PATKAU | MJMA

ASSOCIATED ARCHITECTS

TRANSMITTAL

ATTENTION Ryan Going DATE August 01, 2023

FROM Leland Dadson PROJECT AWT 1802 (UofT)

SUBJECT Shop Drawing, SENT BY Procore


Busways - Busducts

TO Pomerleau Construction
185 The West Mall, suite 1100
Toronto, ON, M9C 5L5

Dear Ryan,

Please refer to the attached reviewed submittal.

Best regards,

Ryan Mitchell

ENCLOSED:

PGE-UTAT--Shop-Drawing-Submittal---Bus-Ducts

Patkau I MJMA Academic Tower


425 ad elaid e s treet w es t level 6
toron to on tario m5v 3 c1
41 6 59 3 67 96
www .m jm a.c a ww w.p atkau .c a
1100 – 100 Sheppard Ave. East, Toronto ON, M2N 6N5

SHOP DRAWING SUBMITTAL REVIEW FORM


416 487 8151 f 416 487 9104 smithandandersen.com

SHOP DRAWING REVIEW


S+A Project No.
maclennan jaunkalns miller architects
18499.001.E.001
THIS SUBMISSION HAS BEEN
This review is for the sole purpose of ascertaining conformance with the REVIEWED ON A SAMPLING BASIS
general design concept and for general arrangement. This shall not mean FOR GENERAL CONFORMITY WITH
approval of the detail design inherent in the shop drawings, responsibility for
THE CONTRACT DOCUMENTS. OUR
which shall remain with the Contractor and such review shall not relieve the
Contractor of their responsibility for errors or omissions in the shop drawings REVIEW DOES NOT RELIEVE THE
or of their responsibility for meeting all requirements of the Contract CONTRACTOR OF ANY CONTRACT
Documents. The Contractor is responsible for dimensions to be confirmed
and correlated at the job site for information that pertains solely to fabrication RESPONSIBILITIES. COORDINATE
processes, quantities or the techniques of construction and installation and WITH ALL INTERFACING TRADES.
for coordination with related work. This form is a record of transmittal to
return the documents to the individual noted above.
ALL DIMENSIONS TO BE VERIFIED.
REVIEWED:
SHOP DRAWING NO.:
26 25 00.00-2.0
DATE:
2023-08-01 REVIEWED AS NOTED: ✔
REVISE & RESUBMIT:
REVIEWED BY:
omar.khan NOT REVIEWED:
DATE: Aug 01, 2023
REVIEWED REVIEWED WITH COMMMENTS ✔ RESUBMIT
REVIEWED BY: rmitchell

General Comments
General comments below shall be read in conjunction with shop drawing review comments and mark-ups made on the
submittal attached herewith.

1. SHORT CIRCUIT RATING NOT REVIEWED. REQUIRE POWER COORDINATION STUDY PRIOR REVIEWING.
2. CONFIRM COPPER BARS HAVE A MINIMUM 98% CONDUCTIVITY
3. PLUG-IN UNITS SHALL PERMIT CONNECTION OF DISCONNECT SWITCHES THAT ARE BREAKER TYPE.
4. PLUG-IN BUSWAYS SHALL CONFORM TO CSA C22.2 NO.27. PROVIDE 10 PLUG-IN OPENINGS PER 3m
SECTION WITH 5 PER SIDE FOR CONNECTION OF PLUG-IN UNITS. PLUG-IN OPENINGS SHALL BE PROVIDED
WITH. ACCESS COVERS AND RIGID MOULDED INSULATORS. ALL OPENINGS TO BE USABLE AT SAME TIME.
5. VOLTAGE DROP TEST RESULT TO BE PROVIDED FOR EACH SIZE OF BUSWAY

Vancouver + Kelowna + Calgary + Edmonton + Winnipeg + London + Toronto + Ottawa + Halifax


Pomerleau Project: 21.0032 UTAT
185, THE WEST MALL, 100 DEVONSHIRE PLACE
SUITE 1100 (POMERLEAU SITE)
TORONTO, Ontario M9C 5L5 TORONTO, Ontario M5S 2C9
P: (416) 207-0848
F: (416) 207-9636

Submittal #26 25 00-2.0 - Busways: Shop Drawings


26 25 00 - Busways
Revision 0 Submittal Manager Vatsal Dave (POMERLEAU INC.)

Status Open Date Created 31 May, 2022

Spec Section 26 25 00 - Busways

Responsible PLAN GROUP INC. Received From Mike Porto (PLAN GROUP INC.)
Contractor

Submit By

Final Due Date 31 Jul, 2023 Lead Time

Cost Code

Location Type 2 - EN - Shop Drawings

Approvers Domenic Francone (POMERLEAU INC.), Ryan Mitchell (MACLENNAN JAUNKALNS MILLER ARCHITECTS LTD.), Contract
Admin Toronto (SMITH AND ANDERSEN CONSULTING ENGINEERING)

Ball in Court Ryan Mitchell (MACLENNAN JAUNKALNS MILLER ARCHITECTS LTD.), Contract Admin Toronto (SMITH AND ANDERSEN
CONSULTING ENGINEERING)

Distribution Michael Baioff (SMITH AND ANDERSEN CONSULTING ENGINEERING), Paul Gargaro (UNIVERSITY OF TORONTO), Adrian
Phillips (UNIVERSITY OF TORONTO), Omar Khan (SMITH AND ANDERSEN CONSULTING ENGINEERING), Contract Admin
Toronto (SMITH AND ANDERSEN CONSULTING ENGINEERING), Roy Cloutier (PATKAU ARCHITECTS INC), Leland Dadson
(MACLENNAN JAUNKALNS MILLER ARCHITECTS LTD.), Ryan Mitchell (MACLENNAN JAUNKALNS MILLER ARCHITECTS
LTD.), Nick Gallos (PLAN GROUP INC.), Michael Moreau (PLAN GROUP INC.), Jeremy Brown (PLAN GROUP INC.), Prabhjot
SINGH (PLAN GROUP INC.), Dave Teoli (PLAN GROUP INC.), Mohamed Mamdouh (PLAN GROUP INC.), Ethan Lalonde
(PLAN GROUP INC.), Soha Rahmani (PLAN GROUP INC.), Jonathan Mateer (PLAN GROUP INC.), Tony Tamburello (PLAN
GROUP INC.), Ken GIBSON (PLAN GROUP INC.), Scot Burgess (PLAN GROUP INC.), Richard Sinclair (PLAN GROUP INC.),
Mike Porto (PLAN GROUP INC.), Domenic Francone (POMERLEAU INC.), Cameron Goss (POMERLEAU INC.), Vatsal Dave
(POMERLEAU INC.), Jorge Pimentel (POMERLEAU INC.), Kristopher Deutschendorf (POMERLEAU INC.), Aaron Odd
(POMERLEAU INC.), Douglas Gair (POMERLEAU INC.), Kateryna Lytovchenko (POMERLEAU INC.), Adam Phillips
(POMERLEAU INC.), Ryan Going (POMERLEAU INC.)

Description Hi

Please find attached Busways (26 25 00) Shop Drawing submittal for your review.
As part of this feedback, please ensure all associated Consultant input is provided.
Note: This item is a long lead time and would require timely response in order
to avoid any delays in procurement.

Thanks!
LEED No

Submittal Workflow
Name Sent Date Due Date Returned Date Response Attachments

General Information PGE-UTAT- Shop Drawing Submittal - Bus


Attachments Ducts-12 Jul 2023.pdf

Pomerleau Page 1 of 2 Printed On: 1 Aug, 2023 02:22 PM EDT


Submittal #26 25 00-2.0 - Busways: Shop Drawings Project: 21.0032 UTAT

Name Sent Date Due Date Returned Date Response Attachments

Domenic Francone 12 Jul, 2023 19 Jul, 2023 17 Jul, 2023 Reviewed as Noted PGE-UTAT- Shop Drawing Submittal - Bus
Ducts-12 Jul 2023 POM
Reviewed.pdf (Current)

Comment 1) Clarify "splash proof" is the same as sprinkler proof as per specifications.
2) Please submit detailed isometric drawings including elevations.

Ryan Mitchell 17 Jul, 2023 31 Jul, 2023 Pending

Contract Admin Toronto 17 Jul, 2023 31 Jul, 2023 Pending

Pomerleau Page 2 of 2 Printed On: 1 Aug, 2023 02:22 PM EDT


Shop Drawing Submittal

Submittal
Project: UTAT AWD 07/12/2023
Date:
100 Devonshire Place,
Address:
Toronto
File / Submittal
PGE - File No. 20
No. :
Specification: 26 25 00
Included: Busways

Tags: Mechanical & Core Bus Ducts


Supplier /
Skyline/SIEMENS
Manufacture:
Architect: MJMA/Patkau
Electrical
Smith & Andersen
Engineer:
General
Pomerleau
Contractor:
For record purpose only equipment has been released for production
and or shipment.
Approval required prior to release for production and or shipment.
Drawings for review.
==============================================================
Pomerleau Comments:
REVIEWED:
REVIEWED AS NOTED:
 1) Clarify "splash proof" is the same as
sprinkler proof as per specifications.
RESUBMIT:
2) Please submit detailed isometric
THIS APPROVAL DOES NOT drawings including elevations.
REMOVE THE MANUFACTURER THE
RESPONSIBILITY FOR COMPLIANCE
WITH CONSULTING ENGINEERS
PLANS & SPECIFICATIONS
PLAN GROUP INC.
DATE CHK’D
07/12/2023 MP
1100 – 100 Sheppard Ave. East, Toronto ON, M2N 6N5

SHOP DRAWING SUBMITTAL REVIEW FORM


416 487 8151 f 416 487 9104 smithandandersen.com

SHOP DRAWING REVIEW


S+A Project No.
maclennan jaunkalns miller architects
18499.001.E.001
THIS SUBMISSION HAS BEEN
This review is for the sole purpose of ascertaining conformance with the REVIEWED ON A SAMPLING BASIS
general design concept and for general arrangement. This shall not mean FOR GENERAL CONFORMITY WITH
approval of the detail design inherent in the shop drawings, responsibility for
THE CONTRACT DOCUMENTS. OUR
which shall remain with the Contractor and such review shall not relieve the
Contractor of their responsibility for errors or omissions in the shop drawings REVIEW DOES NOT RELIEVE THE
or of their responsibility for meeting all requirements of the Contract CONTRACTOR OF ANY CONTRACT
Documents. The Contractor is responsible for dimensions to be confirmed
and correlated at the job site for information that pertains solely to fabrication RESPONSIBILITIES. COORDINATE
processes, quantities or the techniques of construction and installation and WITH ALL INTERFACING TRADES.
for coordination with related work. This form is a record of transmittal to
return the documents to the individual noted above.
ALL DIMENSIONS TO BE VERIFIED.
REVIEWED:
SHOP DRAWING NO.:
26 25 00.00-2.0
DATE:
2023-08-01 REVIEWED AS NOTED: ✔
REVISE & RESUBMIT:
REVIEWED BY:
omar.khan NOT REVIEWED:
DATE: Aug 01, 2023
REVIEWED REVIEWED WITH COMMMENTS ✔ RESUBMIT
REVIEWED BY: rmitchell

General Comments
General comments below shall be read in conjunction with shop drawing review comments and mark-ups made on the
submittal attached herewith.

1. SHORT CIRCUIT RATING NOT REVIEWED. REQUIRE POWER COORDINATION STUDY PRIOR REVIEWING.
2. CONFIRM COPPER BARS HAVE A MINIMUM 98% CONDUCTIVITY
3. PLUG-IN UNITS SHALL PERMIT CONNECTION OF DISCONNECT SWITCHES THAT ARE BREAKER TYPE.
4. PLUG-IN BUSWAYS SHALL CONFORM TO CSA C22.2 NO.27. PROVIDE 10 PLUG-IN OPENINGS PER 3m
SECTION WITH 5 PER SIDE FOR CONNECTION OF PLUG-IN UNITS. PLUG-IN OPENINGS SHALL BE PROVIDED
WITH. ACCESS COVERS AND RIGID MOULDED INSULATORS. ALL OPENINGS TO BE USABLE AT SAME TIME.
5. VOLTAGE DROP TEST RESULT TO BE PROVIDED FOR EACH SIZE OF BUSWAY

Vancouver + Kelowna + Calgary + Edmonton + Winnipeg + London + Toronto + Ottawa + Halifax


S+A:THIS VERTICAL BUS SHOULD
EXTEND FROM THE TAPBOX TO THE
CEILING OF L4.5 ELECTRICAL ROOM.
D:\Drafting\Approvals\3009952034\Drawings\3009952034-1.dwg

S+A:TAP BOX IS TO BE LOCATED ON FLOOR OF L4.5


ELECTRCIAL ROOM

S+A: NOTED EXPANSION SECTION.


CONTRACTOR TO CLARIFY WHETHER
ADDITIONAL EXPANSION JOINTS ARE
PA+MJMA COMMENTS,
NECESSARY PER CONCERNS REGARDING
All tap boxes to be coordinated and located on DEFLECTION
Timber shop drawings where necessary.

S+A:OK
S+A:OK
S+A:OK

SIEMENS Industry, Inc. - Roebuck, SC


S+A:OK S+A:OK
S+A:OK
S+A:OK

S+A:CONFIRM THIS IS EQUIVALENT


TO CSA TYPE 1 SPRINKLER PROOF
ENCLOSURE
SIEMENS Industry, Inc. - Roebuck, SC

S+A: CONTRACTOR TO CLARIFY WHETHER


ADDITIONAL EXPANSION JOINTS ARE
NECESSARY AT EVERY LEVEL PER
CONCERNS REGARDING DEFLECTION
D:\Drafting\Approvals\3009952034\Drawings\3009952034-2.dwg
S+A:THIS VERTICAL BUS SHOULD
EXTEND FROM THE TAPBOX TO THE
CEILING OF L4.5 ELECTRICAL ROOM.
D:\Drafting\Approvals\3009952034\Drawings\3009952034-3.dwg

S+A:TAP BOX IS TO BE LOCATED ON FLOOR OF L4.5


ELECTRCIAL ROOM

S+A: NOTED EXPANSION SECTION.


CONTRACTOR TO CLARIFY WHETHER
ADDITIONAL EXPANSION JOINTS ARE
PA+MJMA COMMENTS,
NECESSARY PER CONCERNS REGARDING
All tap boxes to be coordinated and located on DEFLECTION
Timber shop drawings where necessary.

S+A:OK
S+A:OK
S+A:OK

SIEMENS Industry, Inc. - Roebuck, SC


S+A:OK S+A:OK
S+A:OK
S+A:OK

S+A:CONFIRM THIS IS EQUIVALENT


TO CSA TYPE 1 SPRINKLER PROOF
ENCLOSURE
SIEMENS Industry, Inc. - Roebuck, SC

S+A: CONTRACTOR TO CLARIFY WHETHER


ADDITIONAL EXPANSION JOINTS ARE
NECESSARY AT EVERY LEVEL PER
CONCERNS REGARDING DEFLECTION
D:\Drafting\Approvals\3009952034\Drawings\3009952034-4.dwg
D:\Drafting\Approvals\3009952034\Drawings\3009952034-5.dwg

SIEMENS Industry, Inc. - Roebuck, SC


D:\Drafting\Approvals\3009952034\Drawings\3009952034-6.dwg

SIEMENS Industry, Inc. - Roebuck, SC

You might also like