BTQS 3034 – MEASUREMENT OF CIVIL


ENGINEERING WORKS

Method of Measurement –MyCESMM2


Lecture 1 EARTHWORKS

INTRODUCTION

6
 M o st En g i n e e r i n g p ro j e c t s  The main difference between
involved some kind of earthwork ie; earthwork and building works
there is either "excavation" to reduce measurement is that while explicit
the existing ground level or dimension are provided by the
'embankment" to fill to 'a new designer to measure building works;
platform level or both. most earthwork have to be measured
based on only spot l e ve l s o r c o n t
o u r sh ow n i n drawings and this
requires some visualisation on the
part of the Q.S.

1
METHOD OF EARTHWORK MEASUREMENT
7

 The volume of earthwork are usually determined by one of the


following common methods:·
(a) Spot level or grid method

(b) Sectional Area Method


i. By Triangulation iv. By Method Of Square
ii. Trapezoidal Rule v. By Planimeter
8
iii. Simpsons Rule vi. By Coordinates

What to do :
1. Determination Of Area.
2. Calculation Of Volume.

2
METHOD OF EARTHWORK MEASUREMENT
7

 The volume of earthwork are usually determined by one of the


following common methods:·
(a) Spot level or grid method

(b) Sectional Area Method


i. By Triangulation iv. By Method Of Square
ii. Trapezoidal Rule v. By Planimeter
8
iii. Simpsons Rule vi. By Coordinates

What to do :
1. Determination Of Area.
2. Calculation Of Volume.

3
9 Sectional Area Method - Use Coordinates

3
To be filled in:
To be filled in:
Average cut
82.35 + 55.80
= 138.15 Average fill
2 0.30 + 4.72
= 69.07 = 5.02
2
= 2.51

Average fill x distance


Average cut x distance
= 2.51 x 8.00 = 20.10
= 69.07 x 8.00
= 552.60

Total all answer on each


gridline to get total
Repeat all stages for volume of cut / fill
other gridline

Tabulate answer of Calculate average area of all Multiply with distance


all gridline into between gridline
gridline
volume tabulation
THANK
YOU!