FA4600-11-B-0025

Attachment 3
Page 1
PROJECT NO. PROJECT TITLE SOLICITATION/CONTRACT NO.

SCHEDULE OF MATERIAL SUBMITTALS


SUBMITTAL REGISTER

TO BE COMPLETED BY PROJECT ENGINEER / CONTRACTOR

NO. OF COPIES REQUIRED


BEFORE CONSTR AFTER CONSTR

OTHER MATERIAL OR
RECOMMENDATIONS
COLOR SELECTION

CERTIFICATION OF
MANUFACTURER'S

MANUFACTURER'S
COMPLIANCE AND
DATE

SHOP DRAWINGS
DATE
RECEIVED RETURN

CATALOG DATA

INSTRUCTIONS
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, REQUIRED TO DATE CONTRACTOR NOTIFIED CONTRACTOR FINAL
LINE NUMBER

IN SUSPENSE FOLLOW-UP REMARKS


TYPE OF SUBMITTAL SUBMITTAL CIVIL RESUBMITTAL APPROVAL

OPERATING
WARRANTY
CONTRACT DATE

CLOSEOUT

CLOSEOUT
DATE ENGR.

SAMPLES
ING

DATA
APPROVED DISAPPROVED
Within 10 days of
001 01 00 00 General Requirements - Submittal Register
2 NTP

1B-1
FA4600-11-B-0025
Attachment 3
Page 2
PROJECT NO. PROJECT TITLE SOLICITATION/CONTRACT NO.

SCHEDULE OF MATERIAL SUBMITTALS


SUBMITTAL REGISTER

TO BE COMPLETED BY PROJECT ENGINEER / CONTRACTOR

NO. OF COPIES REQUIRED


BEFORE CONSTR AFTER CONSTR

OTHER MATERIAL OR
RECOMMENDATIONS
COLOR SELECTION

CERTIFICATION OF
MANUFACTURER'S

MANUFACTURER'S
COMPLIANCE AND
DATE

SHOP DRAWINGS
DATE
RECEIVED RETURN

CATALOG DATA

INSTRUCTIONS
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, REQUIRED TO DATE CONTRACTOR NOTIFIED CONTRACTOR FINAL
LINE NUMBER

IN SUSPENSE FOLLOW-UP REMARKS


TYPE OF SUBMITTAL SUBMITTAL CIVIL RESUBMITTAL APPROVAL

OPERATING
WARRANTY
CONTRACT DATE

CLOSEOUT

CLOSEOUT
DATE ENGR.

SAMPLES
ING

DATA
APPROVED DISAPPROVED

NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.
LEGEND:
A - Include with line 9 Operations and Maintenance Manual
B - Include with line 10 Warranty Book
C - Include with line 14 Color Samples