GTP of 2mva Transformer
GTP of 2mva Transformer
Make
Type
Voltage
Creepage Distance
Current Rating
Insulation Level
Impulse
Power Freq.
35 Tank Pressure Test
Pressure
As per CBIP
Duration
36 Tank Vacuum Test
Vacuum
As per CBIP
Duration
37 Insulating Oil
10% excess oil furnished ?
Oil conforms to IS:335-2018
38 Marshaling Box
Weatherproof, suitable for outdoor YES
Degree of protection IP:55
39 Terminal Connection
H.V. Cable box
L.V. Bus duct
HV Cable Box shall be suitable for
LV Cable Box shall be suitable for
40 Max. Noise Level as per NEMA
Approx. Overall Dimension
41 Including Radiators & Conservator
42 Coolers and all Fittings
Height
Breadth
Length
43 Weight
Core and Winding
Tank and Fittings
Oil
Total Weight Including Oil
Cooling Motors, Tap Changer,
Fittings & Oil
44 Clearances (mm)
(a) Core and LV As per CBIP
(b) LV & HV As per CBIP
(c) HV Phase to Phase As per CBIP
(d) End Insulation clearances to
Earth As per CBIP
(e) Any point of Winding to Tank As per CBIP
45 Short Circuit Rating
HV As per IS
LV As per IS
Color Grade
46 Fittings & Accessories
Oil conservator with filler cap. drain
plug
Silicaand plain oil level
gel breather withgauge.
connecting
pipe & oil seal.
Air release
Pressure plugs.device Explosion
release
vent should be Double diaphragm
type.
Oil level gauge
indicator with maximum reading
pointer and
indicator with
electrically max. reading
separate pointer
contacts for
and electrically separate sets of
Thermometer pockets
release cock, shut-off valve on one
side and separate
Sampling sets
valve/Filter of contacts
valve with
threaded adopter (top and bottom).
Drain valve with threaded adopter
Jacking pads, handling and lifting
lugs
Cover lifting eyes
Bi-directional rollers and skids
Radiators
Two-grounding pads
housing control equipment and
terminal connections
Rating and terminal marking plates
Neutral bushing
HT cable end boxes
LT Side
Neutral CT
Routine Test To be Carried Out
1. Measurement of Winding
Resistance
2. Measurement of Voltage Ratio
3.
andMeasurement of displacement.
check of Phase Short Circuit
Impedance (principal tapping,
4. Measurement
when Applicable)of No load loss and
Current.
5. Measurement of Insulation
Resistance
6. Induced Over Voltage withstand
test
7. Separate Source voltage
withstand test.
8. Oil Leakage Test.
List of Accessories
Mandatory Spares
Gauranteed Particulars
IS 1180, Level-2
Outdoor
Copper Wound, Oil Immersed
2000 KVA
11 KV
0.433 KV
104.9 A
2666.8 A
50 Hz
3
Dyn11
Delta
Star
ohms (approx)
ohms (approx)
12KV
1.1KV
ONAN
+5% to -10%
75
28
5.00%
UPF 0.8PF
75
NA
28
3
CRGO
As per CBIP
As per CBIP
As per CBIP
As per CBIP
IS:335-2018
YES
IP:55
Cable box
Bus duct
as per NEMA
As per CBIP
As per CBIP
As per CBIP
As per CBIP
As per CBIP
As per IS
As per IS