NEUTRALIZER DUCTING SPECIFICATION

MODELS: IN & INS NEUTRALIZERS

The information in this document is confidential and intended solely for the addressee(s). Page 1 of 7
Disclosing, copying, or distributing is strictly prohibited.

Nitrex Metal Inc. | 3474 Poirier Boulevard, Montreal, QC H4R2J5 CANADA | T +1.514.335.7191 | F +1.514.335.4160 | nitrex@nitrex.com
Nitrex Metal Sp. z o.o. | ul. Jedności 48, 41-218 Sosnowiec POLAND | T +48.32.296.66.30 | F +48.32.296.66.20 | nitrexeurope@nitrex.com
NEUTRALIZER DUCTING SPECIFICATION

TABLE OF CONTENTS
1 SAFETY INFORMATION .................................................................................................... 3
2 INS NEUTRALIZER DUCT DIAMETERS ........................................................................... 3
3 INS EXHAUST CONFIGURATION ..................................................................................... 4
4 IN EXHAUST CONFIGURATION ....................................................................................... 5
5 NEGATIVE PRESSURE ..................................................................................................... 7

The information in this document is confidential and intended solely for the addressee(s). Page 2 of 7
Disclosing, copying, or distributing is strictly prohibited.

Nitrex Metal Inc. | 3474 Poirier Boulevard, Montreal, QC H4R2J5 CANADA | T +1.514.335.7191 | F +1.514.335.4160 | nitrex@nitrex.com
Nitrex Metal Sp. z o.o. | ul. Jedności 48, 41-218 Sosnowiec POLAND | T +48.32.296.66.30 | F +48.32.296.66.20 | nitrexeurope@nitrex.com
NEUTRALIZER DUCTING SPECIFICATION

1 SAFETY INFORMATION

Careless operation will result in serious injury or death. Operators and maintenance personnel
should read and understand the operation manual prior to any operation, inspection or
maintenance.

This Equipment operates This unit contains electrical


with flammable gases. components that operate at
Ensure gas manifold valves high voltages. Before
are shut off prior to maintenance or attempting any maintenance or servicing,
servicing. be sure to power off the unit.

2 INS NEUTRALIZER DUCT DIAMETERS


For the INS Neutralizer a minimum of 8” (200mm) duct should be used for exhaust.

Burner Size Air Draw (cfh) Chimney Diameter Max Thermal Output

cfh m3/h (inch) (mm) btu/hr kW


INS15 320 9.1 8 200 29000 8.5
INS30 448 12.7 8 200 41000 12
INS50 618 17.5 8 200 58000 17
INS75 760 21.5 8 200 72000 21

The information in this document is confidential and intended solely for the addressee(s). Page 3 of 7
Disclosing, copying, or distributing is strictly prohibited.

Nitrex Metal Inc. | 3474 Poirier Boulevard, Montreal, QC H4R2J5 CANADA | T +1.514.335.7191 | F +1.514.335.4160 | nitrex@nitrex.com
Nitrex Metal Sp. z o.o. | ul. Jedności 48, 41-218 Sosnowiec POLAND | T +48.32.296.66.30 | F +48.32.296.66.20 | nitrexeurope@nitrex.com
NEUTRALIZER DUCTING SPECIFICATION

3 INS EXHAUST CONFIGURATION

A vent hood and chimney must be installed 2” (50mm) above the INS Neutralizer. The vent
hood must be 2” (50mm) larger than the top of the neutralizer on all sides, see the chart below
for vent hood sizing.
Neutralizer Vent Hood
Burner Size Dimensions
L (inch) L (mm) W (inch) W (mm)
INS15 18.6 472 18.7 475
INS30 20.4 518 20.6 522
INS50 22.4 568 22.5 572
INS75 22.5 572 26.8 682

The weight of the chimney and vent hood is not to be supported by the neutralizer. At no time
should the chimney run horizontally; if bends are required reduce losses by using 30 degree
elbows.

*For proper operation of the neutralizer please avoid negative plant pressure

The information in this document is confidential and intended solely for the addressee(s). Page 4 of 7
Disclosing, copying, or distributing is strictly prohibited.

Nitrex Metal Inc. | 3474 Poirier Boulevard, Montreal, QC H4R2J5 CANADA | T +1.514.335.7191 | F +1.514.335.4160 | nitrex@nitrex.com
Nitrex Metal Sp. z o.o. | ul. Jedności 48, 41-218 Sosnowiec POLAND | T +48.32.296.66.30 | F +48.32.296.66.20 | nitrexeurope@nitrex.com
NEUTRALIZER DUCTING SPECIFICATION

4 IN EXHAUST CONFIGURATION

IN Neutralizers have a flange where the chimney is to be attached. The ducting and flange size
change with the unit size, please see the table below for more details.

Air Draw Chimney Max Thermal Neutralizer Flange Dimensions


Burner Diameter Output
Size Bolt Hole Nitrex Part
cfh m3/h inch mm btu/hr kW OD ID
Pattern Size Number
IN40 920 24 8 200 48000 14 300 250 275 8x10mm IN_P_002460
IN75 1310 37 8 200 75000 22 300 230 275 8x10mm IN_P_002460
IN150 2540 72 10 250 154000 45 350 282 325 8x10mm IN_P_002507
IN300 4940 140 12 300 280000 82 400 330 375 8x10mm IN_P_000342
IN500 8550 245 16 400 451000 132 470 400 440 8x10mm IN_P_000100
IN750 12900 365 16 400 676000 198 510 440 480 8x10mm IN_P_002240
IN1000 17700 500 18 450 900000 264 540 470 510 8x10mm IN_P_002043

The information in this document is confidential and intended solely for the addressee(s). Page 5 of 7
Disclosing, copying, or distributing is strictly prohibited.

Nitrex Metal Inc. | 3474 Poirier Boulevard, Montreal, QC H4R2J5 CANADA | T +1.514.335.7191 | F +1.514.335.4160 | nitrex@nitrex.com
Nitrex Metal Sp. z o.o. | ul. Jedności 48, 41-218 Sosnowiec POLAND | T +48.32.296.66.30 | F +48.32.296.66.20 | nitrexeurope@nitrex.com
NEUTRALIZER DUCTING SPECIFICATION

Temperature of the effluent gas close to the neutralizers can be between 500 – 600°C (932-
1112°F) at max ammonia flow. However, because of additional stack cooling air entering the
stack at connection point will keep the stack temperature lower.

Due to the high temperature, the ducting for the IN-Neutralizer should be double walled
stainless steel for the first 10 feet (3m), with signal walled sufficient for the rest. A minimum
wall thickness of 16 gauge (1.5mm) is recommended. Please refer to local code for any further
requirements.

It is strongly recommended that a removeable 3 feet (1m) section be included in the chimney.
This will make lifting the neutralizer much easier if required for maintenance.

The weight of the chimney is not to be supported by the neutralizer. At no time should the
chimney run horizontally; if bends are required reduce losses by using 30 degree elbows.
Chimney should have water guard (conical cap).

*For proper operation of the neutralizer please avoid negative plant pressure.

The information in this document is confidential and intended solely for the addressee(s). Page 6 of 7
Disclosing, copying, or distributing is strictly prohibited.

Nitrex Metal Inc. | 3474 Poirier Boulevard, Montreal, QC H4R2J5 CANADA | T +1.514.335.7191 | F +1.514.335.4160 | nitrex@nitrex.com
Nitrex Metal Sp. z o.o. | ul. Jedności 48, 41-218 Sosnowiec POLAND | T +48.32.296.66.30 | F +48.32.296.66.20 | nitrexeurope@nitrex.com
NEUTRALIZER DUCTING SPECIFICATION

5 NEGATIVE PRESSURE

Negative pressure occurs when there is a significant difference in air pressure between the
interior and exterior of the building.

In extreme cases this can result in the flame being pushed back through the neutralizer,
damaging equipment.

In the event that your facility experiences negative pressure; please consult your local experts
for recommendations.

Draft Dampers may be recommended on the exterior of the building to aid in pressure
balancing. In addition to these recommendations a draft hood should be installed downstream
from the equipment followed by an extraction fan mounted as close to the outlet as possible.

The extraction fan capacity should be capable of handling the air draw requirements listed in
tables 1 and 3 above as well as being able to provide a minimum of 3” SP (5.6mm HG). It is
advisable that a ducting specialist examine the extent of negative pressure you are
experiencing. In some cases a larger extraction fan may be needed.

The information in this document is confidential and intended solely for the addressee(s). Page 7 of 7
Disclosing, copying, or distributing is strictly prohibited.

Nitrex Metal Inc. | 3474 Poirier Boulevard, Montreal, QC H4R2J5 CANADA | T +1.514.335.7191 | F +1.514.335.4160 | nitrex@nitrex.com
Nitrex Metal Sp. z o.o. | ul. Jedności 48, 41-218 Sosnowiec POLAND | T +48.32.296.66.30 | F +48.32.296.66.20 | nitrexeurope@nitrex.com

You might also like