S.NO Work Description Dimensions Rate Amount INR
1 Front wall 371 13.25 4916 275 1351900
2 Wall of big gate 37.25 3.25 121 275 33275
3 Front column 43 1 3 129 275 35475
4 Column footing 43 16 1.5 1032 275 283800
5 Plaster outside 371 10 3710 25 92750
6 Plaster inside 371 8 2968 25 74200
7 Back side wall 461 13.25 6108 275 1679700
8 Column 48 3 1 144 275 39600
9 Column footing 48 16 1.5 1152 275 316800
10 Fencing wire back 461 250 115250
11 Back side
12 Extra point 461 7.5 3457 10 34570
13 Brick work 461 3.75 1728 15 25920

14 Front wall brick work 461 3.75 1728 15 25920


15 Extra cement bag 114 5 570 390 222300
4331460
Right side boundary
wall
Boundary wall ride
1 side 260 13.25 3445 275 947375
2 Footing 16 2 23 736 275 202400
3 Beneath column 1 3 23 69 275 18975
4 Fencing & Angle 250 250 62500
Right & Left side
5 cement extra 40 5 200 390 78000
Extras point right side
6 brick wall 260 3.75 975 10 9750
7 Block work & groove 260 7.5 1950 15 29250
1348250
Left side boundarty
wall
1 Boundary wall work 207 13.25 2743 275 754256
2 Footing 16 2 18 576 275 158400
3 Column 1 3 18 54 275 14850
4 Fencing wire & angle 195 250 48750
5 Brick point extra 207 3.75 776 10 7760
6 Block groove 207 7.5 1552 15 23280
7 Wall extensions 50000
Extra for cement ion
8 plastic work 60450
Extra for exsisitng
9 PCC 10000
10 8000
1135746