliver the cargo to the forwarder.
Procedure
1. Issue of shipment release report/Letter - QC issues SRL if the final inspection is
passed.
2. Original copy - stays in the QC File
3. Give copy to the factory on site
4. Shipping Department should have access on passed merchandise latest within 2
working days after the inspection day
5. The vendor FCQC inspector, QA manager, Merchant & Factory manager should sign
the SRL at the factory
6. Shipping department to follow up the shipping processes with the forwarder.
7. Expenses related to shipment cancellation: The vendor is responsible for any
additional expenses related to shipment cancellations, due to failed inspections, late or
missing SRL’s.
8. Processing by the FORWARDER - the customer’s Forwarder should accept cargo, only
if vendor can present copy of the SRL to them. If goods arrive without such SRL, they
should contact our Shipping department for confirmation.
9. Failed inspections: In case the goods failed to pass final inspection FCQC will stop the
shipment at the factory. The shipping department will also notify the forwarder
accordingly to cancel the shipping booking and ask them not to accept the cargo.
71
72
34. 5S System
5S comes from 5 Japanese words and each of them starts with S.
These are Sort, Set in Order, Shine, Standardize, and Sustain.
5S
Japanese Seire Seiton Seiso Seiketsu Shitsuke
English Sort Set in Order Shine Standardise Sustain
Basic Concepts for 5S
S1 - Sort
Sort means to separate items according to characteristics and importance.
S2 – Set in Order
All items, sections, and areas are clearly identified by a label and everything should be well
organized.
Never mix/store two category items in one place.
If you keep all of your store materials in a planned order basis, then whenever required
that materials you can easily find out and get those materials.
S3 – Shining
Actually mean cleanliness.
All items/place of workplace Floors, walls, stairs, ceilings, Racks, cabinets, shelves,
Machines, equipment, tools, stored items, materials, products, and lighting everything
required to be kept clean.
All cleaning tools and materials are easily accessible.
Cleaning assignments are defined and are being followed by the checklist and hang
checklist on visible board.
Do periodical pest control to make sure there is no insect.
Cleanliness is not only a compliance issue but also this increase a healthy working
environment in the company.
S4 – Standardize
The first three steps of 5S are the key to implement 5S in the workplace.
This section is about visualization by Information displays, related SOPs, signs, color coding
and other markings are established everywhere in the factory
Do regular 5’s audit using a checklist, give & post rating to each area.
Need formal training, keep training records to approach towards improvement.
These standardizations increase the operating efficiency of the industry.
S5 – Sustain
This is to maintain 5S to be the way of life rather than just a routine.
Success stories are being displayed (before and after pictures) in every section of the 5S
board.
73
Give rewards and recognition is part of the 5S system to sustain 5S.
Advantages of 5S if properly implemented
74
Actions need to Implement 5S
75
SPINNING QUALITY PROCESS
Supervising operators sorting contaminated cotton and wastes that is to say foreign matter
CARDING
Testing of hank variation is done twice in a shift; 8 samples of meters each are taken from the carding
machine. The standard hank is maintained at 0.1200 and the weight should between 22.5-24.9g. If the results
do not suit to the required values the re-test is done and the machine is adjusted by inserting the actual hank
to correct to the required standard.
U% test neps and trash; the silver from the machine is put on the measuring slots of the uster tester 3
machine and the results are displayed on the screen and printed. If the results do not suit to the required
values suggestions to change flat bars on the machine for proper carding values. The U% standard is
maintained at 4.0%.
76
DRAW FRAME BREAKERS (1&2)
At this stage the process is the same with that on the carding but here hank variation is done after two hours
and, 10 samples of 5 meters each from the machine. The standard hank and the variations of the weight range
is the same. But the U% standard here is maintained at 3.0%.
LAP FORMER
Here we test for the lap weight and hank variation; range weight is between 68-70g/m. if the results do not
suit to the required values the machine can be worked on or the adjustment is done on draw frame breakers.
The standard hank is maintained at 0.0085.
COMBERS ( 1,2,3)
Testing of hank variation here is done once in a shift; 5 samples of 5 meters each are taken from the comber
machine. The standard hank is maintained at 0.1200 and the weight should between 22.5-24.9g. If the results
do not suit to the required values the re-test is done and the machine probably adjusted by the mechanics.
Testing of noil% is done once in a shift if the machine not disturbing the operator; 3 samples of noil and 3
samples of silver is collected from the machine and the percentage of average total weight of noil divided by
average total weight of silver is calculated. The standard of noil% is 18.00.
U% test neps and trash; the silver from the machine is put on the measuring slots of the uster tester 3
machine and the results are displayed on the screen and printed. The U% standard here is maintained at
3.0%.
The process is the same with that on draw frame breakers but here the range weight is between 26.4-26.8g
and standard hank is maintained at 0.110. If the results do not suit to the required values the machine is
adjusted by inserting the actual hank and the poor material is re-run and the process continues. The process
of testing the U% is the same with that on breakers but here the standard is 2.50.
SPEED FRAMES
Testing of hank variation is done once in a shift; 5 samples from 6 rovings and 15 meters being the length of
samples. The standard hank is maintained at 0.8500 and the weight should be between 10.40-10.70g. If the
results do not suit to the required values adjustment is done on draw frame finishers and the poor roving is
sorted out.
77
U% test neps and trash; the roving from the machine is put on the measuring slots of the uster tester 3
machine and the results are displayed on the screen and printed The U% standard is maintained at 3.3%.
RING FRAMES
Test of count variation is done once in a shift if there is no change of count; 10 samples from the machine are
put on the manual wrapper and 100 meters are wrapped to compute the actual count. If the results do not suit
to the required values adjustment of the machine is done and also attending to finishers and speed frames.
U% test neps and trash; the yarn from the machine is put on the measuring slots of the uster tester 3 machine
and the results are displayed on the screen and printed The U% standard is maintained at 9.5% for count
28CH and 30CH, 9.0 for count 24CH and 28KH is 11.0.
AUTOCORNER
Test of count variation is done once in a shift if there is no change of count; 10 samples from the machine are
put on the manual wrapper and 100 meters are wrapped to compute the actual count. If the results do not suit
to the required values adjustment is done on ring frames.
U% test neps and trash; the yarn from the machine is put on the measuring slots of the uster tester 3 machine
and the results are displayed on the screen and printed The U% standard is maintained at 9.5% for count
28CH and 30CH, 9.0 for count 24CH and 28KH is 11.0
Revised DATE:15/JULY/2022
Reason for revising is due to spinning quality process /knitting quality process/dying quality process
/printing and embroidery was not captured in the quality manual covering the entire factory process
78