Professional Documents
Culture Documents
GRP Assignment PSR1
GRP Assignment PSR1
public sector management and governance. However, there are several challenges and
limitations associated with applying this framework in practice, including:
v. Resistance to Change:
One of the main challenges associated with implementing the public sector conceptual
framework is resistance to change from within the public sector Fundamental changes
may be required in internal public sector entities, structures and workings to ensure
the successful implementation of the framework. Stakeholders may be resistant to
making changes that they perceive as threatening their authority or power.
v. Scaling Up:
Starting with pilot studies, expanding to larger groups, and eventually scaling up the
program is an effective way to ensure efficient and effective implementation of the
framework in progress.
REFERENCES.
Hughes,0.,2003.Public and administration. 3rd ed.New York: Macmillian Press.
Kelly,R., 1998. Promoting productivity in the public sector. 1st ed. London:
Macmillian Press. Lee, R.,1967.Tools for Administration in the Public services. 1 st ed
London: