Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

1. Plant air point shifting inside CCR for live air breathing (hot and cold permit).

2. VBF A/C/D welding job (cold and hot permit).


3. Blinding of Ammonia circuit for 15-2101 (cold permit).
4. Scrapper fitting and overhauling (cold, rigging and scaffolding adjustment).
5. 17-1801/17 side packing placement and welding (cold and hot permit).
6. 17-1205-72 trolley overhauling (scaffolding erection and cold permit).
7. MBTL welding and rigging job (hot, cold, rigging and scaffolding adjustment).
8. 2308 box up (vessel entry and cold permit).
9. Flow meter adjustment on 106 F (hot permit).
10. Return duct installation job (hot cold and rigging) from 100 F-140 F & 140 F-164 F.
11. FFE (cold hot, rigging and scaffolding adjustment permits).
12. Startup Tank welding fabrication and insulation (hot, cold, scaffolding adjustment,
rigging and vessel entry).
13. CN Buffer welding and fabrication (hot, cold, scaffolding adjustment, rigging and
vessel entry).
14. 17-1111/1119 suction spool welding and rigging (hot and rigging permit).
15. 17-1103/23/83 (cold and rigging).
16. 17-1109/89/10/90 pump installation (hot, cold and rigging).
17. 15-1123/83/10/90 pump installation (hot, cold and rigging).
18. 15-1101 pump installation (rigging and cold).
19. Valves installation (cold and rigging). Valve installation at different location.
20. CN reactor flanges cutting / dismantling (cold, hot work-blanket and rigging).
21. 45-ton crane entry for CN reactor (vehicle entry and load lifting).
22. 15-2104 box up (cold and vessel entry permit).
23. 17-2127 box up (cold permit).
24. New Ammonia Preheater installation job at 100-F and 106-F (hot, cold, scaffolding
adjustment, rigging, general work and DPT permits).
shuttering steel fixing tile fixing repairing of drain channel at 100 near road no. 18

2.Chipping shuttering concrete pouring of acid pump foundation 1151 and dyke wall
repairing

3.scaffolding removing at 110 floor v.b.f

4. Shuttering concrete pouring steel fixing at 100 floor elevator

5. Shuttering steel fixing concrete pouring for repairing of prilling tower windows out
side at 106 floor

6. chipping for repairing of gully trap at 161

7. Chipping for repairing of 17 1009 foundation at 161 floor

8.Chipping and repairing of drain channel at 161 floor

Hot permit
Chipping shuttering steel fixing concrete pouring at 116 v.b.f use drill machine