Schedule of Material Submittals Submittal Register: No. of Copies Required Before Constr After Constr
Schedule of Material Submittals Submittal Register: No. of Copies Required Before Constr After Constr
Attachment 3
Page 1
PROJECT NO. PROJECT TITLE SOLICITATION/CONTRACT NO.
OTHER MATERIAL OR
RECOMMENDATIONS
COLOR SELECTION
CERTIFICATION OF
MANUFACTURER'S
MANUFACTURER'S
COMPLIANCE AND
DATE
SHOP DRAWINGS
DATE
RECEIVED RETURN
CATALOG DATA
INSTRUCTIONS
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, REQUIRED TO DATE CONTRACTOR NOTIFIED CONTRACTOR FINAL
LINE NUMBER
OPERATING
WARRANTY
CONTRACT DATE
CLOSEOUT
CLOSEOUT
DATE ENGR.
SAMPLES
ING
DATA
APPROVED DISAPPROVED
Within 10 days of
001 01 00 00 General Requirements - Submittal Register
2 NTP
1B-1
FA4600-11-B-0025
Attachment 3
Page 2
PROJECT NO. PROJECT TITLE SOLICITATION/CONTRACT NO.
OTHER MATERIAL OR
RECOMMENDATIONS
COLOR SELECTION
CERTIFICATION OF
MANUFACTURER'S
MANUFACTURER'S
COMPLIANCE AND
DATE
SHOP DRAWINGS
DATE
RECEIVED RETURN
CATALOG DATA
INSTRUCTIONS
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, REQUIRED TO DATE CONTRACTOR NOTIFIED CONTRACTOR FINAL
LINE NUMBER
OPERATING
WARRANTY
CONTRACT DATE
CLOSEOUT
CLOSEOUT
DATE ENGR.
SAMPLES
ING
DATA
APPROVED DISAPPROVED
NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.
LEGEND:
A - Include with line 9 Operations and Maintenance Manual
B - Include with line 10 Warranty Book
C - Include with line 14 Color Samples