ASSOCIATED ARCHITECTS
TRANSMITTAL
TO Pomerleau Construction
185 The West Mall, suite 1100
Toronto, ON, M9C 5L5
Dear Ryan,
Best regards,
Ryan Mitchell
ENCLOSED:
PGE-UTAT--Shop-Drawing-Submittal---Bus-Ducts
General Comments
General comments below shall be read in conjunction with shop drawing review comments and mark-ups made on the
submittal attached herewith.
1. SHORT CIRCUIT RATING NOT REVIEWED. REQUIRE POWER COORDINATION STUDY PRIOR REVIEWING.
2. CONFIRM COPPER BARS HAVE A MINIMUM 98% CONDUCTIVITY
3. PLUG-IN UNITS SHALL PERMIT CONNECTION OF DISCONNECT SWITCHES THAT ARE BREAKER TYPE.
4. PLUG-IN BUSWAYS SHALL CONFORM TO CSA C22.2 NO.27. PROVIDE 10 PLUG-IN OPENINGS PER 3m
SECTION WITH 5 PER SIDE FOR CONNECTION OF PLUG-IN UNITS. PLUG-IN OPENINGS SHALL BE PROVIDED
WITH. ACCESS COVERS AND RIGID MOULDED INSULATORS. ALL OPENINGS TO BE USABLE AT SAME TIME.
5. VOLTAGE DROP TEST RESULT TO BE PROVIDED FOR EACH SIZE OF BUSWAY
Responsible PLAN GROUP INC. Received From Mike Porto (PLAN GROUP INC.)
Contractor
Submit By
Cost Code
Approvers Domenic Francone (POMERLEAU INC.), Ryan Mitchell (MACLENNAN JAUNKALNS MILLER ARCHITECTS LTD.), Contract
Admin Toronto (SMITH AND ANDERSEN CONSULTING ENGINEERING)
Ball in Court Ryan Mitchell (MACLENNAN JAUNKALNS MILLER ARCHITECTS LTD.), Contract Admin Toronto (SMITH AND ANDERSEN
CONSULTING ENGINEERING)
Distribution Michael Baioff (SMITH AND ANDERSEN CONSULTING ENGINEERING), Paul Gargaro (UNIVERSITY OF TORONTO), Adrian
Phillips (UNIVERSITY OF TORONTO), Omar Khan (SMITH AND ANDERSEN CONSULTING ENGINEERING), Contract Admin
Toronto (SMITH AND ANDERSEN CONSULTING ENGINEERING), Roy Cloutier (PATKAU ARCHITECTS INC), Leland Dadson
(MACLENNAN JAUNKALNS MILLER ARCHITECTS LTD.), Ryan Mitchell (MACLENNAN JAUNKALNS MILLER ARCHITECTS
LTD.), Nick Gallos (PLAN GROUP INC.), Michael Moreau (PLAN GROUP INC.), Jeremy Brown (PLAN GROUP INC.), Prabhjot
SINGH (PLAN GROUP INC.), Dave Teoli (PLAN GROUP INC.), Mohamed Mamdouh (PLAN GROUP INC.), Ethan Lalonde
(PLAN GROUP INC.), Soha Rahmani (PLAN GROUP INC.), Jonathan Mateer (PLAN GROUP INC.), Tony Tamburello (PLAN
GROUP INC.), Ken GIBSON (PLAN GROUP INC.), Scot Burgess (PLAN GROUP INC.), Richard Sinclair (PLAN GROUP INC.),
Mike Porto (PLAN GROUP INC.), Domenic Francone (POMERLEAU INC.), Cameron Goss (POMERLEAU INC.), Vatsal Dave
(POMERLEAU INC.), Jorge Pimentel (POMERLEAU INC.), Kristopher Deutschendorf (POMERLEAU INC.), Aaron Odd
(POMERLEAU INC.), Douglas Gair (POMERLEAU INC.), Kateryna Lytovchenko (POMERLEAU INC.), Adam Phillips
(POMERLEAU INC.), Ryan Going (POMERLEAU INC.)
Description Hi
Please find attached Busways (26 25 00) Shop Drawing submittal for your review.
As part of this feedback, please ensure all associated Consultant input is provided.
Note: This item is a long lead time and would require timely response in order
to avoid any delays in procurement.
Thanks!
LEED No
Submittal Workflow
Name Sent Date Due Date Returned Date Response Attachments
Domenic Francone 12 Jul, 2023 19 Jul, 2023 17 Jul, 2023 Reviewed as Noted PGE-UTAT- Shop Drawing Submittal - Bus
Ducts-12 Jul 2023 POM
Reviewed.pdf (Current)
Comment 1) Clarify "splash proof" is the same as sprinkler proof as per specifications.
2) Please submit detailed isometric drawings including elevations.
Submittal
Project: UTAT AWD 07/12/2023
Date:
100 Devonshire Place,
Address:
Toronto
File / Submittal
PGE - File No. 20
No. :
Specification: 26 25 00
Included: Busways
General Comments
General comments below shall be read in conjunction with shop drawing review comments and mark-ups made on the
submittal attached herewith.
1. SHORT CIRCUIT RATING NOT REVIEWED. REQUIRE POWER COORDINATION STUDY PRIOR REVIEWING.
2. CONFIRM COPPER BARS HAVE A MINIMUM 98% CONDUCTIVITY
3. PLUG-IN UNITS SHALL PERMIT CONNECTION OF DISCONNECT SWITCHES THAT ARE BREAKER TYPE.
4. PLUG-IN BUSWAYS SHALL CONFORM TO CSA C22.2 NO.27. PROVIDE 10 PLUG-IN OPENINGS PER 3m
SECTION WITH 5 PER SIDE FOR CONNECTION OF PLUG-IN UNITS. PLUG-IN OPENINGS SHALL BE PROVIDED
WITH. ACCESS COVERS AND RIGID MOULDED INSULATORS. ALL OPENINGS TO BE USABLE AT SAME TIME.
5. VOLTAGE DROP TEST RESULT TO BE PROVIDED FOR EACH SIZE OF BUSWAY
S+A:OK
S+A:OK
S+A:OK
S+A:OK
S+A:OK
S+A:OK