You can calculate manufacturing lead times for one item, a range of items, or a category of
items. The calculation updates the lead time attributes of all manufacturing items that you
include, regardless of whether you manually maintain an item's lead times. Lead-time for
items with network routings is calculated using only resources on the primary path.
Prerequisites
You must define a bill of material for the parent item and its member items for which
lead time is to be calculated.
You must define a routing for each item that will be used in the lead time
calculation.
You must define a lead time lot size for the parent item for which lead time is to be
calculated.
In this topic, you will calculate lead times.
Additional Information
Procedure
Step Action
1. Begin by navigating to the Calculate Lead Times page.
Step Action
5. Click the M1 Seattle Manufacturing list item.
or Press [Alt+O].
7. Use the Submit a New Request page to enter a single request or a set.
Step Action
8. Click the OK button.
or Press [Alt+O].
9. Use the Calculate Lead Times page to enter the request name.
Step Action
10. Click in the Name field.
11. Enter the desired information into the Name field. Enter "Calculate
Manufacturing Lead Times GUI".
12. Click in the Parameters field.
13. Use the Parameters page to enter the parameters to calculate manufacturing lead
times for the item.
Step Action
14. Accept the default value of Specific in the Item Selection field.
16. Use the System Items page to enter the name of the item.
Step Action
17. Click in the Item field.
Step Action
18. Enter the desired information into the Item field. Enter "RT_Routing".
19. Click the OK button.
or Press [Alt+O].
20. Click in the Date field.
21. Enter the desired information into the Date field. Enter "04-DEC-2004
10:16:26".
22. Click the OK button.
or Press [Alt+O].
Step Action
23. Click the Submit button.
Step Action
24. Use the Decision page to note the request ID. You can also submit another
request.
25. Click the No button.
or Press [Alt+N].
26. Use the Navigator page to access the Find Requests page.
Step Action
27. Click the View menu.
or Press [Alt+V].
Step Action
28. Click the Requests menu.
29. Use the Find Requests page to enter the request ID.
30. Click the Specific Requests option.
32. Enter the desired information into the Request ID field. Enter "5596472".
33. Click the Find button.
or Press [Alt+i].
34. Use the Requests page to view the status of the request ID that you submitted.
Step Action
35. Click the View Details... button.
or Press [Alt+s].
Step Action
36. Click the OK button.
Step Action
37. Click the View Log... button.