Definicja Pojęcia 1 z 56
The side of the PCB that the solder flows Primary Side
toward in through-hole technology. The
destination is is normally the primary side of
the PCB, but might be the secondary side in
some cases.

Prawda

Fałsz

Pojęcia Definicja 2 z 56
Inspection Methodology The internal result of an unwanted application
of electrical energy that results in damaged
components.

Prawda

Fałsz

Pojęcia Definicja 3 z 56
A defect for Class 1... A condition that, while not necessarily
perfect, will maintain integrity and reliability
of the assembly

Prawda

Fałsz

Definicja Pojęcia 4 z 56
All handling, unpacking and assembly shall be What should be done to prevent ESD and
performed at a static-controlled workstation. EOS damage to sensitive components?

Prawda

Fałsz

https://quizlet.com/18525625/test?answerTermSides=6&promptTermSides=6&questionCount=56&questionTypes=12&showImages=true 1/16
14.09.2023, 17:37 Test: IPC A 610 | Quizlet

Pojęcia Definicja 5 z 56
Order of Precedence in event of conflict 1 Master drawing or master ass. drawing
reflecting the customer's detailed
requirements.

Prawda

Fałsz

Definicja Pojęcia 6 z 56
Terms and definitions for interconnecting and IPC-T-50
packaging electronic circuits.

Prawda

Fałsz

Pojęcia Definicja 7 z 56
Primary Side The side of a packaging or interconnecting
structure (PCB) defined as primary on the
master drawing. This is usually the side with
the most complex or greatest number of
components.

Prawda

Fałsz

Pojęcia Definicja 8 z 56
A main goal of the IPC Professional Training granted to individuals, not the employing
and Certification Programs is to... company. Certifications are personal property
and are retained when changing employment.

Prawda

Fałsz

https://quizlet.com/18525625/test?answerTermSides=6&promptTermSides=6&questionCount=56&questionTypes=12&showImages=true 2/16
14.09.2023, 17:37 Test: IPC A 610 | Quizlet

Definicja Pojęcia 9 z 56
Master drawing or master ass. drawing Order of Precedence in event of conflict 1
reflecting the customer's detailed
requirements.

Prawda

Fałsz

Definicja Pojęcia 10 z 56
No. Are eating, drinking or use of tobacco
products in the work area permitted?

Prawda

Fałsz

Definicja Pojęcia 11 z 56
A wire/lead is wrapped more than 360 Wire OverLAP
degrees and crosses over itself (and does not
remain in contact with the terminal post).

Prawda

Fałsz

Definicja Pojęcia 12 z 56
Certified IPC Specialist training programs will What can cause a cold solder connection?
train, test and certify in the correct
application of the criteria for all product
classes.

Prawda

Fałsz

https://quizlet.com/18525625/test?answerTermSides=6&promptTermSides=6&questionCount=56&questionTypes=12&showImages=true 3/16
14.09.2023, 17:37 Test: IPC A 610 | Quizlet

Pojęcia Definicja 13 z 56
Meniscus (component) The actual measurements provided in this
document (i.e., specific part mountings and
solder fillet dimensions and determination of
percentages) are not required except for
referee purposes.

Prawda

Fałsz

Pojęcia Definicja 14 z 56
Wire OverWRAP A wire/lead is wrapped more than 360
degrees and crosses over itself (and does not
remain in contact with the terminal post).

Prawda

Fałsz

Definicja Pojęcia 15 z 56
The manufacturer, based on design, service Who as the ultimate responsibility for
and customer requirements. identifying the class to which the assembly is
evaluated?

Prawda

Fałsz

Definicja Pojęcia 16 z 56
magnification power inspection range of 7.5x Certified IPC Specialist recertification may be
to 10x and a maximum referee of 20x. provided by...

Prawda

Fałsz

https://quizlet.com/18525625/test?answerTermSides=6&promptTermSides=6&questionCount=56&questionTypes=12&showImages=true 4/16
14.09.2023, 17:37 Test: IPC A 610 | Quizlet

Definicja Pojęcia 17 z 56
The form, fit or function of the assembly is An applicant who completes the training
inadequate for use in its end use environment. course but fails to pass the certification
measurement criteria can retest not sooner
than 24 hours nor more than _ days following
the original testing, except as authorized in
writing by IPC's director of certification.

Prawda

Fałsz

Definicja Pojęcia 18 z 56
Invokes a requirement for manufacturers of all Class 2 Product
classes or product, and failure to comply with
the requirement is a noncompliance to this
standard.

Prawda

Fałsz

Pojęcia Definicja 19 z 56
Any violation of minimal electrical clearance any Master IPC Trainer or Certified IPC
is a... Trainer.

Prawda

Fałsz

Definicja Pojęcia 20 z 56
Dedicated Service Electronic Product - Class 2 Product
Continued performance and extended life
required. Uninterrupted service is desired but
not required.

Prawda

Fałsz

https://quizlet.com/18525625/test?answerTermSides=6&promptTermSides=6&questionCount=56&questionTypes=12&showImages=true 5/16
14.09.2023, 17:37 Test: IPC A 610 | Quizlet

Definicja Pojęcia 21 z 56
IPC-1-610 when invoked by the customer or Order of Precedence in event of conflict 1
contract.

Prawda

Fałsz

Definicja Pojęcia 22 z 56
Body salts and oils, and unauthorized hand Certified IPC Specialist recertification may be
creams. provided by...

Prawda

Fałsz

Pojęcia Definicja 23 z 56
Solder source side The side of the PCB that the solder flows
toward in through-hole technology. The
destination is is normally the primary side of
the PCB, but might be the secondary side in
some cases.

Prawda

Fałsz

Definicja Pojęcia 24 z 56
General Electronics Product - includes Class 1 Product
products where the major requirement is
function of the completed assembly.

Prawda

Fałsz

Pojęcia Definicja 25 z 56
Process indicators should be... A condition (not a defect) that does not affect
the form, fit or function of a product.

Prawda

Fałsz

https://quizlet.com/18525625/test?answerTermSides=6&promptTermSides=6&questionCount=56&questionTypes=12&showImages=true 6/16
14.09.2023, 17:37 Test: IPC A 610 | Quizlet

Definicja Pojęcia 26 z 56
A condition that is close to perfect, but is not Target Condition
always achievable and may not be necessary
to ensure the reliability of the assembly.

Prawda

Fałsz

Definicja Pojęcia 27 z 56
Prevents an electrostatic discharge from Static Sheilding Packaging
passing through the package and into the
assembly causing damage.

Prawda

Fałsz

Definicja Pojęcia 28 z 56
any Master IPC Trainer or Certified IPC Is disposition of individual process indicators
Trainer. required?

Prawda

Fałsz

28 pytań wielokrotnego wyboru

Pojęcia 1 z 56
Antistatic (low charging) packaging materials

Used to provide inexpensive cushioning and intermediate packaging for ESD sensitive
(ESDS) items.

defect condition for all classes.

the component side, or the solder destination side (in through-hole mounting
technology).

The rapid transfer of static electric charge from one object to another of a different
potential that was created from electrostatic sources.

https://quizlet.com/18525625/test?answerTermSides=6&promptTermSides=6&questionCount=56&questionTypes=12&showImages=true 7/16
14.09.2023, 17:37 Test: IPC A 610 | Quizlet

Pojęcia 2 z 56
The Primary Side is also known as...

The internal result of an unwanted application of electrical energy that results in


damaged components.

the component side, or the solder destination side (in through-hole mounting
technology).

A condition (not a defect) that does not affect the form, fit or function of a product.

The side of a packaging or interconnecting structure (PCB) defined as primary on the


master drawing. This is usually the side with the most complex or greatest number of
components.

Pojęcia 3 z 56
Examples and illustrations...

The internal result of an unwanted application of electrical energy that results in


damaged components.

Prevents an electrostatic discharge from passing through the package and into the
assembly causing damage.

The rapid transfer of static electric charge from one object to another of a different
potential that was created from electrostatic sources.

are often grossly exaggerated in order to depict the reasons for this classification.

https://quizlet.com/18525625/test?answerTermSides=6&promptTermSides=6&questionCount=56&questionTypes=12&showImages=true 8/16
14.09.2023, 17:37 Test: IPC A 610 | Quizlet

Pojęcia 4 z 56
How long are IPC certs good for?

A condition that is neither a defect, nor a process indicator. A condition not specified
may be considered acceptable unless it can be established that the condition affects
user-defined form, fit or function.

Master IPC Trainer, Certified IPC Trainer, and Certified IPC Specialist certifications
expire after two years. Certification is valid through the last day of the month,
regardless of the day of the month the certification was granted.

The actual measurements provided in this document (i.e., specific part mountings and
solder fillet dimensions and determination of percentages) are not required except for
referee purposes.

Excessive impurities in the solder, inadequate cleaning prior to the soldering, and/or
insufficient application of heat during the soldering process.

Pojęcia 5 z 56
The tolerance for magnification aides is...

1000lm/m2 [approximately 93 foot candles].

+/- 14% of the selected magnification power.

+/- 15% of the selected magnification power.

+/- 20% of the selected magnification power.

Pojęcia 6 z 56
An applicant who completes the training course but fails to pass the certification measurement
criteria can retest not sooner than 24 hours nor more than _ days following the original testing,
except as authorized in writing by IPC's director of certification.

The form, fit or function of the assembly is inadequate for use in its end use
environment.

Procurement documents

Yes.

90

https://quizlet.com/18525625/test?answerTermSides=6&promptTermSides=6&questionCount=56&questionTypes=12&showImages=true 9/16
14.09.2023, 17:37 Test: IPC A 610 | Quizlet

Pojęcia 7 z 56
Acceptable Condition

A condition that is neither a defect, nor a process indicator. A condition not specified
may be considered acceptable unless it can be established that the condition affects
user-defined form, fit or function.

A condition that, while not necessarily perfect, will maintain integrity and reliability of
the assembly

A wire/lead that is wrapped more than 360 degrees and remains in contact with the
terminal post.

A condition (not a defect) that does not affect the form, fit or function of a product.

Definicja 8 z 56
A condition that is neither a defect, nor a process indicator. A condition not specified may be
considered acceptable unless it can be established that the condition affects user-defined
form, fit or function.

Acceptable Condition

Cold Solder Connection

Target Condition

Conditions Not Specified

Pojęcia 9 z 56
Cold Solder Connection

automatically implies a defect for Class 2 and 3. A defect for Class 2 implies a defect for
Class 3.

A solder connection that exhibits poor wetting and that is characterized by a grayish
porous appearance.

A condition that is neither a defect, nor a process indicator. A condition not specified
may be considered acceptable unless it can be established that the condition affects
user-defined form, fit or function.

Prevents an electrostatic discharge from passing through the package and into the
assembly causing damage.

https://quizlet.com/18525625/test?answerTermSides=6&promptTermSides=6&questionCount=56&questionTypes=12&showImages=true 10/16
14.09.2023, 17:37 Test: IPC A 610 | Quizlet

Pojęcia 10 z 56
Electrical Overstress (EOS)

The inspector does not select the class for the assembly under inspection.

The actual measurements provided in this document (i.e., specific part mountings and
solder fillet dimensions and determination of percentages) are not required except for
referee purposes.

The internal result of an unwanted application of electrical energy that results in


damaged components.

A solder connection that exhibits poor wetting and that is characterized by a grayish
porous appearance.

Pojęcia 11 z 56
Describe the ESD susceptibility symbol.

Body salts and oils, and unauthorized hand creams.

monitored as part of the process control system

A condition (not a defect) that does not affect the form, fit or function of a product.

A triangle with a reaching hand and a slash across both.

Pojęcia 12 z 56
Process Indicator Conditions

A condition (not a defect) that does not affect the form, fit or function of a product.

A condition that is neither a defect, nor a process indicator. A condition not specified
may be considered acceptable unless it can be established that the condition affects
user-defined form, fit or function.

A land that is not connected electrically to the conductive pattern on its layer.

monitored as part of the process control system

https://quizlet.com/18525625/test?answerTermSides=6&promptTermSides=6&questionCount=56&questionTypes=12&showImages=true 11/16
14.09.2023, 17:37 Test: IPC A 610 | Quizlet

Pojęcia 13 z 56
Should work areas be kept clean and neat?

Yes

No

Pojęcia 14 z 56
Class 3 Product

Sealant or encapsulant on a lead, protruding from the seating plane of the component.
This includes ceramic, epoxy or other composites, and flash from molded components.

A condition that is close to perfect, but is not always achievable and may not be
necessary to ensure the reliability of the assembly.

A condition that is neither a defect, nor a process indicator. A condition not specified
may be considered acceptable unless it can be established that the condition affects
user-defined form, fit or function.

High Performance Electrical Product - Continued high performance or performance-


on-demand is critical. Equipment downtime cannot be tolerated. Equipment might be
used for life-support or other critical systems.

Pojęcia 15 z 56
What can cause a cold solder connection?

provide an understanding of accept/reject criteria to enhance an individual's ability


and motivation to consistently and correctly apply the technical discrimination criteria.

Excessive impurities in the solder, inadequate cleaning prior to the soldering, and/or
insufficient application of heat during the soldering process.

Master IPC Trainer, Certified IPC Trainer, and Certified IPC Specialist certifications
expire after two years. Certification is valid through the last day of the month,
regardless of the day of the month the certification was granted.

The rapid transfer of static electric charge from one object to another of a different
potential that was created from electrostatic sources.

https://quizlet.com/18525625/test?answerTermSides=6&promptTermSides=6&questionCount=56&questionTypes=12&showImages=true 12/16
14.09.2023, 17:37 Test: IPC A 610 | Quizlet

Definicja 16 z 56
The actual measurements provided in this document (i.e., specific part mountings and solder
fillet dimensions and determination of percentages) are not required except for referee
purposes.

Inspection Methodology

Conditions not Specified

Examples and Illustrations...

Verification of Dimensions

Pojęcia 17 z 56
Nonfunctional Land

A condition (not a defect) that does not affect the form, fit or function of a product.

A land that is not connected electrically to the conductive pattern on its layer.

A condition that, while not necessarily perfect, will maintain integrity and reliability of
the assembly

The inspector does not select the class for the assembly under inspection.

Pojęcia 18 z 56
Disposition

The inspector does not select the class for the assembly under inspection.

The side of a packaging or interconnecting structure (PCB) defined as primary on the


master drawing. This is usually the side with the most complex or greatest number of
components.

The side of the PCB to which solder is applied. This is usually the secondary side, but
might be the primary side in some cases.

The determination of how defects should be treated. These include rework, use as is,
scrap, and repair.

https://quizlet.com/18525625/test?answerTermSides=6&promptTermSides=6&questionCount=56&questionTypes=12&showImages=true 13/16
14.09.2023, 17:37 Test: IPC A 610 | Quizlet

Pojęcia 19 z 56
IPC Certifications are personal and portable credentials...

Used to provide inexpensive cushioning and intermediate packaging for ESD sensitive
(ESDS) items.

granted to individuals, not the employing company. Certifications are personal


property and are retained when changing employment.

Certified IPC Specialist training programs will train, test and certify in the correct
application of the criteria for all product classes.

A condition (not a defect) that does not affect the form, fit or function of a product.

Definicja 20 z 56
The rapid transfer of static electric charge from one object to another of a different potential
that was created from electrostatic sources.

Electrical Overstress (eos)

Electrostatic Discharge (ESD)

Electromagnetic interference

Meniscus (component)

Pojęcia 21 z 56
Illumination at the surface of workstations should be at least _

no.

the customer.

1000lm/m2 [approximately 93 foot candles].

+/- 15% of the selected magnification power.

https://quizlet.com/18525625/test?answerTermSides=6&promptTermSides=6&questionCount=56&questionTypes=12&showImages=true 14/16
14.09.2023, 17:37 Test: IPC A 610 | Quizlet

Pojęcia 22 z 56
If documents other than IPC-A-610 are cited, the order of precedence shall be defined in the _

Procurement documents

Fulfillment documents

Conditions of the contract

The agreement

Definicja 23 z 56
shadows

Light sources should be selected to prevent _.

What can cause a cold solder connection?

The tolerance for magnification aides is...

Solder source side

Pojęcia 24 z 56
Is disposition of individual process indicators required?

Yes

No

Pojęcia 25 z 56
Who as the ultimate responsibility for identifying the class to which the assembly is evaluated?

The Customer.

Information Flows.

Product Flows.

Efficient Operations.

https://quizlet.com/18525625/test?answerTermSides=6&promptTermSides=6&questionCount=56&questionTypes=12&showImages=true 15/16
14.09.2023, 17:37 Test: IPC A 610 | Quizlet

Pojęcia 26 z 56
Certified IPC Trainers are authorized to grant a single extension of _ days to a certified IPC
specialist. Such exceptions should be noted on the certification document.

1000lm/m2 [approximately 93 foot candles].

any Master IPC Trainer or Certified IPC Trainer.

90

No.

Pojęcia 27 z 56
Who do you swear to?

SUPERMAN

SHADOWS

BATMAN

HULK

Pojęcia 28 z 56
Materials authorized for reproduction by the user will be so identified and provided by IPC in
____ format, e.g. student training materials (previously called student handbooks)

electronic

procurement documents

pneumatic

mechanical

https://quizlet.com/18525625/test?answerTermSides=6&promptTermSides=6&questionCount=56&questionTypes=12&showImages=true 16/16

You might also like