FOR00216/03
AUDIT SCOPE DOCUMENT Nº Power, kW - S C P N F
LIST
Existent Existent Existent
Author Reviewed by Approved by Nº drawing Area Part Code Issue date Revision Review date EQUIPMENTS TOTAL Indeterminate Nou Futur
s/mod a/mod pendent
01 M.Rabbai M.Rabbai X.Curiel 6995.00.010/11/12/13 Boiler room 28 14
02 M.Rabbai M.Rabbai X.Curiel 6995.00.002 Boiler room 19 13 4
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
EQUIPMENTS LIST Author: M.Rabbai Document: 6695.02.001a
Client: Shell Reviewed by: M.Rabbai Issue date: 20/03/2020
Location: La Canonja Approved by: X.Curiel Revision: 6
Code: 6995 Nº drawing: 6995.00.010/11/12/13 Data revision: 02/10/2020
Logo client Project: New Boiler Area Nº Equipments 16
Plant: New Steam Boilers Part Boiler room FOR00216/03
New, Future
S/m,C/m,
Pending,
Design code and Delivery
Item Denomination Main characteristics Power, kW Material Reference Price, Euros Revision
certification time
---
Amine Injection
A-1004 Package Type: Dose pump 0,025 N 3 months BWT 5
CE
(Skid Water)
certification
--- 2 months,
Additives pump
supplied
A-1005 (Oxigen Type: Dose pump 1,0 N ATTSU - 0
CE with
scavenger)
certification boilers
--- 2 months,
Additives pump supplied
A-1006 Type: Dose pump 1,0 N ATTSU - 0
(phosphate) CE with
certification boilers
ASME Sec.VIII
Type: coil sample cooler Div.1
E-1002 Sample cooler Design temperature: 120ºC Alloy 625 N 2 months IBERFLUID 5
Design Pressure: -1/20 barg CE
certification
EQUIPMENTS LIST Author: M.Rabbai Document: 6695.02.001a
Client: Shell Reviewed by: M.Rabbai Issue date: 20/03/2020
Location: La Canonja Approved by: X.Curiel Revision: 6
Code: 6995 Nº drawing: 6995.00.010/11/12/13 Data revision: 02/10/2020
Logo client Project: New Boiler Area Nº Equipments 16
Plant: New Steam Boilers Part Boiler room FOR00216/03
New, Future
S/m,C/m,
Pending,
Design code and Delivery
Item Denomination Main characteristics Power, kW Material Reference Price, Euros Revision
certification time
--- 2 months,
supplied
E-1003 Sample cooler Type: coil sample cooler Duplex N ATTSU 3
CE with
certification boilers
--- 2 months,
supplied
E-1004 Sample cooler Type: coil sample cooler Duplex N ATTSU 3
CE with
certification boilers
New, Future
S/m,C/m,
Pending,
Design code and Delivery
Item Denomination Main characteristics Power, kW Material Reference Price, Euros Revision
certification time
2014/68/UE
MMF Filter (SKID Type: Multimedia filter
S-1001 A 0,10 Housing: PRFV F 3 months (*) Future 3
Condensate) Flow: 1,75 m3/h CE certification
2014/68/UE
MMF Filter (SKID Type: Multimedia filter
S-1001 B 0,10 Housing: PRFV F 3 months (*) Future 3
Condensate) Flow: 1,75 m3/h CE certification
Active Carbon 2014/68/UE
Type: Granular Actived Carbon
S-1002 Filter (SKID 0,10 Housing: PRFV F 3 months (*) Future 3
Flow: 1,75 m3/h CE certification
Condensate)
Active Carbon 2014/68/UE
Type: Granular Actived Carbon
S-1003 Filter (SKID 0,10 Housing: PRFV F 3 months (*) Future 3
Flow: 1,75 m3/h CE certification
Condensate)
Type: Sand Filter 2014/68/UE
Sand filter
S-1004 Flow: 4,6 m3/h 0,10 Housing: PRFV N 3 months BWT 5
(SKID Water) CE certification
Flow: 250 Nm3/h
Natural Gas Inlet pressure: 1,5 barg
A-1001 CE certificacion N - 2
Station Outlet pressure: 100 mbarg
Softener
Type: Dosing pump ---
regeneration
P-1005 0,10 CE N 3 months BWT - 6
pump
certification
(SKID water)
Type: Plate heat exchanger
Design pressure: -1/+10 barg ASME Sec. VIII
Design Temperature: 150ºC Plates: Titanium
Div. 1
E-1001 Heat exchanger Dimentions: 340x340x890 mm (L x W x Gaskets: EPDM N 2 months ALFALAVAL - 5
Frame: C. Steel
H) CE certification