GENERAL ELECTRICAL EQUIPMENT MAINTENANCE CHECKLIST

The following checklist must be filled out at the start of each workday.

INSPECTOR NAME: SIGNATURE: DATE OF INSPECTION:

NO. REQUIREMENTS COMPLIANT COMMENTS


YES NO

1. All electrical equipment on site RCD (Residual Current Device) protected

2. Electrical equipment (including cords and leads) checked for faults and
visible signs of damage, such as:
 cracked casings.
 missing or damaged guards.
 nicked cables; tape covering nicks or cuts.
 dry and brittle insulation.
 burn marks or signs of overheating.
 RCDs not tripping when tested.

3. Source of power supply identified

4. Switchboard readily accessible and close to work site

5. Electrical equipment protected from weather

6. Live parts effectively protected and electrical shock warning signs displayed
7. Power tool users able to work under cover during rain

8. Battery chargers used in dry and dust-free environments

9. Leads and cords arranged to prevent slips and trips

10. Cable protectors cover any leads that must run across ground

11. Extension leads have heavy-duty sheathed cords

12. Extension leads stored away when not in use

13. Suitable personal protective equipment (PPE) used, along with other control
measures

14. Hidden electricity cables and other utility lines (such as gas pipes) located,
identified, and clearly marked

15. Workers provided with instruction and supervision needed to:


 use electricity safely.
 operate electrical equipment safely.

16. Equipment connected to one or more PSOAs (Portable socket outlet


assemblies) OR enough fixed wire socket-outlets for all users through an
auxiliary socket-outlet panel

17. PSOAs tested and tagged by electrician regularly

18. Site layout allows people to enter, exit and move about without risks to safety

19. Adequate first aid equipment is available

20. People on site know what they have to do in an emergency