Scope of application
This document applies to: International, except Canada
Mechanical Induction Installation Update Precast concrete tower – Installation
Electrical Rotor blade Grid connection Concrete repair Precast concrete tower – Prestressing
Confidentiality INTERNAL
1 General information
Since many grid connection teams use different grid connection procedures, there is a big difference in the amount of time it takes. For more efficient plan-
ning of manpower, time and costs, the grid connection procedure has to be standardised. This document defines the new standard work schedule.
2 Scope of application
With the exception of Canada, this document applies worldwide to all E-115 wind turbines with tower heights > 97 metres.
Blue TD-esc-08-ger-eng-14-055
A legend indicating which colour corresponds to which area can be found at the bottom of each scheduled day.
12:00 Lunch D
13:00 ... (Ma chi ne house) ...to Level 2 a
Ins tall tower ca ble ladder y
14:00 Control Pa ck a nd distribute
ca bi net cl a mps
a nd
1
... hood
... Ins tall s econdary a nd tower
15:00
bypass s ys tems entra nce Connect generator
ca bi net el ectrical
cable Hoi st machine house uni t
16:00 Route ca bles a long tower cable ladder ma terials i ncl. Installation
V2 box a nd auxiliary
wi nch
17:00
18:00
Legend
E-module Spinner Machine house
Tower and tower base Service hoist Work steps without documents
12:00 Lunch D
13:00 Route a
Ins tall hoist ca ble guide
Ins tall winch, lower y
ma terials a nd tools, clean
14:00 Prepa re ma chine house
top joi nt Route 2
Unpa ck and install Lower a nd clamp control/fibre -
15:00 s ervi ce hoist opti c/telephone ca bles, etc.
17:00
18:00
Legend
E-module Spinner Machine house
Tower and tower base Service hoist Work steps without documents
09:00
10:00
12:00 D
a
13:00 y
3
14:00 Lunch
15:00 Cl ea n WEC, s tow a way tools a nd prepare
cons truction s ite clean up Fi nishing
Ins talling the hoist Fi nish tower ca ble ladder a nd E-module work on
16:00 s ervi ce Checking
touchdown platform
hoi st WEC
17:00
18:00
Legend
E-module Spinner Machine house
Tower and tower base Service hoist Work steps without documents
11:00
Ins tall s hadow shutdown
12:00 Lunch D
13:00 ...Servi ce a
hoi st y
14:00
Spi nner Cl ea n WEC, s tow a way tools a nd prepare construction site clean up
4
15:00
16:00
Cl ea n WEC, s tow a way tools a nd prepare construction site clean up
17:00
18:00
Legend
E-module Spinner Machine house
Tower and tower base Service hoist Work steps without documents
1 Unload flat rack Check to ensure that materials are complete and take GC materials into tower.
1 Tower cable ladder pre- Unpack tower cable ladder, dispose of packaging materials, install DC busbars, install DC housing, pre-assemble
assembly tower cable ladder.
1 Route cables along tower cable Connect and lay out DC cables
ladder
1 Pack material and tool bags Pack tools and materials for machine house into tool bags (See TD-esc-02-de-xx-15-032).
(machine house)
1 Install tower lighting and bypass Install “LED tower lighting” adapter box, tower lighting
cables
1 Connect transformer Install transformer busbars, earthing, connect bonding bars between levels.
1 Route cables from level 2 to Lay cables out in first level, route cables into second level and lay out.
level 1
1 Control cabinet and secondary Route cables through floor duct, connect secondary systems cabinet, control cabinet, UPS cabinet, E-module
systems cabinet lighting, fan box connecting plate
1 Pack and distribute clamps Pack clamp bags for cable-pulling, for control cable/breakout cable lay out, etc.
1 Hoist machine house materials Hoist machine house materials, installation aid for E-101 nacelle, check top crossbeam, attach auxiliary winch.
incl. Installation V2 box and
auxiliary winch
1 Install door incl. hood and tower Install outside door, tower entrance electrical unit, install and dismantle 1 m and 2 m work platform.
entrance electrical unit
1 Connect generator Connect generator systems.
2 Prepare cable-pulling incl. po- Install deflection pad in tower base, position cable reels,
sitioning cable reels, etc.
2 Prepare bottom joint Prepare bottom cable joint.
2 Install electrics in machine Install machine house lighting, connect torque monitoring system, install machine house smoke detector
house and connect, check stator bridges, heating droplet separator, connect nacelle control cabinet.
2 Connect generator fan Generator fans.
3 Finish tower cable ladder and E- Lay out all other cables, install system disconnector, connect system disconnector, do finishing work on
module DC distribution system, LV distribution system terminal unit.
3 Install hoist touchdown platform Fasten hoist and safety cables, install safety guard in hoist cage, tension guide cable.
3 Clean WEC, stow away tools Clean WEC, stow away all tools, removing earthing, disconnect power supply, prepare container for
and prepare construction site transport.
clean up
4 Clean WEC, stow away tools Clean WEC, stow away all tools, removing earthing, disconnect power supply, prepare container for transport.
and prepare construction site
clean up
4 Connect bottom cable joint Connect bottom cable joint, connect nacelle power supply cable joint, connect rotor blade de-icing system cable
joint.
4 Finishing steps on service hoist Do all safety checks before making the first ascent, install components around the hoistway opening, install com-
ponents at the top crossbeam, install trailing cable restraint, install hoist cage safety guard, do functional check,
do finishing work, complete documents.
4 Check clamps and apply Loctite Triple U-clamps, double U-clamps
4 Dismantle winch and lower re- Dismantle cable pulling winch in reverse order. Pack up tools and remaining materials an lower.
maining materials
Preparation and finishing tasks as well as putting together the required materials and tools or cleaning up the work area are part of each work step and are
therefore not listed in the charts above. All applicable safety instructions for performing these tasks must be complied with.