Professional Documents
Culture Documents
LFA-1 Report
LFA-1 Report
Line/Cable/
XFMR2 XFMR3 Reactor Busway Impedance Tie PD Total
Number of Branches: 2 0 0 2 0 0 4
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Transformer Impedance: Yes Individual
Apply Individual
Temperature Correction Adjustments /Global Degree C
Transmission Line Resistance: Yes Individual
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Total Number of Buses: 5 0.323 0.199 0.241 0.094 0.000 0.000 0.000 0.000
0.000 0.000
Project: ETAP Page: 4
Location: 19.0.1C Date: 16-12-2020
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: LFA Config.: Normal
Line/Cable/Busway Length
Branch Connections
* Bus1 66.000 100.000 0.0 0.561 0.295 0.000 0.000 Bus2 0.561 0.295 5.5 88.5
Bus2 33.000 99.490 -0.4 0.000 0.000 0.000 0.000 Bus6 0.560 0.290 11.1 88.8
Bus6 33.000 99.459 -0.4 0.000 0.000 0.000 0.000 Bus2 -0.560 -0.297 11.1 88.4
Bus7 11.000 98.944 -0.9 0.000 0.000 0.000 0.000 Bus8 0.559 0.291 33.4 88.7
Bus8 11.000 98.871 -0.9 0.000 0.000 0.559 0.291 Bus7 -0.559 -0.291 33.4 88.7
* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Project: ETAP Page: 8
Location: 19.0.1C Date: 16-12-2020
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: LFA Config.: Normal
* Indicates operating load of a bus exceeds the bus critical limit (100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit (95.0% of the Continuous Ampere rating).
Project: ETAP Page: 9
Location: 19.0.1C Date: 16-12-2020
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: LFA Config.: Normal
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Cable1 Cable 270.43 33.44 12.36
T1 Transformer 5.000 0.634 12.7 0.630 12.6
T4 Transformer 5.000 0.634 12.7 0.630 12.6
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag
Cable1 0.559 0.291 -0.559 -0.291 0.4 0.2 98.9 98.9 0.07
Line1 0.560 0.290 -0.560 -0.297 0.1 -6.9 99.5 99.5 0.03
1.9 4.8
* This Transmission Line includes Series Capacitor.
Project: ETAP Page: 11
Location: 19.0.1C Date: 16-12-2020
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: LFA Config.: Normal
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Cable / Busway 100.0 95.0
Reactor 100.0 95.0
Line 100.0 95.0
Transformer 100.0 95.0
Panel 100.0 95.0
Protective Device 100.0 95.0
Generator 100.0 95.0
Inverter/Charger 100.0 95.0
Bus Voltage
OverVoltage 105.0 102.0
UnderVoltage 95.0 98.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.) 100.0
Project: ETAP Page: 12
Location: 19.0.1C Date: 16-12-2020
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: LFA Config.: Normal
MW Mvar MVA % PF
Number of Iterations: 3