Mechanic Training
Mechanic Training
Mechanic Training
2 Set Top link Position Must be Maintain Horizontal to the Ground Yes / No
4 Connect The PTO Joint ,Maintain Shear Bolt Position must be Baler Side Yes / No
Based on Tractor to cut the P.T.O Joint Ensure End Floating Clearance must be
Yes / No
5 1” inch in all Positions of the baler.
If Tractor Height Too Low From Ground Like (MF 241) Provide Guard for P.T.O
Yes / No
6 Ensure Straw Not Rotating on P.T.O Joint.
7 Ensure Wiring Kit Not touching to the PTO,During Straw Rotating Period. Yes / No
If any Wiring Damages coming due to improper installation this is not come
OK / Not Ok
8 under warranty
9 Maintain Switch Button Box must be Right Side of the Drive seat Yes / No
Train the driver for twine mounting Procedure and take them understand the
importance of the free movement of the Twine Yes / No
10
BALER SERVICE TRAINING GUIDELINES
D. FIELD OPERATION
S.No Check Points Status
Initially Put Tractor Gear Mode in L1 and maintain Baler Height (Tyre) From
1 Yes / No
Ground is 2”(Tyre)
2 If Buzzer is coming Stop Tractor ensure winding Properly done Yes / No
3 If Winding Complete , 3rd Buzzer Coming means then Eject the bale. Yes / No
Check Weight of the Bale, Tightness of The Bale if it is Ok Don’t Touch the
4 Yes / No
Limit switch stopper Bolt
5 Yes / No
If Bale Weight is too high increase the stopper bolt Height upto 4 to 5 Threads
6 If Bale weigh is too low reduce the stopper bolt height upto 4 to 5 Threads Yes / No
2 If Twine is cutting Right End Adjustment Procedure Same For Previous One Yes / No
For Double Winding To adjust the Tension Roller Spring based on twine
3 Yes / No
thikness 3 layer and 4 LBS