FactSheet 1 NRP 205x292 6Pg

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

New Runway

Project
Perth Airport is investing in an important
piece of infrastructure for Western Australia.
The new runway will see Perth Airport continue
to connect lives, businesses and communities
to a world full of possibilities.

Connecting people and places


Furthering Western Australia’s social and
cultural development and connecting
WA to the world

Supporting business
Providing essential transport services and
supporting WA’s economic development

Engaging with community


Keeping you informed and encouraging
your participation
The WA Government’s State
Aviation Strategy (2015),
found that a new runway,
“will benefit all users,
improving reliability, reducing
delays and permitting peak-
period demand growth across
interstate and international
sectors, as well as resource
and other intrastate users.”

Why do we need a new runway?


The need for an additional runway at Perth Airport was
first recommended more than 40 years ago by a joint
Commonwealth and State Government commission
investigating Perth’s planning requirements. Were alternatives
investigated?
Modelling shows that an additional The airport will become much busier Instead of building a new runway,
runway is needed when the number whether or not the new runway is built. several other options were investigated.
of flights exceeds 145,000 per year. In These included increasing the use of,
However, there will come a stage
2013, flight numbers peaked at more or expanding other airports around
when the additional runway will allow
than 151,000 resulting in significant Perth, extending Perth Airport’s existing
more flights than the current runway
delays to airlines and passengers. runways, and a second airport for Perth.
system can accommodate.
Perth Airport’s existing runways still An exhaustive assessment of each
The new runway will also allow better
reach capacity during peak periods, found the only viable option was adding
management of the air traffic growth
resulting in delays to flights and a new parallel runway at Perth Airport.
that’s already occurring, thereby
disruption to travellers. For more information on alternative
improving efficiency, customer service
options investigated please visit
The number of annual flights is forecast and the effectiveness of operations.
newrunway.com.au.
to keep growing, reaching 172,000 by
2025 and 241,000 by 2045.

It is planned that the new runway will


The new runway represents
be operational between 2023 and
the best option to support the
2028. The actual year is dependent
international competitiveness
upon reaching commercial agreement
of the State’s critical export
with airlines and expected demand
which could mean the new runway is
operational even later. 241,000 industries, including resources,
tourism, international study
and agriculture.
forecast annual flights by 2045
Perth Airport is the only The new runway will facilitate
aerodrome that supports safe, effective and efficient air
Planning for the new runway large passenger aircraft in services for Perth and Western
commenced in the early 1970s. the Perth region. Australia well into the future.

New runway timeline


What does constructing a new 1970s planning PLAN

runway involve?
commenced
LOCATE 1984 location for
parallel runway
at Perth Airport
The new runway will occupy 293 hectares, be 3,000 metres long identified
and will be located parallel to the existing main runway with a 2008 – 2012 GROWTH
2km separation so that both can be used independently. dramatic and
unforecast growth
INVEST 2010 – 2014
$250m airfield

293 hectares investment


program to
improve capacity
Construction will take four to five years, with construction at Perth Airport
generally taking place between 7am and 7pm, Monday to Saturday 2014 Master MASTER PLAN
Plan approved 2014
including how the
The new runway will also include taxiways, lighting, new runway would
navigational aids, other ground-based infrastructure likely operate
and emergency response facilities. and timing
21R
A draft airspace management plan for the proposed DESIGN 2013 – 2017
new flight paths has been completed. This will be technical studies
and design work
finalised by Airservices Australia prior to opening of
the new runway. 21L 2018 public COMMENT
comment
Grogan Road, which crosses the new runway’s
APPROVAL Anticipated
footprint, will be closed permanently.
2019 approval and
A decision on the future of the existing cross runway decision to build
will be made once the new runway is operational and 2km 4 years to CONSTRUCT
there is a possibility that it will close. construct
03L
OPEN 2023 – 2028
opening subject to
03R actual demand and
airline commercial
agreement
$2.5b
INVESTMENT
The new runway forms part
of a privately funded $2.5b
investment program over the
next decade at Perth Airport.

What is the impact of the new runway?


The new runway project has been designed to minimise or avoid effects on environment and heritage
on the airport estate, as much as reasonably practicable. Extensive technical studies to design, assess
and mitigate the effect of the new runway on geology, water flow, flora and fauna, ground-based noise,
air quality, visual impact, and aircraft operations have been undertaken.

The environment Munday Swamp Aircraft noise


It is important to Perth Airport for Munday Swamp is important to There are three airports in the Perth
the runway’s development to achieve Aboriginal people. So, we have area, so all residents experience noise
positive environmental outcomes. shortened the new runway to 3,000 of varying levels from aircraft flying
However, it is unavoidable that some metres and moved it further south, overhead from time to time.
areas of environmental significance although a small part of the swamp
When the new runway opens,
will be affected, mostly through the area will be unavoidably affected by
exposure to aircraft noise will be
clearing of land. the new runway.
unchanged for most metropolitan
Where bird and animal habitat are residents. For some, there will be a
affected, an offset strategy will To better protect Munday reduction while for others, there will
identify and secure appropriate sites Swamp we’ve shortened the be an increase. Over time, the number
elsewhere in the Swan Coastal area, new runway by 800m and of flights will grow over all areas.
consistent with the Commonwealth’s moved it south For more information on proposed
Environmental Offsets Policy (2012).
new flight path, or to visit our
For further information on the For more information on environmental interactive aircraft noise portal please
Commonwealth Department of impacts and the mitigating strategies, visit newrunway.com.au
Environment and Energy’s Offset Policy, please visit newrunway.com.au
please visit environment.gov.au
What are the benefits of a new runway?
The new runway will allow more Tourism

$2.39b
efficient scheduling of regional, Air services are vital to WA’s tourism
domestic and international flights, industry and the jobs it supports.
while improving connectivity between More than 90 per cent of visitors to
business, tourism and employment, all WA come by air, with most arriving increase in real income
which support WA’s economic growth. at Perth Airport. Spending by nationally in first two
international and domestic tourists decades of operation
Social and Cultural Benefits helps to drive the WA economy.
Western Australians rely on air transport
more than most other Australians for Supporting the resource sector
work, education, recreation, health,
and to visit friends and family.

Perth Airport connects with more


Most fly-in fly-out workers are from the
Perth and Peel regions and rely on flights
with narrow departure windows, which
$1.72b
are generally in the morning. The new
lost tourism expenditure
than 50 intrastate, interstate, and
runway will help to prevent costly delays over 20 years if the runway
international destinations.
to both airlines and resource companies. is not built
The new runway will enhance
and develop new services to new Productivity improvements
destinations. Airlines will be able to more efficiently
manage departures and arrivals and
Employment reduce delays, saving on maintenance,
Perth Airport is a major employment crew and fuel costs.

$887m
centre. In 2014, the number of people
employed (both directly and indirectly) It costs leisure travellers almost $50
was estimated at 12,570 aviation and for every hour they are delayed and for
5,230 non-aviation-related full-time business travellers it’s more than $155.
how much businesses will
employees. By 2045, the new runway is forecast to
save by 2045 from avoided
deliver a cumulative economic benefit
During construction, the new runway delays
of $2.39 billion.
will create 744 full-time jobs.
In 2013, the State Government

$72m/yr
estimated that congestion at Perth
Airport was costing the airline industry

17,800 and its passengers an estimated


$72 million a year. cost to airline industry and
passengers
number of people employed
directly and indirectly
N
Grea
t Ea
stern
Hwy B
ypass Community
engagement
Kala
m und
a Rd

ay
Have your say

d
ton R
W General
c
pa
A Aviation
We appreciate that it is
New
Area

Airport important for you to be fully


ve
d

y R A
Hw fe a
lif an
as
te
r n
Re
dc
B
un
g
North informed about major projects
tE
ea
Gr
at Perth Airport that may affect
21R
you. Therefore, Perth Airport
Airport Fa
un
tle is committed to effective and
West ro

24
y
A
ve transparent engagement with
Av
e the community.
ey
Redcliffe Brea r l
Ross Dr

Station
Before we undertake any
Rd
Snook
significant development at
Rd

/24
06
ler
nreath Dr

Mil

AY Perth Airport, we must prepare


N W
e
Av RU
ud S
a Major Development Plan and
Du

Bo OS
CR
y
Hw

submit it to the Commonwealth


kin n
To

Minister for Infrastructure and


06

Transport for consideration.


This is required under both the
Airport
Central
Commonwealth Airports Act
21R

d
dy R

Station
21L
1996 and the Commonwealth
03 L /

rbird La

Environment Protection and


WAY

Rd
Suga

Biodiversity Conservation Act


ck
RUN

Affle

1999.
MAIN

Grogan Rd

Airport
Our proposal to construct a
Central
new runway requires an Major
Dr
iller

Development Plan.
ie M

L /21

tt Rd
Horr

Forrestfield
The Major Development Plan
03 R

Abbo

Palt
Station
ridg
y

e
provides an outline of what the
WAY

Rd
n Hw

Hudswell Rd
Tonki

project includes and what Perth


RUN

as Rd

03L
Airport is doing to mitigate or
Dund
NEW

manage the impacts.

Airport
Dr
The Major Development Plan is
available for public comment
d
ethy R

Searl
e Rd
for 60 business days starting in
Abern

Airport mid 2018.


South Ta
rlt
o nC
r
Dubs
Cl Your feedback and formal
Reid Rd
submission is an important
part of the Major Development
y
Hw

Plan consultation process.


ch
a
Le

03R
Before presenting the Major
Development Plan to the
Commonwealth Minister for
d
R
le
da

To
consideration, we will consider
w

nkin
Ke

Hw
y
all submissions.
Terminal 1 Current Runways Visit newrunway.com.au for
Terminal 2 Proposed New Runway further information and follow
Rd
y
Hw

Abern e t hy
the links to complete an online
e

Air Traffic Control Tower


Ro

Terminal 3
submission.
Terminal 4 Railway Line & Stations

Airport Boundary Public Viewing Area


WAC1964 05.18

0 500 1,000

METRES

FIND OUT MORE facebook.com/perthairport


For more information about the new runway project and twitter.com/@PerthAirport
to register to receive updates visit newrunway.com.au instagram.com/perthairport

You might also like