// question: 71304 name: ATC analysis determines the

::ATC analysis determines the::ATC analysis determines the{


~minimum MW transfer possible
=maximum MW transfer possible
~Both
~None
}

// question: 71305 name: ATC stands for


::ATC stands for::ATC stands for{
=Available Transfer Capability
~Additive Transfer Capability
~Avilable Total Capability
~None
}

// question: 71256 name: Big data process is categorized into data management and
data analytics
::Big data process is categorized into data management and data analytics::Big data
process is categorized into data management and data analytics{
=True
~False
~Can not be determined
~None of these
}

// question: 71276 name: Big data sources in SG generally fall into


::Big data sources in SG generally fall into::Big data sources in SG generally fall
into{
~electric utility data sources
~supplementary data sources
=Both
~None
}

// question: 71281 name: Data from Geographical Information System (GIS) is


::Data from Geographical Information System (GIS) is::Data from Geographical
Information System (GIS) is{
~Electric utility data
=Supplementary Data
~Both
~None
}

// question: 71282 name: Data from phasor measurement unit (PMU) is


::Data from phasor measurement unit (PMU) is::Data from phasor measurement unit
(PMU) is{
=Electric utility data
~Supplementary Data
~Both
~None
}
// question: 71260 name: Data management includes
::Data management includes::Data management includes{
~Data storage-data analytics
~Data analytics - Duplicating data
=Data storage-Data mining-Data integration
~None
}

// question: 71255 name: Data management is responsible for_______


::Data management is responsible for_______::Data management is responsible
for_______{
=mining the data
~managing the data
~examining the data
~None of these
}

// question: 71302 name: DIgSILENT is an acronym for


::DIgSILENT is an acronym for::DIgSILENT is an acronym for{
=DIgital SImuLation of Electrical NeTworks
~Discrete SImuLation of Electrical NeTworks
~Discrete SImuLation of Electronic NeTworks
~None
}

// question: 71262 name: Distributed intelligence is achieved by means of Sensors


and other monitoring...
::Distributed intelligence is achieved by means of Sensors and other
monitoring...::Distributed intelligence is achieved by means of Sensors and other
monitoring devicesin remote locations intended for long-term operation in the
field{
=True
~False
~Can not be determined
~None of these
}

// question: 71306 name: ETAP stands for


::ETAP stands for::ETAP stands for{
~Electrical Test Analyzer Program
=Electrical Transient Analyzer Program
~Electronic Transient Analyzer Program
~None
}

// question: 71263 name: IED stands for


::IED stands for::IED stands for{
~InternalElectronic Device
~Informational Electronic Device
=Intelligent Electronic Device
~None
}
// question: 71272 name: IEDs have event recording capability that can be very
useful for__________
::IEDs have event recording capability that can be very useful for__________::IEDs
have event recording capability that can be very useful for__________{
~protection
~metering
=post-event analysis
~None
}

// question: 71273 name: IEDs were introduced in the early


::IEDs were introduced in the early::IEDs were introduced in the early{
~1990
~2000
=1980
~1950
}

// question: 71267 name: In which of the following Big data process the data is
prepared for further ...
::In which of the following Big data process the data is prepared for
further ...::In which of the following Big data process the data is prepared for
further analysis{
=Data management
~Data Analytics
~both
~None
}

// question: 71294 name: In which type of simulation simulating multiple systems


with different time ...
::In which type of simulation simulating multiple systems with different
time ...::In which type of simulation simulating multiple systems with different
time steps, at the same time is possible{
~Real time simulation
~multi-domain simulation
=Co-Simulation
~None
}

// question: 71295 name: In which type of simulation time synchronization needs to


be used between ...
::In which type of simulation time synchronization needs to be used between ...::In
which type of simulation time synchronization needs to be used between continuous
time simulation and discrete time simulation systems{
~Real time simulation
~multi-domain simulation
=Co-Simulation
~None
}

// question: 71274 name: Integration of IEDs and proper analysis of fault data
will lead to
::Integration of IEDs and proper analysis of fault data will lead to::Integration
of IEDs and proper analysis of fault data will lead to{
~very short system restoration times after a blackout
~revenue losses of utilities will be minimized
=Both
~None
}

// question: 71292 name: MATLAB is


::MATLAB is::MATLAB is{
~Real time simulation
=multi-domain simulation
~Co-Simulation
~None
}

// question: 71299 name: OpenDSS stands for


::OpenDSS stands for::OpenDSS stands for{
=Open Distribution Simulation Software
~Open Discrete simulation software
~optimal Distribution Simulation Software
~None
}

// question: 71300 name: OpenDSS was released by


::OpenDSS was released by::OpenDSS was released by{
~Central power research institute(CPRI)
~Power grid corporation of india Limited(PGCIL)
=Electric power research institute(EPRI)
~None
}

// question: 71271 name: shift from RTUs to IEDs is evident due to the following
features of IED'S
::shift from RTUs to IEDs is evident due to the following features of IED'S::shift
from RTUs to IEDs is evident due to the following features of IED'S{
~Adaptability
~Fast Responce
=integration and interoperability
~None
}

// question: 71286 name: Simulation-based evaluation software has become a more


valuable tool for
::Simulation-based evaluation software has become a more valuable tool
for::Simulation-based evaluation software has become a more valuable tool for{
~power system planning
~power system designing
~power system analysis
=All of the above
}

// question: 71258 name: The basic building blocks for automation of power systems
is ______
::The basic building blocks for automation of power systems is ______::The basic
building blocks for automation of power systems is ______{
=Intelligent Electronic Devices
~Digital fault recorders
~Remote terminal units
~None
}

// question: 71259 name: The device incorporating one or more processors with the
capability to ...
::The device incorporating one or more processors with the capability to ...::The
device incorporating one or more processors with the capability to receive or send
data is known as______{
=Intelligent Electronic Devices
~Digital fault recorders
~Remote terminal units
~None
}

// question: 71269 name: The function of Intelligent Electronic Device is______


::The function of Intelligent Electronic Device is______::The function of
Intelligent Electronic Device is______{
~receive data
~send data
=receive or send data
~None
}

// question: 71261 name: The function of smart meter in building the smart grid
is_______
::The function of smart meter in building the smart grid is_______::The function of
smart meter in building the smart grid is_______{
~Measure electricity usage in real time
~Can send data to and from electric companies and their customers
~Allows companies to give consumers more information about their electricity
usage, and communicate current electricity prices
=All of the above
}

// question: 71296 name: The major benefit of co-simulation is the


::The major benefit of co-simulation is the::The major benefit of co-simulation is
the{
=separation of the modeling and simulation processes
~single solver to simulate multiple models
~Both
~None
}

// question: 71288 name: The SG concept involves


::The SG concept involves::The SG concept involves{
~integrated communications
~sensing and measurements
~advanced control
=All of the above
}

// question: 71257 name: Today’s energy utilities are confronted with which of the
following challenges
::Today’s energy utilities are confronted with which of the following
challenges::Today’s energy utilities are confronted with which of the following
challenges{
~uncertainties in energy demand
~capital cost for building new stations
~carbon gas emissions
=All of the above
}

// question: 71293 name: Two different simulation environments are combined to


create a collaborative ...
::Two different simulation environments are combined to create a
collaborative ...::Two different simulation environments are combined to create a
collaborative system with\ndata exchange between the two simulators{
~Real time simulation
~multi-domain simulation
=Co-Simulation
~None
}

// question: 71284 name: Which of the following are requirements needed to build
the big data analytic...
::Which of the following are requirements needed to build the big data
analytic...::Which of the following are requirements needed to build the big data
analytic foundation{
~Understanding the available data and the required data
~Organizing the Data
~Building trust in the data
=All of the Above
}

// question: 71287 name: Which of the following are the general simulation
Approaches
::Which of the following are the general simulation Approaches::Which of the
following are the general simulation Approaches{
~Multi-domain simulation
~Co-simulation
~Real-Time Simulation (RTS) and Hardware-In-the-Loop (HIL)
=All of the above
}

// question: 71275 name: Which of the following are the sources of data for Big
data analytics
::Which of the following are the sources of data for Big data analytics::Which of
the following are the sources of data for Big data analytics{
~PMU Data
~IEDS Data
~Smart meter Data
=All of the above
}
// question: 71279 name: Which of the following comes under Supplementary Data
::Which of the following comes under Supplementary Data::Which of the following
comes under Supplementary Data{
~GIS Data
~GPS Data
~Weather Data
=All of the above
}

// question: 71283 name: Which of the following Data require preparation before
being stored and ...
::Which of the following Data require preparation before being stored
and ...::Which of the following Data require preparation before being stored and
further analyzed for making decisions{
~Structured Data
~Semi-structured Data
~Unstructured Data
=Both Semi-Strctured and Unstrctured Data
}

// question: 71285 name: Which of the following is benifit of Big Data systems in
Energy Management
::Which of the following is benifit of Big Data systems in Energy Management::Which
of the following is benifit of Big Data systems in Energy Management{
~Increasing flexibility for power consumption
~Smart decision making
~Determining root causes of failures
=All of the above
}

// question: 71264 name: Which of the following is big data source in smart grid
::Which of the following is big data source in smart grid::Which of the following
is big data source in smart grid{
~electric utility data sources
~supplementary data sources
=both A and B
~None
}

// question: 71270 name: Which of the following is deployed extensively in power


systems automation ...
::Which of the following is deployed extensively in power systems
automation ...::Which of the following is deployed extensively in power systems
automation recently{
~Remote Terminal unit
=Intelligent Electronic Device
~Integrated Electronic Device
~None
}

// question: 71289 name: Which of the following is Example of multi-domain


simulation
::Which of the following is Example of multi-domain simulation::Which of the
following is Example of multi-domain simulation{
~Matlab
~Modelica
=Both
~None
}

// question: 71291 name: Which of the following is Example of Real time simulation
::Which of the following is Example of Real time simulation::Which of the following
is Example of Real time simulation{
=RT-LAB
~Matlab
~Modelica
~None
}

// question: 71277 name: Which of the following is in the category of Electric


utility data
::Which of the following is in the category of Electric utility data::Which of the
following is in the category of Electric utility data{
~PMU Data
~Smart meters Data
~IED's Data
=ALL of The above
}

// question: 71278 name: Which of the following is NOT the category of Electric
utility data
::Which of the following is NOT the category of Electric utility data::Which of the
following is NOT the category of Electric utility data{
~PMU Data
~Smart meters Data
~IED's Data
=GIS Data
}

// question: 71301 name: Which of the following is open source simulation software
::Which of the following is open source simulation software::Which of the following
is open source simulation software{
=OpenDSS
~Matlab
~DIgSILENT
~None
}

// question: 71266 name: which of the following is part of Data management


::which of the following is part of Data management::which of the following is part
of Data management{
~Big Data storage
~Big data mining
~Bid data integration
=All the above
}
// question: 71268 name: which of the following is responsible for managing and
examining the data, ...
::which of the following is responsible for managing and examining the
data, ...::which of the following is responsible for managing and examining the
data, making it a practical form for decision-making{
~Data management
=Data Analytics
~both
~None
}

// question: 71297 name: Which of the following is the popular standard to be used
in computer ...
::Which of the following is the popular standard to be used in computer ...::Which
of the following is the popular standard to be used in computer simulations to
develop complex cyber-physical systems{
=Functional Mockup Interface(FMI)
~IED
~RTU
~None
}

// question: 71303 name: Which of the following is world’s first power system
analysis software with ...
::Which of the following is world’s first power system analysis software
with ...::Which of the following is world’s first power system analysis software
with an integrated graphic single-line interface{
~ETAP
=DIgSILENT
~PSCAD
~None
}

// question: 71290 name: Which of the following mimics the behavior of a physical
system by running ...
::Which of the following mimics the behavior of a physical system by
running ...::Which of the following mimics the behavior of a physical system by
running its computer-based model at the same rate as the actual wall clock time.{
=Real-Time Simulation
~Co-Simulation
~multi-domain simulation
~None
}

// question: 71265 name: which of the following represents big data process
::which of the following represents big data process::which of the following
represents big data process{
=Data Management-Data Analytics-Decision Making
~Decision Making-Data Analytics-Data Management
~Analytics-Data Management-Decision Making
~None
}
// question: 71298 name: Which of the following tools supported by Functional
Mockup Interface
::Which of the following tools supported by Functional Mockup Interface::Which of
the following tools supported by Functional Mockup Interface{
~SimulationX
~Matlab
~Python
=All of the above
}

// question: 71280 name: Which of the following won't comes under Supplementary
Data
::Which of the following won't comes under Supplementary Data::Which of the
following won't comes under Supplementary Data{
~GIS Data
~GPS Data
~Weather Data
=PMU Data
}