REBOUND HAMMER TEST

PROJECT TITLE TK618 222 Sludge Filter Structure Renewal

STRUCTURE Measurement
Interpretive Fcu (N/mm2) Remarks
Slab (1ST FLOOR) Low High Average
SAMPLE NO 1
SAMPLE NO 2
SAMPLE NO 3
SAMPLE NO 4
SAMPLE NO 5
SAMPLE NO 6
SAMPLE NO 7
SAMPLE NO 8
SAMPLE NO 9
SAMPLE NO 10

Tested By : Approved By:


SUMMARY OF CONCRETE CUBE COMPRESSION TEST RESULT
TERM OF CONTRACT FOR CIVIL WORKS MAINTENANCE AT SABAH-SARAWAK GAS PIPELINE (SSGP) - 21-Jan-22
PROJECT TITTLE UPDATE ON
Area C

NO. LOCATION / STRUCTURE CONC. SLUMP CAST RESULT OF COMPRESSIVE STRENGTH TEST (N/mm2)
AREA ELEMENT GRADE DATE 7 DAYS TEST REPORT 14 DAYS TEST REPORT 28 DAYS TEST REPORT
TRIAL MIX
CEMENT
1) KP 215.4 GROUT 30 NONE 20-Dec-21 23.30 RFI-113 33.30 RFI-114 35.33 RFI-124
SHEET PILE

REMARK AND COMMENT - IF ANY

RECORDED BY CHECKED BY

Doc. ref.: SSGP/CWM(LLT)-CCT-01