2.Chipping shuttering concrete pouring of acid pump foundation 1151 and dyke wall
repairing
5. Shuttering steel fixing concrete pouring for repairing of prilling tower windows out
side at 106 floor
Hot permit
Chipping shuttering steel fixing concrete pouring at 116 v.b.f use drill machine