FORMAT FOR THE REPORT ON PHYSICAL VERIFICATION OF ASSET (CFA)AS ON 31-03-2017

B B B A A B

Value of
Quantity as per Asset Register on 31/03/2014(date Quantity found on Difference in
Sl. No. Name of Asset to be physically verified Assets as per
of physical verification) physical verification quantity (3-4)
Asset Register

1 2 3 4 5 6
1 Free Hold Free Hold 1.00
2 Free Hold Free Hold 1.00
3 Free Hold Free Hold 3,592.00
4 Sy. No. 1004,CELLSITE,BEERAVELLY,ADILABAD Sy. No. 1004,CELLSITE,BEERAVELLY,ADILABAD 1.00
ANNEXURE 'A'
03-2017

B B B C C B&C
Action
Differenc taken to Differenc Action
e in reconcile e in taken to
value of the value of reconcile
Value of
Asset as quantity Value of Asset as the
Asset
per differenc the per differenc
found on
Asset e & asset as Asset e in SDCA DIV
physical
Register differenc per Trial Register value as
verificati
& as per e in Balance & as per mentione
on
physical value as Trial d in
verificati mentione Balance Column
on (6-7) d in Col. (6-10) 11
8
7 8 9 10 11 12 13 14
NA NA NML NML The land and building of Telephone exchange building
NA NA NML NML are in assets of STR
NA NA NML NML
NA NA NML NML
FORMAT FOR THE REPORT ON PHYSICAL VERIFICATION OF ASSET (CFA)AS ON 31-03-2017

B B B A A B B

Value of
Quantity Value of Asset
Difference in
Quantity as per Asset Register on 31/03/2014(date found on Assets as found on
Sl. No. Name of Asset to be physically verified quantity (3-
of physical verification) physical per Asset physical
4)
verification Register verificati
on

1 2 3 4 5 6 7
1 compund wall compund wall 129,448.94
2 aro compund wall aro compund wall 429.66
3 Exchange Building Exchange Building 319,537.30
4 aro Exchange Building aro Exchange Building 639.73
5 30 GBT 30 GBT 46,546.01
6 CASH COUNTER CASH COUNTER 40,902.06
7 Modification of in F/F TE Bldgs to accommodate DE Modification of in F/F TE Bldgs to accommodate DE 4,625.23
8 cash counter cash counter 32,390.09
ANNEXURE 'A'
017

B B C C B&C
Action
Differenc taken to Differenc Action
e in reconcile e in taken to
value of the value of reconcile
Asset as quantity Value of Asset as the
per differenc the per differenc
Asset e & asset as Asset e in SDCA DIV
Register differenc per Trial Register value as
& as per e in Balance & as per mentione
physical value as Trial d in
verificati mentione Balance Column
on (6-7) d in Col. (6-10) 11
8
8 9 10 11 12 13 14
NA NA NML NML The land,tower and building of Telephone
NA NA NML NML exchange building are in assets of STR
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
ANNEXURE 'A'

B B B B B C C B&C
1 6 7 8 9 10 11 12
1 147,787.61 NA NA
2 445.61 NA NA
3 795,600.00 NA NA
4 208,300.00 NA NA
5 228,500.00 NA NA
6 538,326.80 NA NA
7 192,779.85 NA NA
8 97,818.01 NA NA
9 76,127.32 NA NA
10 49,001.99 NA NA
11 68,202.80 NA NA
12 10,678.50 NA NA
13 40,724.25 NA NA
14 1,733.05 NA NA
15 8,284.52 NA NA
16 16,088.21 NA NA
17 56,884.14 NA NA
18 72,086.17 NA NA
19 118,175.15 NA NA
20 0.00 NA NA
21 12,750.88 NA NA
22 2,089.67 NA NA
23 4,897.87 NA NA
24 3,705.44 NA NA
25 4,474.60 NA NA
26 795.47 NA NA
27 1,155.33 NA NA
28 4,847.70 NA NA
29 4,847.70 NA NA
30 4,847.70 NA NA
31 11,079.59 NA NA
32 19,490.75 NA NA
33 20,046.60 NA NA
34 2,505.06 NA NA
35 2,900.55 NA NA
36 12,985.75 NA NA
37 19,900.00 NA NA
38 36,250.00 NA NA
39 51,100.00 NA NA
40 21,883.00 NA NA
41 26,750.00 NA NA
42 171,000.00 NA NA
43 15,200.00 NA NA
44 26,750.00 NA NA
45 41,550.00 NA NA
46 31,000.00 NA NA
47 45,000.00 NA NA
48 43,800.00 NA NA
49 7,220.85 NA NA
50 295.00 NA NA
51 866.75 NA NA
52 6,940.85 NA NA
53 510.00 NA NA
54 958.95 NA NA
55 18,736.40 NA NA
56 1,042.58 NA NA
57 1,512.50 NA NA
58 1,752.30 NA NA
59 1,235.08 NA NA
60 17,948.15 NA NA
61 53,750.96 NA NA
62 1,271.19 NA NA
63 78,590.60 NA NA
64 17,137.01 NA NA
65 108,800.21 NA NA
66 0.00 NA NA
67 10,061.61 NA NA
68 6,211.92 NA NA
69 3,038.26 NA NA
70 91,179.99 NA NA
71 3,560.04 NA NA
72 34,053.58 NA NA
73 38,334.06 NA NA
74 90,162.15 NA NA
75 14,155.80 NA NA
76 5,111.10 NA NA
77 41,628.75 NA NA
78 69,194.95 NA NA
79 19,766.00 NA NA
80 2,798.70 NA NA
81 7,504.00 NA NA
82 4,241.65 NA NA
83 7,637.55 NA NA
84 484.52 NA NA
85 1,908.62 NA NA
86 1,908.62 NA NA
87 1,908.62 NA NA
88 5,877.98 NA NA
89 9,356.27 NA NA
90 472.11 NA NA
91 2,730.35 NA NA
92 2,436.85 NA NA
93 23,184.58 NA NA
94 766.14 NA NA
95 511.23 NA NA
96 6,238.36 NA NA
97 0.00 NA NA
98 69,714.41 NA NA
99 32,436.79 NA NA
100 35,241.57 NA NA
101 30,373.34 NA NA
102 69,521.46 NA NA
103 240,121.37 NA NA
104 747.27 NA NA
105 151,405.23 NA NA
106 599.19 NA NA
107 8,962.55 NA NA
108 2,803.10 NA NA
109 4,180.00 NA NA
110 754.47 NA NA
111 2,385,203.88 NA NA
FORMAT FOR THE REPORT ON PHYSICAL VERIFICATION OF ASSET (CFA)AS ON 31-03-2017

B B B A A

Difference in
Quantity as per Asset Register on Quantity found on physical
Sl. No. Name of Asset to be physically verified quantity (3-
31/03/2014(date of physical verification) verification
4)

1 2 3 4 5
1 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
2 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
3 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
4 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
5 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
6 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
7 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
8 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
9 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
10 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
11 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
12 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
13 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
14 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
15 100/50/20 PAIR CABLE CABLE 100/50/20 PAIR CABLE CABLE
16 CABLES Laying 5 pr cable CABLES Laying 5 pr cable
17 CABLES Laying 5 pr cable CABLES Laying 5 pr cable
18 CABLES cable works CABLES cable works
19 Cable joints Laying UG Cables Cable joints Laying UG Cables
20 Cable joints Laying UG Cables Cable joints Laying UG Cables
21 For APTRANSCO Laying UG Cables For APTRANSCO Laying UG Cables
22 For Lcs 5 pr cable For Lcs 5 pr cable
23 Cables 5 pr cable Cables 5 pr cable
24 Pillar 28 - APTRANSCO Laying UG Cables Pillar 28 - APTRANSCO Laying UG Cables
25 5 Pr Cables Prov of 5 pr cable to leased circuits 5 Pr Cables Prov of 5 pr cable to leased circuits
26 12F OF Cables for APSDMS Lay of 12 F OF Cable for 12F OF Cables for APSDMS Lay of 12 F OF Cable for
27 6F/12F/24F OF Cable 6F/12F/24F OF Cable
28 6F/12F/24F OF Cable 6F/12F/24F OF Cable
29 6F/12F/24F OF Cable 6F/12F/24F OF Cable
30 6F/12F/24F OF Cable 6F/12F/24F OF Cable
31 6F/12F/24F OF Cable 6F/12F/24F OF Cable
32 CABLES 3channel composite system CABLES 3channel composite system
33 Cables OFC Cable route Cables OFC Cable route
34 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
35 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
36 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
37 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
38 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
39 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
40 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
41 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
42 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
43 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
44 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
45 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
46 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
47 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
48 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
49 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
50 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
51 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
52 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
53 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
54 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
55 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
56 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
57 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
58 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
59 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
60 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
61 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
62 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
63 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
64 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
65 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
66 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
67 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
68 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
69 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
70 100/50/20/10 PIJF Cable 100/50/20/10 PIJF Cable
71 100/50/20/10 PIJF Cable 100/50/20/10 PIJF Cable
72 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
73 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
74 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
75 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
76 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
77 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
78 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
79 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
80 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
81 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
82 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
83 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
84 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
85 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
86 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
87 Cables U/G CABLE Cables U/G CABLE
88 Cables U/G CABLE Cables U/G CABLE
89 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
90 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
91 100 Pair/20 Pair PIJF Cable 100 Pair/20 Pair PIJF Cable
92 Cables Cable Cables Cable
93 Rehab-external 5 pr cable Rehab-external 5 pr cable
94 Cables Laying UG Cables Cables Laying UG Cables
95 6F/12F/24F OF Cables 6F/12F/24F OF Cables
96 6F/12F/24F OF Cables 6F/12F/24F OF Cables
97 6F/12F/24F OF Cable 6F/12F/24F OF Cable
98 6F/12F/24F OF Cable 6F/12F/24F OF Cable
99 6F/12F/24F OF Cable 6F/12F/24F OF Cable
100 24F OF Cable Bopparam - Madhapur 24F OF Cable Bopparam - Madhapur
ANNEXURE 'A'
S ON 31-03-2017

B B B B C C B&C
Action
Differenc taken to Differenc Action
e in reconcile e in taken to
value of the value of reconcile
Value of
Asset as quantity Value of Asset as the
Value of Asset
per differenc the per differenc
Assets as found on
Asset e & asset as Asset e in SDCA DIV
per Asset physical
Register differenc per Trial Register value as
Register verificati
& as per e in Balance & as per mentione
on
physical value as Trial d in
verificati mentione Balance Column
on (6-7) d in Col. (6-10) 11
8
6 7 8 9 10 11 12 13 14
526,100.00 NA NA NML NML
995,418.11 NA NA NML NML
748,772.46 NA NA NML NML
1,479,803.11 NA NA NML NML
993,251.57 NA NA NML NML
109,535.25 NA NA NML NML
225,251.57 NA NA NML NML
1,459,178.52 NA NA NML NML
88,690.29 NA NA NML NML
214,322.85 NA NA NML NML
74,788.09 NA NA NML NML
115,826.16 NA NA NML NML
121,864.19 NA NA NML NML
12,690.61 NA NA NML NML
982.42 NA NA NML NML
24,333.03 NA NA NML NML
73,976.29 NA NA NML NML
15,164.24 NA NA NML NML
31,365.94 NA NA NML NML
5,067.01 NA NA NML NML
34,559.06 NA NA NML NML
4,296.88 NA NA NML NML
2,204.60 NA NA NML NML
37,085.52 NA NA NML NML
2,292.95 NA NA NML NML
8,095.49 NA NA NML NML
10,152.35 NA NA NML NML
3,005.64 NA NA NML NML
21,528.24 NA NA NML NML
801,191.40 NA NA NML NML
591.15 NA NA NML NML
63,054.60 NA NA NML NML
455,574.02 NA NA NML NML
34,800.00 NA NA NML NML
34,800.00 NA NA NML NML
99,735.93 NA NA NML NML
69,750.00 NA NA NML NML
69,750.00 NA NA NML NML
12,550.00 NA NA NML NML
13,850.00 NA NA NML NML
12,550.00 NA NA NML NML
119,284.72 NA NA NML NML
31,550.00 NA NA NML NML
130,995.21 NA NA NML NML
129,176.59 NA NA NML NML
3,088.13 NA NA NML NML
163,553.35 NA NA NML NML
128,220.49 NA NA NML NML
35,864.88 NA NA NML NML
52,156.77 NA NA NML NML
316,112.21 NA NA NML NML
25,749.90 NA NA NML NML
40,756.92 NA NA NML NML
166,055.27 NA NA NML NML
7,876.52 NA NA NML NML
12,694.19 NA NA NML NML
26,941.64 NA NA NML NML
1,659.09 NA NA NML NML
13,956.47 NA NA NML NML
74,752.86 NA NA NML NML
32,183.01 NA NA NML NML
4,608.01 NA NA NML NML
11,061.81 NA NA NML NML
1,699.72 NA NA NML NML
2,143.78 NA NA NML NML
129,973.45 NA NA NML NML
2,447.20 NA NA NML NML
17,938.71 NA NA NML NML
21,539.36 NA NA NML NML
1,201,516.67 NA NA NML NML
11,959.37 NA NA NML NML
14,550.29 NA NA NML NML
17,257.44 NA NA NML NML
486,399.82 NA NA NML NML
63,682.90 NA NA NML NML
232,079.19 NA NA NML NML
4,706.38 NA NA NML NML
34,250.89 NA NA NML NML
11,098.26 NA NA NML NML
72,107.91 NA NA NML NML
8,081.88 NA NA NML NML
166,952.55 NA NA NML NML
129,912.82 NA NA NML NML
3,301.88 NA NA NML NML
495.57 NA NA NML NML
21,118.02 NA NA NML NML
36,339.25 NA NA NML NML
8,123.79 NA NA NML NML
3,267.75 NA NA NML NML
3,572.83 NA NA NML NML
40,718.91 NA NA NML NML
1,655.80 NA NA NML NML
7,767.88 NA NA NML NML
3,170.77 NA NA NML NML
120,622.45 NA NA NML NML
2,106.51 NA NA NML NML
9,934.60 NA NA NML NML
9,678.98 NA NA NML NML
2,813.29 NA NA NML NML
298,110.90 NA NA NML NML
FORMAT FOR THE REPORT ON PHYSICAL VERIFICATION OF ASSET (CFA)AS ON 31-03-2017

B B B A A B

Value of
Difference in
Quantity as per Asset Register on 31/03/2014(date Quantity found on physical Assets as
Sl. No. Name of Asset to be physically verified quantity (3-
of physical verification) verification per Asset
4)
Register

1 2 3 4 5 6
1 AB/BC Posts and Post Material AB/BC Posts and Post Material 84,300.00
2 AB/BC Posts and Post Material AB/BC Posts and Post Material 210,670.15
3 AB/BC Posts and Post Material AB/BC Posts and Post Material 166,912.71
4 AB/BC Posts and Post Material AB/BC Posts and Post Material 66,541.80
5 AB/BC Posts and Post Material AB/BC Posts and Post Material 9,436.13
6 AB/BC Posts and Post Material AB/BC Posts and Post Material 353,870.12
7 AB/BC Posts and Post Material AB/BC Posts and Post Material 2,124.98
8 AB/BC Posts and Post Material AB/BC Posts and Post Material 11,425.26
9 AB/BC Posts and Post Material AB/BC Posts and Post Material 10,901.46
10 LINES AND WIRES Posts and Post Material LINES AND WIRES Posts and Post Material 2,270.70
11 Drop wire DE for drawing D/Wire for prov. NPCs at Drop wire DE for drawing D/Wire for prov. NPCs at 13,342.42
12 AB/BC Posts and Post Material AB/BC Posts and Post Material 10,000.00
13 AB/BC Posts and Post Material AB/BC Posts and Post Material 17,400.00
14 AB/BC Posts and Post Material AB/BC Posts and Post Material 15,900.00
15 AB/BC Posts and Post Material AB/BC Posts and Post Material 3,450.00
16 AB/BC Posts and Post Material AB/BC Posts and Post Material 3,450.00
17 AB/BC Posts and Post Material AB/BC Posts and Post Material 15,632.12
18 AB/BC Posts and Post Material AB/BC Posts and Post Material 8,350.00
19 AB/BC Posts and Post Material AB/BC Posts and Post Material 33,254.79
20 AB/BC Posts and Post Material AB/BC Posts and Post Material 39,106.58
21 AB/BC Posts and Post Material AB/BC Posts and Post Material 31,639.92
22 AB/BC Posts and Post Material AB/BC Posts and Post Material 681.63
23 AB/BC Posts and Post Material AB/BC Posts and Post Material 525.34
24 AB/BC Posts and Post Material AB/BC Posts and Post Material 484.48
25 AB/BC Posts and Post Material AB/BC Posts and Post Material 1,092.04
26 AB/BC Posts and Post Material AB/BC Posts and Post Material 763.89
27 AB/BC Posts and Post Material AB/BC Posts and Post Material 458.29
28 AB/BC Posts and Post Material AB/BC Posts and Post Material 2,539.99
29 AB/BC Posts and Post Material AB/BC Posts and Post Material 1,465.10
30 AB/BC Posts and Post Material AB/BC Posts and Post Material 1,732.44
31 AB/BC Posts and Post Material AB/BC Posts and Post Material 2,132.66
32 AB/BC Posts and Post Material AB/BC Posts and Post Material 3,302.81
33 AB/BC Posts and Post Material AB/BC Posts and Post Material 23,313.81
34 AB/BC Posts and Post Material AB/BC Posts and Post Material 938.37
35 AB/BC Posts and Post Material AB/BC Posts and Post Material 780.24
36 AB/BC Posts and Post Material AB/BC Posts and Post Material 1,599.29
37 AB/BC Posts and Post Material AB/BC Posts and Post Material 18,025.63
38 pillars/mdf Rehabilitiation work pillars/mdf Rehabilitiation work 18,620.42
39 pillars/mdf Rehabilition of Pillars and MDF at Ni pillars/mdf Rehabilition of Pillars and MDF at Ni 17,890.72
40 Dropwire Prov of d/w for providing 136 NPCs under Dropwire Prov of d/w for providing 136 NPCs under 3,880.11
41 Dropwire Prov of 116 NPCs at TE area Narsapur for Dropwire Prov of 116 NPCs at TE area Narsapur for 3,535.33
42 Dropwire DE for prov of dropwire for providing 35 Dropwire DE for prov of dropwire for providing 35 6,259.42
43 Dropwire Prov of d/w for providing 359 NPCs SDE G Dropwire Prov of d/w for providing 359 NPCs SDE G 4,070.62
44 Dropwire DE for prov of d/w for 500 NPCs under SD Dropwire DE for prov of d/w for 500 NPCs under SD 4,298.33
45 Dropwire DE for prov of d/w for providing 600 NPC Dropwire DE for prov of d/w for providing 600 NPC 7,710.98
46 Dropwire DE for prov of d/w to provide 500 NPCs d Dropwire DE for prov of d/w to provide 500 NPCs d 20,337.66
47 Dropwire DE for prov of d/w to provide 600 NPCs f Dropwire DE for prov of d/w to provide 600 NPCs f 20,607.96
48 Detailed estimate for provision of L&W to provide Detailed estimate for provision of L&W to provide 45,592.94
ANNEXURE 'A'
-2017

B B B C C B&C
Action
Differenc taken to Differenc Action
e in reconcile e in taken to
value of the value of reconcile
Value of
Asset as quantity Value of Asset as the
Asset
per differenc the per differenc
found on
Asset e & asset as Asset e in SDCA DIV
physical
Register differenc per Trial Register value as
verificati
& as per e in Balance & as per mentione
on
physical value as Trial d in
verificati mentione Balance Column
on (6-7) d in Col. (6-10) 11
8
7 8 9 10 11 12 13 14
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
FORMAT FOR THE REPORT ON PHYSICAL VERIFICATION OF ASSET (CFA)AS ON 31-03
B B B A A B

Value of
Difference in
Quantity as per Asset Register on 31/03/2014(date Quantity found on Assets as
Sl. No. Name of Asset to be physically verified quantity (3-
of physical verification) physical verification per Asset
4)
Register

1 2 3 4 5 6
1 ele wiring/fan etc E F /Air coolers ele wiring/fan etc E F /Air coolers 364.20
2 ele wiring/fan etc E F /Air coolers ele wiring/fan etc E F /Air coolers 6,455.20
3 ele wiring/fan etc E F /Air coolers ele wiring/fan etc E F /Air coolers 3,994.75
4 Voltas Etc Air Colers Voltas Etc Air Colers 29,242.54
5 JET PUMP JET PUMP 764.70
6 ELE FITTINGS APPLICANCE 50 kva AVR ELE FITTINGS APPLICANCE 50 kva AVR 8,733.79
7 AC Units ITC of 1.5 TR Split AC Units in MBM Exge
AC Units ITC of 1.5 TR Split AC Units in MBM Exge 4,601.95
8 DC Cable Provdg DC Cable for 2000 AH Batteries (N
DC Cable Provdg DC Cable for 2000 AH Batteries (N 49,072.05
9 AC Units SITC of 3 nos AC Units for TE Nirmal AC Units SITC of 3 nos AC Units for TE Nirmal 154,308.93
10 Prov. Of TR PACKAGE TYPE AC Plant for MBM Xge Prov.
a Of TR PACKAGE TYPE AC Plant for MBM Xge a 10,094.98
11 ele wiring/fan etc E F /Air coolers ele wiring/fan etc E F /Air coolers 3,791.65
12 ele wiring/fan etc E F /Air coolers ele wiring/fan etc E F /Air coolers 274.45
13 ele wiring/fan etc E F /Air coolers ele wiring/fan etc E F /Air coolers 3,894.45
14 ele wiring/fan etc E F /Air coolers ele wiring/fan etc E F /Air coolers 1,433.95
15 ele wiring/fan etc E F /Air coolers ele wiring/fan etc E F /Air coolers 8,076.35
16 Voltas Etc Air Colers Voltas Etc Air Colers 13,676.45
17 Voltas Etc Air Colers Voltas Etc Air Colers 1,743.90
18 Voltas Etc Air Colers Voltas Etc Air Colers 13,539.72
19 Voltas Etc Air Colers Voltas Etc Air Colers 3,502.84
20 Voltas Etc Air Colers Voltas Etc Air Colers 20,082.42
21 Voltas Etc Air Colers Voltas Etc Air Colers 563.04
22 Voltas Etc Air Colers Voltas Etc Air Colers 27,373.86
23 Voltas Etc Air Colers Voltas Etc Air Colers 17,119.79
24 Voltas Etc Air Colers Voltas Etc Air Colers 6,273.59
25 Voltas Etc Air Colers Voltas Etc Air Colers 2,782.34
26 Voltas Etc Air Colers Voltas Etc Air Colers 26,356.85
27 AC UNITS ELE AC UNITS ELE 2,459.40
28 ELE EI & Fans ELE EI & Fans 1,962.95
29 ELE FITTINGS APPLICANCE E1 & Fans etc ELE FITTINGS APPLICANCE E1 & Fans etc 2,262.80
30 ELE FITTINGS APPLICANCE 8 KV for Cell tower ELE FITTINGS APPLICANCE 8 KV for Cell tower 1,050.20
31 ELE FITTINGS APPLICANCE 30KVA AVR, ELE FITTINGS APPLICANCE 30KVA AVR, 314.75
32 ELE FITTINGS APPLICANCE 15 KVA AVR ELE FITTINGS APPLICANCE 15 KVA AVR 3,366.68
33 AC Units SITC of 4 Nos Split AC Units at MBM ExgeAC Units SITC of 4 Nos Split AC Units at MBM Exge 12,865.31
34 Providing E1,S/C SITC of AC Units, ITC of DG set Providing E1,S/C SITC of AC Units, ITC of DG set 856.12
35 Priliminary estimat for sitc of (2+1) x TR packa Priliminary estimat for sitc of (2+1) x TR packa 98,472.85
ANNEXURE 'A'
(CFA)AS ON 31-03-2017
B B B C C B&C
Difference in Action taken to Difference in Action taken
value of Asset reconcile the value of to reconcile
Value of Asset Asset as per
as per Asset quantity Value of the the
found on Asset
Register & as difference & asset as per difference in SDCA DIV
physical Register & as
per physical difference in value Trial Balance value as
verification per Trial
verification (6- as mentioned in mentioned in
7) Col.8 Balance (6- Column 11
10)
7 8 9 10 11 12 13 14
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
FORMAT FOR THE REPORT ON PHYSICAL VERIFICATION OF ASSET (CFA)AS ON 31-03-2017

B B B A A B B B

Differenc
e in
value of
Value of
Asset as
Value of Asset
Quantity as per Asset Register on Difference in per
Quantity found on physical Assets as found on
Sl. No. Name of Asset to be physically verified 31/03/2014(date of physical quantity (3- Asset
verification per Asset physical
verification) 4) Register
Register verificati
& as per
on
physical
verificati
on (6-7)

1 2 3 4 5 6 7 8
1 Table/Chair/Almara Wooden & Steel Table/Chair/Almara Wooden & Steel 12,827.40
ANNEXURE 'A'

B C C B&C
Action
taken to Differenc Action
reconcile e in taken to
the value of reconcile
quantity Value of Asset as the
differenc the per differenc
e & asset as Asset e in SDCA DIV
differenc per Trial Register value as
e in Balance & as per mentione
value as Trial d in
mentione Balance Column
d in Col. (6-10) 11
8
9 10 11 12 13 14
NA NA NML NML
FORMAT FOR THE REPORT ON PHYSICAL VERIFICATION OF ASSET (CFA)AS ON 31-03-2017

B B B A A B B

Value of
Value of Asset
Difference in
Name of Asset to be physically Quantity as per Asset Register on 31/03/2014(date Quantity found on physical Assets as found on
Sl. No. quantity (3-
verified of physical verification) verification per Asset physical
4)
Register verificati
on

1 2 3 4 5 6 7
1 Computers Computers 1,515.00
2 Computers Computers 1,515.00
3 Computers Computers 1,515.00
4 HP Laser printers HP Laser printers 976.50
5 Dot Matrix 136 Col Printers Dot Matrix 136 Col Printers 467.25
ANNEXURE 'A'
017

B B C C B&C
Action
Differenc taken to Differenc Action
e in reconcile e in taken to
value of the value of reconcile
Asset as quantity Value of Asset as the
per differenc the per differenc
Asset e & asset as Asset e in SDCA DIV
Register differenc per Trial Register value as
& as per e in Balance & as per mentione
physical value as Trial d in
verificati mentione Balance Column
on (6-7) d in Col. (6-10) 11
8
8 9 10 11 12 13 14
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
FORMAT FOR THE REPORT ON PHYSICAL VERIFICATION OF ASSET (CFA)AS ON 31-03-2017

B B B A A B

Value of
Difference in
Quantity as per Asset Register on 31/03/2014(date Quantity found on Assets as
Sl. No. Name of Asset to be physically verified quantity (3-
of physical verification) physical verification per Asset
4)
Register

1 2 3 4 5 6
2 epbt/lju/ff electronic epbt/lju/ff electronic 19,921.85
3 epbt/lju/ff electronic epbt/lju/ff electronic 24,726.85
4 epbt/lju/ff electronic epbt/lju/ff electronic 348.00
5 A&P A&P 13,016.52
6 NPC'S A&P SUBS NPC'S A&P SUBS 1,215.00
7 SUBS-INST NPCs SUBS-INST NPCs 251.45
8 SUBS-INST CCB LPTS 100 SUBS-INST CCB LPTS 100 811.41
9 SUBS-INST 300 NPCs SUBS-INST 300 NPCs 5,354.52
10 A&P subs NPCs. A&P subs NPCs. 2,918.00
11 EPBTS DE for prov of A&P EPBTs for provdg 600 NPC EPBTS DE for prov of A&P EPBTs for provdg 600 NPC 5,440.43
12 EPBTS DE for prov of EPBTs for providing 600 NPCs EPBTS DE for prov of EPBTs for providing 600 NPCs 17,569.43
13 DE for Prov. Of EPBTS to provide 600NPCs under SD DE for Prov. Of EPBTS to provide 600NPCs under SD 2,081.36
14 epbt/lju/ff electronic epbt/lju/ff electronic 441.28
15 epbt/lju/ff electronic epbt/lju/ff electronic 9,747.98
16 epbt/lju/ff electronic epbt/lju/ff electronic 1,567.50
17 epbt/lju/ff electronic epbt/lju/ff electronic 6,957.06
18 epbt/lju/ff electronic epbt/lju/ff electronic 2,493.98
19 epbt/lju/ff electronic epbt/lju/ff electronic 1,567.50
20 epbt/lju/ff electronic epbt/lju/ff electronic 310.00
21 epbt/lju/ff electronic epbt/lju/ff electronic 1,267.16
22 epbt/lju/ff SUBS INSTALATION epbt/lju/ff SUBS INSTALATION 2,185.43
23 epbt/lju/ff SUBS INSTALATION epbt/lju/ff SUBS INSTALATION 2,408.25
24 SUBS-INST NPCs SUBS-INST NPCs 527.00
25 SUBS-INST NPCs SUBS-INST NPCs 1,397.92
26 SUBS-INST NPCs SUBS-INST NPCs 937.82
27 SUBS-INST NPCs SUBS-INST NPCs 941.00
28 SUBS-INST NPCs SUBS-INST NPCs 545.95
29 SUBS-INST NPCs SUBS-INST NPCs 946.92
30 SUBS-INST NPCs SUBS-INST NPCs 1,342.00
31 A&P subs NPCs. A&P subs NPCs. 2,218.00
32 SI DE for prov of EPBTs 116 Nos at Narsapur(G) un SI DE for prov of EPBTs 116 Nos at Narsapur(G) un 795.35
33 SI Prov of EPBTs for providing 359 NPCs SDE G NIR SI Prov of EPBTs for providing 359 NPCs SDE G NIR 15,380.58
34 EPBTs DE for prov of EPBTs for procuring 500 NPCs EPBTs DE for prov of EPBTs for procuring 500 NPCs 3,793.94
35 EPBTs DE for prov of 500 NPCs during 10-11 under EPBTs DE for prov of 500 NPCs during 10-11 under 9,298.35
36 DE for provision of EPBTs to provide 40 NPCs in Ni DE for provision of EPBTs to provide 40 NPCs in Ni 61,419.64
ANNEXURE 'A'
3-2017

B B B C C B&C
Action
Differenc taken to Differenc Action
e in reconcile e in taken to
value of the value of reconcile
Value of
Asset as quantity Value of Asset as the
Asset
per differenc the per differenc
found on
Asset e & asset as Asset e in SDCA DIV
physical
Register differenc per Trial Register value as
verificati
& as per e in Balance & as per mentione
on
physical value as Trial d in
verificati mentione Balance Column
on (6-7) d in Col. (6-10) 11
8
7 8 9 10 11 12 13 14
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
NA NA NML NML
Asset ASSET CLASS LOCATION Subnumber Company Code Services/Est Region Components
991900258 9919 ADILABAD SSA 0 1012 Z001 Z203 Z759
Asset description Deactivation on Capitalized on Currency APC FY start
991307565|DE for proc of installation of eqpt to i 10/18/2010 INR 3,814,544.00
Acquisition Retirement Transfer Current APC Dep. FY start Dep. for year Dep.retir. Dep.transfer
0.00 0.00 0.00 3,814,544.00 -3,564,857.49 -58,959.31 0.00 0.00
Accumul. dep. Bk.val.FY strt Curr.bk.val. Sub Class
-3,623,816.80 249,686.51 190,727.20 Z146